All Bids
RequiredBidders with poor performance in executing the previous purchase orders/ bidders who have executed partial supplies during the delivery period/ bidders who have not supplied the material even after several notices/ bidders who supplied the material lately and suffered the works/ bidders whose supplies failed during guarantee performance period/ black listed firms are not eligible for quoting as
RequiredResponsibility for correctness of the information submitted in the online bid lies with bidder. If any information furnished in the bid is proved to be false at a later date, the bid will be rejected.
RequiredBidder should mention P&F charges, freight and Transit Insurance charges in terms of percentage only, if any extra applicable
RequiredBidder should upload GST No. and PAN card details
RequiredBidder should upload technical bid with anyone of the above mention make, 6 or 8 digit HSN codes and GST of the offered material for each item..
RequiredBidder should have an experience of supplying the same material to AP/TGGENCO/NTPC/BHEL/Singareni Thermal Power Plant etc. or any other power stations and shall furnish the documentary evidence such as performance certificates/PO copies/authorization letter issued by the original manufacturer of the same material in support of qualifying requirements failing which offers are liable for rejectio
RequiredBidder shall quote for JAQUET/BRAUN-GmbH/ Bentley Nevada makes only and the make should be mentioned in the uploaded documents, otherwise bid will not be considered for opening of price bid.
RequiredBidder shall confirm1:1 compatibility .The supplied model shall be tested at site in place of the existing model. If found to be incompatible, the material will be rejected and also should submit 1:1 interchangeability certificate along with the material.
RequiredBidders who are technically suitable as per tender specifications enclosed can only be considered.