Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 CrAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | welkin india inc L1 |
|---|---|---|---|---|
| 1.00 | FOUNDATION - PILES & PILE CAPS: - Bored cast-in situ M-35 grade with minimum cement content 419 kg per cum of concrete in R.C.C pile 1000 mm dia excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000m as per clause 1100, 1600 & 1700 in MoRT&H specification (MoRT&H 12.24) (i) 1000mm dia piles (A) The scope of work in the above items include: (1) The cost of all initial layout of piles and setting out, initial excavation, if any. (2 a) The cost of boring through all types of soils/existing road/ pavement, removal of all obstruction like boulders, old foundation concrete or rock to be paid in relevant item above by chiseling or any other method as approved by the Engineer-in-charge. If a bore is abandoned for any reason no payment shall be made for such incomplete boring and shifting of the equipments. (2 b) The cost of filling up of the empty bore, if required. (3) The cost of preparation, circulation and handling of bentonite slurry. (4) The cost of disposal of all spoil, bentonite waste to keep the work area neat. (5) The cost of providing temporary liner and its withdrawal, if required below adjoining ground level (irrespective of the R.L of the adjoining ground level) for vertical piles). (6) The cost of providing and mixing all ingredients of cement concrete (except reinforcement steel) including admixtures, with batching plant, transporation, placement of concrete by tremie pipe for the required lengths of pile including providing cover blocks, stiffeners, handling bars etc. for safe handling of reinforcement cage. (7) The cost of breaking of pile head not earlier than 3 days after concreting and to remove spoil concrete to bring the pile head to the socketing level including cleaning and arranging the extended reinforcement bars as per drawings. (8) The cost of working for all leads, lifts, pumping / bailing out of water, labour, material and equipment etc. (9) The cost of mobilizing to site, installation at different locations transferring / dismantling, shifting, reinstalling and removal from site of the piling rigs and / or other equipments and all accessories including working plateforms. (10) The cost of identification, protection and maintenance of existing services, if any, which in the opinion of Engineer-in-charge are likely to be affected by piling operation incl. temporary shifting of such services to facilitate piling job shall also have to be done, if so required by the Engineer-in-charge and the cost for the same as assessed by the engineer-in-charge shall be reimbursable. (11) The cost of barricading and all traffic safety requirements as specified in the tender document. (12) The cost of all incidentals, labour, material, equipment and works required to execute the job. The item also includes any other incidental expenditures for completing the job as per the direction of the engineer-in-charge. (13) The item includes the cost of testing of all the materials involved in the execution of the item as per QAP. (B) Mode of measurement: (14) Initial vertical load testing, horizontal load testing, routine load testing required as per IS : 2911 part (iv) and as per MoRT&H specification. (1) Length of pile shall be measured from cut off level to the tip of the pile correct to a cm in case where the pile is terminated. The rock level shall be determined as per criteria mentioned elsewhere in the tender document for payment of boring through rock. (2) Reinforcement steel shall be measured & paid separately. | 1,940 | Mtr. | 9,500 ₹1,84,30,000 Lowest |
| 2.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (MoRT&H no. 12.1 (B)) | 1,186.8 | cum | 150 ₹1,78,020 Lowest |
| 3.00 | Providing and laying of PCC M-15 with minimum cement content of 275 kg per cum of concrete for leveling course 150 mm thick below the pile cap as per clause 1100 and 1700 of MoRT&H specification (MoRT&H 12.39) | 71.72 | cum | 4,000 ₹2,86,868 Lowest |
| 4.00 | Cement concrete for reinforced concrete (M-35) with minimum cement content of 422 kg per cum of concrete in pile cap complete as per drawing and technical specifications as per clause 1100, 1500 & 1700 of MoRT&H specification. (MoRT&H 12.38) (D) (A) The scope of work in the items include: (1) The cost of all initial layout and setting out work including identification of existing services, if any. (2) The cost of all pumping/bailing out of water, including its labour, material and equipments. (3) The cost of providing centering and shuttering including its erection, dismantling and removal of formwork including all leads and lifts with all required tools and plants to the required line and level. (4) The cost of providing and mixing all ingredients (except reinforcement steel) including admixtures etc. with batching plant, transportation, placement, finishing and curing of concrete. (5) The cost of maintenance and protection of existing services, if any which in the opinion of Engineer-in-charge are likely to be affected by any related activities including temporary shifting of such services to facilitate construction of pile cap work shall also have to be done, if so required by the Engineer-in-charge, and the cost for the same as assessed by the Engineer-in-charge shall be reimbursable. (6) The cost of installation of any fixture into the pile cap (cost of fixture to be paid separately) (7) The cost of barricading and all safety requirements as specified elsewhere in the tender document. (8) The cost of testing of all the materials, involved in the execution of items as per QAP. (9) The cost of all incidental labour, materials, equipment and works required to execute the job as per directions of engineer-in-charge. (B) Mode of measurement: (1) Measurements shall be made for the finished volume of reinforced cement concrete restricted to volume as per approved drawing (excluding cost of reinforcement steel only). Quantity of concrete of piles, which has gone into the pile caps shall be deducted. Reinforcement shall be measured & paid separately | 744.98 | cum | 7,000 ₹52,14,825 Lowest |
| 5.00 | Steel Reinforcement: Supply, cutting, bending, with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe-500 as per relevant BIS specification and drawing. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars , labour, transportation, storing and all other incidental charges, tools & plants etc complete. As per clause No. 1600 of MORT&H specification 2013 /Latest edition for road and bridges work (MORT&H 1600). (MORT&H 12.40). | 213.37 | M.T | 75,000 ₹1,60,02,525 Lowest |
| 6.00 | SUBSTRUCTURE- Piers, Abutments and Bearings: - Reinforced cement concrete (M-35) with minimum cement content of 422 kg per cum of concrete in abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. complete as per drawing and technical specifications as per clause 1500, 1700 & 2200 of MoRT&H specification (MoRT&H no. 13.5 (h)) Height upto 5 met. (A) The scope of work in the item includes (1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, rection & removal of staging, scaffolding and form liner etc, for piers, pier caps, bearing pedestals and other works as stated in other parts of the tender document. (2) The cost of casting of a mock pier at casting yard true to line, level and shape s per the direction of the Engineer-in-charge. (3) The cost of casting of pier, pier caps, abutment, abutment caps etc. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge. (4) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter. (5) The cost of barricading and all safety requirements as mentioned elsewhere in the tender documents. (6) Installation of any fixtures into pier/pier cap etc (cost of fixtures in any, to be paid separately. (7) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge. (8) The cost of testing all materials involved in the execution of the item as per QAP. (9) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc. (B) Mode of measurement: (1) Measurement shall be made for the finished volume of concrete only and will be restricted to the dimensions shown in the approved drawing. (2) Reinforcement steel shall be measured & paid separately. | 187.77 | cum | 7,000 ₹13,14,390 Lowest |
| 7.00 | Reinforced cement concrete (M-35) with minimum cement content of 422 kg per cum of concrete in abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. complete as per drawing and technical specifications as per clause 1500, 1700 & 2200 of MoRT&H specification (MoRT&H no. 13.5 (h)) Height 5 to 10 met. | 411.44 | cum | 7,500 ₹30,85,837.5 Lowest |
| 8.00 | Furnishing and placing reinforced cement concrete (M-40) with minimum content of 430 kg per cum of concrete for bearing pedestal as per drawing and technical specification as per clause 1500, 1600, 2100 of MoRT&H specification (MoRT&H no. 14.1 (E)) (A) The scope of work in the item includes (1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, rection & removal of staging, scaffolding and form liner etc, for piers, pier caps, bearing pedestals and other works as stated in other parts of the tender document. (2) The cost of casting of pier, pier caps, abutment, abutment caps etc. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge. (3) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter. (4) The cost of barricading and all safety requirements as mentioned elsewhere in the tender documents. (5) Installation of any fixtures into pier/pier cap etc (cost of fixtures in any, to be paid separately. (6) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge. (7) The cost of testing all materials involved in the execution of the item as per QAP. (8) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc.(B) Mode of measurement: (1) Measurement shall be made for the finished volume of concrete and will be restricted to the quantity as per approved drawings, Reinforcement steel shall be measured & paid separately. | 52.98 | cum | 8,000 ₹4,23,872 Lowest |
| 9.00 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II), Section-IX and clause 2005 of MORT&H specifications complete including all accessories as per drawing and Technical specifications (MoRT&H 13.14) elastomeric bearing | 17,25,000 | cm3 | 1 ₹17,25,000 Lowest |
| 10.00 | Steel Reinforcement: Supply, cutting, bending, with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe-500 as per relevant BIS specification and drawing. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars , labour, transportation, storing and all other incidental charges, tools & plants etc complete. As per clause No. 1600 & 2200 of MORT&H specification 2013 /Latest edition for road and bridges work (MORT&H 1600 & 2200). (MORT&H | 135.37 | M.T | 75,000 ₹1,01,52,525 Lowest |
Tender Value
₹15.0 Cr
EMD Value
₹30.1 L
Closing Date
17 May 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Rahul Singh
DGM-III, HSRDC Sonepat
Construction of 2-Lane ROB in lieu of LC No. 20-C at Railway K.M. 32/12-14 on DLI-UMB section near Narela Railway Station.
2021_HBC_167669_2
DGM-III/HSRDC/SNP/ROB
Open Tender
Civil Works
Works
548 days
Sonepat
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
Yes
₹30.1 L
Yes
Sonepat
16 Jun 2021
28 Apr 2021
18 May 2021
28 Apr 2021
17 May 2021
28 Apr 2021
7 May 2021
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | FOUNDATION - PILES & PILE CAPS: - Bored cast-in situ M-35 grade with minimum cement content 419 kg per cum of concrete in R.C.C pile 1000 mm dia excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000m as per clause 1100, 1600 & 1700 in MoRT&H specification (MoRT&H 12.24) (i) 1000mm dia piles (A) The scope of work in the above items include: (1) The cost of all initial layout of piles and setting out, initial excavation, if any. (2 a) The cost of boring through all types of soils/existing road/ pavement, removal of all obstruction like boulders, old foundation concrete or rock to be paid in relevant item above by chiseling or any other method as approved by the Engineer-in-charge. If a bore is abandoned for any reason no payment shall be made for such incomplete boring and shifting of the equipments. (2 b) The cost of filling up of the empty bore, if required. (3) The cost of preparation, circulation and handling of bentonite slurry. (4) The cost of disposal of all spoil, bentonite waste to keep the work area neat. (5) The cost of providing temporary liner and its withdrawal, if required below adjoining ground level (irrespective of the R.L of the adjoining ground level) for vertical piles). (6) The cost of providing and mixing all ingredients of cement concrete (except reinforcement steel) including admixtures, with batching plant, transporation, placement of concrete by tremie pipe for the required lengths of pile including providing cover blocks, stiffeners, handling bars etc. for safe handling of reinforcement cage. (7) The cost of breaking of pile head not earlier than 3 days after concreting and to remove spoil concrete to bring the pile head to the socketing level including cleaning and arranging the extended reinforcement bars as per drawings. (8) The cost of working for all leads, lifts, pumping / bailing out of water, labour, material and equipment etc. (9) The cost of mobilizing to site, installation at different locations transferring / dismantling, shifting, reinstalling and removal from site of the piling rigs and / or other equipments and all accessories including working plateforms. (10) The cost of identification, protection and maintenance of existing services, if any, which in the opinion of Engineer-in-charge are likely to be affected by piling operation incl. temporary shifting of such services to facilitate piling job shall also have to be done, if so required by the Engineer-in-charge and the cost for the same as assessed by the engineer-in-charge shall be reimbursable. (11) The cost of barricading and all traffic safety requirements as specified in the tender document. (12) The cost of all incidentals, labour, material, equipment and works required to execute the job. The item also includes any other incidental expenditures for completing the job as per the direction of the engineer-in-charge. (13) The item includes the cost of testing of all the materials involved in the execution of the item as per QAP. (B) Mode of measurement: (14) Initial vertical load testing, horizontal load testing, routine load testing required as per IS : 2911 part (iv) and as per MoRT&H specification. (1) Length of pile shall be measured from cut off level to the tip of the pile correct to a cm in case where the pile is terminated. The rock level shall be determined as per criteria mentioned elsewhere in the tender document for payment of boring through rock. (2) Reinforcement steel shall be measured & paid separately. | 1,940 | Mtr. | 1 | ₹1,940 |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (MoRT&H no. 12.1 (B)) | 1,186.8 | cum | 1 | ₹1,186.8 |
| 3 | Providing and laying of PCC M-15 with minimum cement content of 275 kg per cum of concrete for leveling course 150 mm thick below the pile cap as per clause 1100 and 1700 of MoRT&H specification (MoRT&H 12.39) | 71.72 | cum | 1 | ₹71.72 |
| 4 | Cement concrete for reinforced concrete (M-35) with minimum cement content of 422 kg per cum of concrete in pile cap complete as per drawing and technical specifications as per clause 1100, 1500 & 1700 of MoRT&H specification. (MoRT&H 12.38) (D) (A) The scope of work in the items include: (1) The cost of all initial layout and setting out work including identification of existing services, if any. (2) The cost of all pumping/bailing out of water, including its labour, material and equipments. (3) The cost of providing centering and shuttering including its erection, dismantling and removal of formwork including all leads and lifts with all required tools and plants to the required line and level. (4) The cost of providing and mixing all ingredients (except reinforcement steel) including admixtures etc. with batching plant, transportation, placement, finishing and curing of concrete. (5) The cost of maintenance and protection of existing services, if any which in the opinion of Engineer-in-charge are likely to be affected by any related activities including temporary shifting of such services to facilitate construction of pile cap work shall also have to be done, if so required by the Engineer-in-charge, and the cost for the same as assessed by the Engineer-in-charge shall be reimbursable. (6) The cost of installation of any fixture into the pile cap (cost of fixture to be paid separately) (7) The cost of barricading and all safety requirements as specified elsewhere in the tender document. (8) The cost of testing of all the materials, involved in the execution of items as per QAP. (9) The cost of all incidental labour, materials, equipment and works required to execute the job as per directions of engineer-in-charge. (B) Mode of measurement: (1) Measurements shall be made for the finished volume of reinforced cement concrete restricted to volume as per approved drawing (excluding cost of reinforcement steel only). Quantity of concrete of piles, which has gone into the pile caps shall be deducted. Reinforcement shall be measured & paid separately | 744.98 | cum | 1 | ₹744.98 |
| 5 | Steel Reinforcement: Supply, cutting, bending, with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe-500 as per relevant BIS specification and drawing. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars , labour, transportation, storing and all other incidental charges, tools & plants etc complete. As per clause No. 1600 of MORT&H specification 2013 /Latest edition for road and bridges work (MORT&H 1600). (MORT&H 12.40). | 213.37 | M.T | 1 | ₹213.37 |
| 6 | SUBSTRUCTURE- Piers, Abutments and Bearings: - Reinforced cement concrete (M-35) with minimum cement content of 422 kg per cum of concrete in abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. complete as per drawing and technical specifications as per clause 1500, 1700 & 2200 of MoRT&H specification (MoRT&H no. 13.5 (h)) Height upto 5 met. (A) The scope of work in the item includes (1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, rection & removal of staging, scaffolding and form liner etc, for piers, pier caps, bearing pedestals and other works as stated in other parts of the tender document. (2) The cost of casting of a mock pier at casting yard true to line, level and shape s per the direction of the Engineer-in-charge. (3) The cost of casting of pier, pier caps, abutment, abutment caps etc. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge. (4) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter. (5) The cost of barricading and all safety requirements as mentioned elsewhere in the tender documents. (6) Installation of any fixtures into pier/pier cap etc (cost of fixtures in any, to be paid separately. (7) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge. (8) The cost of testing all materials involved in the execution of the item as per QAP. (9) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc. (B) Mode of measurement: (1) Measurement shall be made for the finished volume of concrete only and will be restricted to the dimensions shown in the approved drawing. (2) Reinforcement steel shall be measured & paid separately. | 187.77 | cum | 1 | ₹187.77 |
| 7 | Reinforced cement concrete (M-35) with minimum cement content of 422 kg per cum of concrete in abutment, return wall/wing wall, retaining wall, pier shafts, bracket, pier cap, dirt wall etc. complete as per drawing and technical specifications as per clause 1500, 1700 & 2200 of MoRT&H specification (MoRT&H no. 13.5 (h)) Height 5 to 10 met. | 411.45 | cum | 1 | ₹411.45 |
| 8 | Furnishing and placing reinforced cement concrete (M-40) with minimum content of 430 kg per cum of concrete for bearing pedestal as per drawing and technical specification as per clause 1500, 1600, 2100 of MoRT&H specification (MoRT&H no. 14.1 (E)) (A) The scope of work in the item includes (1) The cost of all incidental work required including providing, placement and removal, shifting of shuttering, cleaning, oiling & maintenance, rection & removal of staging, scaffolding and form liner etc, for piers, pier caps, bearing pedestals and other works as stated in other parts of the tender document. (2) The cost of casting of pier, pier caps, abutment, abutment caps etc. including providing and mixing all ingredients and admixtures etc. in batching plant, transportation, placement, compacting, finishing and curing, placing in position inserts with pier/pedestals as per specification and the direction of the Engineer-in-charge. (3) The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter. (4) The cost of barricading and all safety requirements as mentioned elsewhere in the tender documents. (5) Installation of any fixtures into pier/pier cap etc (cost of fixtures in any, to be paid separately. (6) The cost of all incidentals, labour, material, equipment and works required for the executions of the job as per the direction of Engineer-in-charge. (7) The cost of testing all materials involved in the execution of the item as per QAP. (8) The cost of working for all leads, lifts, pumping / bailing out water, labour, material and equipment etc.(B) Mode of measurement: (1) Measurement shall be made for the finished volume of concrete and will be restricted to the quantity as per approved drawings, Reinforcement steel shall be measured & paid separately. | 52.98 | cum | 1 | ₹52.98 |
| 9 | Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II), Section-IX and clause 2005 of MORT&H specifications complete including all accessories as per drawing and Technical specifications (MoRT&H 13.14) elastomeric bearing | 17,25,000 | cm3 | 1 | ₹17,25,000 |
| 10 | Steel Reinforcement: Supply, cutting, bending, with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe-500 as per relevant BIS specification and drawing. The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars , labour, transportation, storing and all other incidental charges, tools & plants etc complete. As per clause No. 1600 & 2200 of MORT&H specification 2013 /Latest edition for road and bridges work (MORT&H 1600 & 2200). (MORT&H | 135.37 | M.T | 1 | ₹135.37 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_226199.xls
BOQ • 0.32 MB
tendernotice.pdf
Additional Documents • 0.04 MB
DNIT.pdf
Additional Documents • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .