Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹91.1 L
EMD Value
₹1.8 L
Closing Date
27 Nov 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE/CED-IV
EE/CED-IV/SDB MAYUKH BHABAN 3rd FLOOR
Construction of Bullah Pilling for Protection of Bituminous Road from Moukhali Kheya Ghat
2025_SAD_940456_20
WBSDB/EE/ CED-IV/NIT-23(e)/2025-26
Open Tender
CIVIL WORKS
Percentage
180 days
EE/CED-IV/SDB MAYUKH BHABAN 3rd FLOOR
Please refer Tender documents.
4 documents required · 4 mandatory
₹1.8 L
Yes
25 May 2026
7 Nov 2025
2 Dec 2025
7 Nov 2025
27 Nov 2025
10 Nov 2025
Laying and Jointing PVC Pipe. Heading
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end. (i)10 cm dia.
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed. Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end. (ii)12.5 cm dia.
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles Note: 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end. 2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter. 3) For driving done by pile engine set (without staging) under specific instruction of Engineer-in-charge, the rates will be enhanced by ` 4.00 per meter. 4) For driving done by pile engine set (with heavy staging or from specially made pontoon) under specific instruction of Engineer-in-charge, the rates will be enhanced by ` 7.00 per metre. (i)10 cm dia.
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles Note: 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end. 2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter. 3) For driving done by pile engine set (without staging) under specific instruction of Engineer-in-charge, the rates will be enhanced by ` 4.00 per meter. 4) For driving done by pile engine set (with heavy staging or from specially made pontoon) under specific instruction of Engineer-in-charge, the rates will be enhanced by ` 7.00 per metre. (ii)12.5 cm dia.
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (a) Width of thinner end above 10 cm.and less than 15cm (i) Jhaw / Eucalyptus.
Supplying empty Cement bags in good condition
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of filling materials, (Earth or sand) and gunny bags.
Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre Including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile.
Earthwork in excavation In all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking A) Beyond 500 metre and upto 1.00 Km
Direction and Place Identification Signs with size more than 0.9 sqm size Board. Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision)..
Add 18% for GST
Add 1% Cess
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.65 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 1.01 MB
BOQ_2225195.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .