Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAccepted-AOC | ₹45.3 L Quoted ₹45.4 L | L1 | Accepted-AOC Lowest Amount Quoted BY MANISEKARAN KALIYAPERUMAL |
| 2 | L2₹45.3 LRejected-Finance | ₹45.3 L | L2 | Rejected-Finance highest Amount Quoted |
| Sl No | Description | Qty | Unit | N RAMALINGAM L2 | MANISEKARAN KALIYAPERUMAL L1 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the road @ Rettai Vaikkal to Vasan Veli Road In Nachikurichi Panchayat. (TRY/MKDM/VPR/R360) in Manikandam Block in Tiruchirappalli District under Layout Regularization & Development Fund 2025-26
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 770 | Sqm | 23.34 ₹17,971.80 | 23.33 ₹17,964.10 |
| 2.00 | Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., | 110.88 | Cum | 340.75 ₹37,782.36 | 340.58 ₹37,763.51 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 288.75 | Cum | 3,170.39 ₹9.2 L | 3,168.8 ₹9.1 L |
| 4.00 | Providing and laying Primer Coat over the WMM surface using 7.00 Kg of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications. | 2,310 | Sqm | 87.95 ₹2.0 L | 87.91 ₹2.0 L |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.50 Kg of bitumen emulsion RS-1 of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications. | 2,310 | Sqm | 20.75 ₹47,932.50 | 20.74 ₹47,909.40 |
| 6.00 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 57.75 | Cum | 12,317.58 ₹7.1 L | 12,311.42 ₹7.1 L |
| 7.00 | Providing for HM Stone | 2 | Nos | 574.36 ₹1,148.72 | 574.07 ₹1,148.14 |
| 8.00 | Strengthening the road @ Vasan Veli 5th Cross to 12th Cross In Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under Layout Regularization & Development Fund 2025-26
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 760 | Sqm | 23.34 ₹17,738.40 | 23.33 ₹17,730.80 |
| 9.00 | Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., | 109.44 | Cum | 340.75 ₹37,291.68 | 340.58 ₹37,273.08 |
| 10.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 285 | Cum | 3,170.39 ₹9.0 L | 3,168.8 ₹9.0 L |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
19 Feb 2026, 4:00 pmClosed
BLOCK DEVELOPMENT OFFICER (VP)
BLOCK DEVELOPMENT OFFICER (VP),PANCHAYAT UNION OFFICE MANIKANDAM
Strengthening the road at Rettai Vaikkal to Vasan Veli Road and Vasan Veli 5th Cross to 12th Cross In Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under Layout Regularization and Development Fund 2025-26
2026_RDTN_660911_1
A3/755/2026 Dt 12-02-2026
Open Tender
Civil Works
90 days
PANCHAYAT UNION OFFICE MANIKANDAM
Refer Tender Notice
5 documents required · 5 mandatory
₹0
₹46,000
Yes
23 Feb 2026
19 Feb 2026
19 Feb 2026
19 Feb 2026
19 Feb 2026
19 Feb 2026
Strengthening the road @ Rettai Vaikkal to Vasan Veli Road In Nachikurichi Panchayat. (TRY/MKDM/VPR/R360) in Manikandam Block in Tiruchirappalli District under Layout Regularization & Development Fund 2025-26 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer Coat over the WMM surface using 7.00 Kg of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.50 Kg of bitumen emulsion RS-1 of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing for HM Stone
Strengthening the road @ Vasan Veli 5th Cross to 12th Cross In Nachikurichi Panchayat in Manikandam Block in Tiruchirappalli District under Layout Regularization & Development Fund 2025-26 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer Coat over the WMM surface using 7.00 Kg of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.50 Kg of bitumen emulsion RS-1 of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing for HM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_793070.xls
BOQ • 1.17 MB
PriceBidcommunity.pdf
Additional Documents • 0.21 MB
TechnicalBidcommunity.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid