Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC | ₹3.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 CrRejected-Finance | ₹3.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹3.3 CrRejected-Finance | ₹3.3 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹3.5 CrRejected-Finance PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹3.5 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹3.8 CrRejected-Finance | ₹3.8 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | VESTOLUCK CONSTRUCTION AND SUPPLIERS L3 | S.P.R.U INFRATECH PRIVATE LIMITED L4 | Radheshyam Dubey L5 | VINAY KUMAR SINGH L2 | M/S MAA BHAWANI CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of old V.R.B. and proper disposal including all cost of materials,T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 307.6 | Cum | 530 ₹1.6 L | 125 ₹38,450 | 530 ₹1.6 L | 490 ₹1.5 L | 414.5 ₹1.3 L |
| 2.00 | Dismantling of old & damage Reinforced cement concrete work and its proper disposal including all cost of materials, T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications. | 89.6 | Cum | 699.3 ₹62,657.28 | 125 ₹11,200 | 699.3 ₹62,657.28 | 600 ₹53,760 | 545.4 ₹48,867.84 |
| 3.00 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge and as per I.D. specifications. | 2,373.8 | Cum | 85 ₹2.0 L | 58 ₹1.4 L | 85 ₹2.0 L | 54 ₹1.3 L | 36.36 ₹86,311.37 |
| 4.00 | Laying C.C. 1:2:4 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications. | 178.45 | Cum | 10,500 ₹18.7 L | 10,000 ₹17.8 L | 11,000 ₹19.6 L | 9,200 ₹16.4 L | 8,876.75 ₹15.8 L |
| 5.00 | Laying R.C.C. work in 1:1:2 (M25) cement ,sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier , abutment , raft, wing wall& parapet including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge. | 1,575.4 | Cum | 11,000 ₹1.7 Cr | 11,295 ₹1.8 Cr | 12,000 ₹1.9 Cr | 9,300 ₹1.5 Cr | 10,179.82 ₹1.6 Cr |
| 6.00 | Bending, binding cutting placing in position steel as Reinforcement including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 143.3 | MT. | 62,000 ₹88.8 L | 69,000 ₹98.9 L | 65,000 ₹93.1 L | 67,000 ₹96.0 L | 57,797.54 ₹82.8 L |
| 7.00 | Centering & Shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications. | 4,616.45 | Sqm | 450 ₹20.8 L | 600 ₹27.7 L | 644 ₹29.7 L | 643 ₹29.7 L | 509.04 ₹23.5 L |
| 8.00 | Supply and laying of joint filler board in construction joint including cost of all material labour T&P required for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications. | 91.75 | Sqm | 1,586 ₹1.5 L | 80 ₹7,340 | 1,600 ₹1.5 L | 1,650 ₹1.5 L | 596.3 ₹54,710.53 |
| 9.00 | Supply & Laying one layer of tarfelt / Membrane sheet below slab ,Abutment ,pier including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 542.7 | Sqm | 215.53 ₹1.2 L | 100 ₹54,270 | 220 ₹1.2 L | 200 ₹1.1 L | 87.26 ₹47,356 |
| 10.00 | Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-charge and as per I.D. specifications. | 13,148.8 | Cum | 50 ₹6.6 L | 50 ₹6.6 L | 140 ₹18.4 L | 102 ₹13.4 L | 40 ₹5.3 L |
Tender Value
Refer Docs
EMD Value
₹8.4 L
Closing Date
12 Mar 2025, 1:30 pmClosed
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
Reconstruction of 5 no. V.R.B on Dohrighaat sahayak main canal in District Ballia.
2025_UPIDC_1014395_3
09/S.E./2024-25
Open Tender
Civil Works - Canal
365 days
Ballia
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.4 L
Superintending Engineer, Drainage Circle, Ballia
17 Apr 2026
6 Mar 2025
12 Mar 2025
6 Mar 2025
12 Mar 2025
6 Mar 2025
6 Mar 2025
Amount
Dismantling of old V.R.B. and proper disposal including all cost of materials,T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Dismantling of old & damage Reinforced cement concrete work and its proper disposal including all cost of materials, T&P and labours for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge and as per I.D. specifications.
Laying C.C. 1:2:4 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-charge and as per drawing and I.D. specifications.
Laying R.C.C. work in 1:1:2 (M25) cement ,sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier , abutment , raft, wing wall& parapet including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
Bending, binding cutting placing in position steel as Reinforcement including cost of steel carriage, bending, cutting, placing in position and binding with steel binding wire etc. including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.
Centering & Shuttering for R.C.C. work including all cost of materials,T&P labours and other accessories with all leads and lift/down for proper completion of work and as directed by Engineer-in-Charge as per I.D. specifications.
Supply and laying of joint filler board in construction joint including cost of all material labour T&P required for proper completion of work as directed by Engineer-in-Charge and as per drawing and I.D. specifications.
Supply & Laying one layer of tarfelt / Membrane sheet below slab ,Abutment ,pier including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-charge and as per I.D. specifications.
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-charge and as per I.D. specifications.
Brick on edge soling with 1st class brick( on approach slab of culvert both side ) including preparation of sub-grade to prescribed camber, filling joint with Local sand including cost of material, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Boring with 150 mm dia casing pipe including lowering and extension of assembly loading unloading and carraige including all cost of materials,T&P and labours and other accessories required for proper completion of work as per of direction of Engineer in Charge.
Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc. for proper completion of work as directed by Engineer-in-Charge as per I.D.specifications.
Supply and Fixing of 75 mm P.V.C. Pipe for Drainage spout( on slab) and weep hole( on wing wall & abutment) including cost of all materials, labour and T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Plastic paint (nerolac,asian apex, branded company) of culvert of required shade including cost of all materials, labour and T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
Earth work in removing of diversion bund and correction of bank & section of canal including all cost of labour and T&P with proper completion of work approved by Engineer-in-charge as per drawing and I.D. specification.
Painting/Printing letter (name of canal & chainage) upto 20 cm height including cost of all materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge and as per I.D. specifications.
VINAY KUMAR SINGH (BID ID -5042284)
VESTOLUCK CONSTRUCTION AND SUPPLIERS (BID ID -5031413)
S.P.R.U INFRATECH PRIVATE LIMITED (BID ID -5041659)
Radheshyam Dubey (BID ID -5032389)
stage.html
html • 0.05 MB
technical_1826031.pdf
techsummary_1826031.pdf
finance_1826031.pdf
BOQ Comparative Chart
xlsx
finsummary_1826031.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.18 MB
FINALBID_Lot_3_Bui.pdf
Tender Documents • 0.85 MB
BOQ_1826031.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid