| 1 | L1₹1.5 CrAccepted-AOC C O SRI HANUMAN PRASAD BAJAJ WARD NO 02 U T ROAD P O DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹1.5 Cr | L1 | Accepted-AOC Awarded |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
| Sl No | Description | Qty | Unit | ASHOK KUMAR BAJAJ L1 |
|---|---|---|---|---|
| 1.00Construction of D/S Cutoff wall | ||||
| 1.01 | Providing and driving 'Z' type steel sheet pile of 0.69 M effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted). | 60 | sqm | 22,424.32 ₹13.5 L |
| 1.02 | C.C work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately). | 154 | cum | 8,236.89 ₹12.7 L |
| 1.03 | Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed. | 11.64 | Qntl | 11,814.91 ₹1.4 L |
| 1.04 | Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed. (ii) With dewatering | 52.5 | cum | 2,959.65 ₹1.6 L |
| 1.05 | Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water
necessary complete as directed with a lead upto 30 M and lift upto 1.50 M. | 120 | cum | 281.91 ₹33,829.20 |
| 2.00Construction of Gabion Wall | ||||
| 2.01 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2 mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 1,562.4 | cum | 3,797.74 ₹59.3 L |
| 2.02 | Supplying & laying of drainage composite for use behind walls, between two different fills, alongside drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also be working as separation or protecting layers. The draining three dimensional core will have a “W” configuration as longitudinal parallel channels. Minimum thickness to be 7.2 mm, with two filtering UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75 mm charecteristic opening size (O90) of 110 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20 kPa pressure and tensile strength of 18 kN/m , with mass per unit area of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all complete as per directions of Engineer in charge. | 1,148 | sqm | 897.15 ₹10.3 L |
| 2.03 | Turfing with grass sode of largest possible rectangular and minimum size 30 cm X 30 cm X 10 cm placing closely after dressing hard the surface and fixing sode with split bamboo pegs, watering till the grass grows with lead up to 90 M and lift of 1.50 M, complete as directed. | 490 | sqm | 25.59 ₹12,539.10 |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
26 Feb 2026, 2:00 pmClosed
Chief Engineer Irrigation Assam
o-o the Chief Engineer Irrigation Assam Chandmari , Guwahati-03
Bank Protection at Panchamukhi FIS under SDMF for the year 2025-26 under Udalguri Mazbat Division (Irrigation), Udalguri Package_10
2026_ID_50784_10
NIT NO.8 (SDMF) 2025-26 Date_03.02.2026
Open Tender
Civil Works
365 days
Udalguri
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,400
₹3.4 L
Yes
o-o the Chief Engineer Irrigation Assam Chandmari
8 May 2026
4 Feb 2026
26 Feb 2026
4 Feb 2026
26 Feb 2026
10 Feb 2026
6 Feb 2026
Construction of D/S Cutoff wall
Providing and driving 'Z' type steel sheet pile of 0.69 M effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted).
C.C work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed. (ii) With dewatering
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Construction of Gabion Wall
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2 mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge.
Supplying & laying of drainage composite for use behind walls, between two different fills, alongside drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also be working as separation or protecting layers. The draining three dimensional core will have a “W” configuration as longitudinal parallel channels. Minimum thickness to be 7.2 mm, with two filtering UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75 mm charecteristic opening size (O90) of 110 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20 kPa pressure and tensile strength of 18 kN/m , with mass per unit area of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all complete as per directions of Engineer in charge.
Turfing with grass sode of largest possible rectangular and minimum size 30 cm X 30 cm X 10 cm placing closely after dressing hard the surface and fixing sode with split bamboo pegs, watering till the grass grows with lead up to 90 M and lift of 1.50 M, complete as directed.
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed. (ii) With dewatering
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Panchamukhi.pdf
Tender Documents • 1.49 MB
BOQ_80833.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid