Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance MATHRAKAT HO PERINGALA P O KUMARAPURAM ALUVA 633565 | 633565 | L1 | Accepted-Finance Lowest rate |
Tender Value
₹4.1 L
EMD Value
₹10,188
Closing Date
6 Jan 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Jishakumar CB
O/o the Assistant Executive Engineer(Additional charge),Dredger sub Division Ernakulam, Civilstation, Kakkanad, Ernakulam
GENERAL-Pathalam RCB-Alignment correction of hoisting mechanism of downstream side lock gate-General Mechanical Work
2024_Irrig_709428_1
IRR/MH/TR/2008/2024_16_1_1/1
Open Tender
Repair and Maintenance Works
Item Rate
90 days
Pathalam RCB
Please refer Tender documents
7 documents required · 7 mandatory
₹900
Yes
₹10,188
Yes
11 Feb 2025
30 Dec 2024
9 Jan 2025
30 Dec 2024
6 Jan 2025
30 Dec 2024
30 Dec 2024 - 6 Jan 2025
Amount
Dismantling hoisting mechanism of the downstream loackgate
OD41829/2023-2024:Removing cover of winch unit of the lock gate and stacking it on the hoisting platform including all cost of labor, machinery, tools& plants etc. complete
OD41741/2023-2024:Removing the wire rope from the lock gate safely including all cost of labor, hire charges and conveyance up to storeroom etc complete.
OD41758/2023-2024:Dismantling rope drum of the lock gate and placing it on the hoisting platform including the cost of al labour, conveyance, incidental charges etc complete.
OD41834/2023-2024:Dismantling the Bearing house, pinion shaft, Pinion, pipe shaft etc (one side ) and placing it on the platform including cost of materials, labour etc complete
OD41839/2023-2024:Dismantling electric motor, brake, gear box etc. and placing it on the platform including all cost of material, labor, hire charges etc complete
Checking bend of support stools and correcting bend/ strengthening/fabricating stool support
OD41843/2023-2024:Correcting bend of support stools if needed including all cost of labor, hire charges etc complete
OD41845/2023-2024:Cutting out Stool support and placing it in new position (if needed) for correcting alignment of shaft including cost of labor, hire charges etc complete.
OD41846/2023-2024:Supply of MS plates confirming to IS 2062GrB including the cost of conveyance charges.
85.124:Fabrication and supply of Hoisting bride unit in structural steel confirming to IS2062 Gr including ladder, covers for hoisting unit etc as per approved specifications, drawings and directions of departmental officer at site including cost of labour, machinery, incidental and handling charges for fixing handrails and allied works etc complete but excluding material already supplied and weight of pipes for hand rails etc
Rearranging Frame position to avoid rubbing of rope
OD41901/2023-2024:Cutting fame of drum support and fixing it in new position including all cost of labor, hire charges, conveyance etc complete
OD41902/2023-2024:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges.
85.124:Fabrication and supply of Hoisting bride unit in structural steel confirming to IS2062 Gr including ladder, covers for hoisting unit etc as per approved specifications, drawings and directions of departmental officer at site including cost of labour, machinery, incidental and handling charges for fixing handrails and allied works etc complete but excluding material already supplied and weight of pipes for hand rails etc
providing new pipe shaft
OD41904/2023-2024:Supplying new pipe shaft for the downstream lock gate including all cost of labor, materials, conveyance ,hire charges etc. complete.
OD41905/2023-2024:Supply of Flage coupling for pipe shaft including all cost of material, labor, conveyance etc complete.
Refixing hoisting mechanism in correct alignment and conducting trialrun
OD41978/2023-2024:Refixing electric motor, brake, gear box in correct alignment including all cost of material, labor, hire charges etc complete
OD41982/2023-2024:Fixing pipe shaft in correct alignment including the cost of labor, hire charges etc complete
OD41984/2023-2024:Refixing the Bearing house, pinion shaft, Pinion etc (one side ) in correct alignment including cost of materials, labour etc complete
OD41995/2023-2024:Refixing rope drum of the lock gate in correct alignment including the cost of al labor, conveyance, incidental charges etc. complete.
OD41996/2023-2024:Fixing the wire rope and conducting trial run of the lock shutter includes all cost of labor, materials, tools and tackles, conveyance etc complete.
Bidder Name
P V Moosa Engineering Contractor
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1140887.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .