| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.7 CrRejected-Finance H NO 368 ZUAREM TUEM PERNEM GOA | ₹1.7 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SAIBINI CONSTRUCTION L2 | RAF Sequeira L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil | 1,677 | Cum | 220 ₹4.4 L | 250.01 ₹4.9 L |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 273 | Cum | 2,211 ₹7.1 L | 1,658.25 ₹5.3 L |
| 3.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile | 3,250 | RM | 300 ₹11.5 L | 350 ₹13.4 L |
| 4.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) : Upto 2.5 meters long pile | 2,860 | RM | 180 ₹6.1 L | 170.15 ₹5.7 L |
| 5.00 | Centering & shuttering including Strutting, Propping & removal of forms for : Foundations, Footings, Bases for columns | 3,510 | Sq.m | 407 ₹16.9 L | 350.5 ₹14.5 L |
| 6.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto Plinth Level. | 1,677 | Cum | 6,000 ₹1.2 Cr | 5,300.11 ₹1.0 Cr |
| 7.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge : 75 mm dia | 227.5 | RM | 300 ₹80,535 | 300.51 ₹80,671.91 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
29 Dec 2025, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Construction of retaining wall from Tonca bridge to Chowdar, Tonca Waddo at V.P. St. Estevam in Cumbharjua Constituency.(Re-tender)
2025_WRD_26626_1
6-9/WDI/WRD/ASW/2025-26/e-32
Open Tender
Miscellaneous Works
120 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹3.3 L
15 Apr 2026
26 Nov 2025
30 Dec 2025
26 Nov 2025
29 Dec 2025
26 Nov 2025
Amount
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) : Upto 2.5 meters long pile
Centering & shuttering including Strutting, Propping & removal of forms for : Foundations, Footings, Bases for columns
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto Plinth Level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge : 75 mm dia
SAIBINI CONSTRUCTION (BID ID -57340)
stage.html
html • 0.04 MB
technical_27056.pdf
techsummary_27056.pdf
finance_27056.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Tendernotice_2.pdf
PDF • 1.08 MB
BOQ_27056.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid