11 Feb 2026, 6:00 pmClosed
Executive Engineer, Gir Somnath Irrigation Division, Veraval Ishvar Complex, 3rd Floor, A-Wing, Opp. Reliance Mall, Veraval-Junagadh Road, Veraval-362265
Restoration of Canal System Network of Hiran-2 Irrigation Scheme Affected by Flood 2025.
272743
Online E-Tender Notice No. 34 of 2025-26
Open
Civil - All
Works
Gir Somnath
6 documents required · 6 mandatory
₹1,500
Yes
Executive Engineer,Gir Somnath Irrigation Division,Veraval
₹33,000
Yes
4 Feb 2026
4 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
1 Providing local stone or such other 367.63 Cum 3926.00
hard stone bela or block in course
dressed sand stone /lime stone
masonry in super structures incl
striking out joints curing etc complete
as directed in C.M. 1:5
2 Dismantling stone/brick masonry & 370.47 Cum 616.00
stacking of useful and unuseful
material from the dismantled
materials as directed etc complete.(a)
In cement mortar
3 Cement plaster 15mm thick in single 1946.15 Sm 216.00
coat to CC/RCC /masonry work in C.M.
1:3 incl finishing,curing, scaffolding
etc complete.a) UPTO 6.0 Mt HEIGHT
4 Providing & Fixing H.R. & C.R. gates for 4747.00 Kg 89.00
canal including all materials , labours,
fabrication transporting fixing to site
of work all lead & lift including one
coat of primer and two coats of oil
painting as directed including square
threaded screw, bearing, nuts,
handles, and locking arrangements
5 Prov. & Laying in position "NOMINAL 81.20 Cum 3816.00
MIX' cement concrete using cement,
sand and crushed aggregate by mass
and machine mix for C.C. work incl.
necessary formworks centering
scaffolding compaction by mechanical
vibrator,curing as directed with all
lead & lift etc complete.C) Concrete
grade 1:2:4 and MSA-40mm
6 Earth work in embankment from 541.00 Cum 78.00
borrow pits in all sort of soil and soft
murrum or other uitable strata as
directed incl breaking clods and
dressing to the design section with
lead as under and all lift incl.site
clearance etc comp. For all canal
capacity & Without rolling and
watering 200mt to 1000 mt. lead
7 Clearing the silt from canal /drain bed 270.00 Cum. 260.00
by digging the same to the required
bed level and gradient including
depositing the excavated earth
regularly on spoil bank for utilizing
the same for preparing the bund after
bracking the clods as and where
directed for lead upto 30 mt and lift as
under. B) Depth 3.0 to 6.0 mt
( Excluding weed cutting )
8 Excavation in all sort of strata and 288.00 Cum. 83.00
formations incl. depositing the
unuseful excavated stuff as and where
directed incl sorting and stacking
useful materials as directed upto
mt lead etc. complete incl.
dewatering. ( Depth 0 TO 3.0 mt )
(For all type canal & foundation
trenches of C.D. works )
A) IN OVERBURDEN INCL. HARD
9 Providing, supplying at site, laying and 30.00 Rm. 3088.00
fixing in position under ground, R.C.C
Hume pipe of NP-2 class of BIS
standard incl filling the joints with
cement mortar 1:1 with providing
necessary collars etc complete with
inclusive of testing with working
pressure and all lead and lift. (I)
10 Providing and fixing post and pipe 135.00 Rm. 1202.65
railing as per detailed drawing
including 3 coats of painting to steel
I/We am/are willing to carry out the work at… % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 10 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Gir Somnath Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Hiran-II Canal Structure repair.pdf
BOQ.pdf
Tender Notice No 34 of 2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .