Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹17.2 L+₹2.2 L (15.0%)Rejected-Finance | L2 | Rejected-Finance Higher amount quoted |
Tender Value
₹14.9 L
EMD Value
₹37,373
Closing Date
29 Feb 2024, 5:30 pmClosed
Executive Engineer
Executive Engineer PWD NH Division Kozhikode
DEPOSIT Improvements to Kalpetta Town drainage cum footpath and strengthening shoulder between Km 73 345 to 73 470 RHS on NH 766 Improvements to Kalpetta Town drainage cum foot path and strengthening shoulder between Km 73 300 to 73 600 RHS on
2024_PWD_663479_1
PWD/NH/TR/10537/2023_5_1_1/1
Open Tender
Civil Works - Highways
Item Rate
270 days
Kalpetta NH766
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹37,373
Yes
15 Mar 2024
24 Feb 2024
2 Mar 2024
24 Feb 2024
29 Feb 2024
24 Feb 2024
Amount
Construction of drainage and foot path
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.5.B:Plain/Reinforced Cement Concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M20 - Height upto 5m
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>
13.5.E.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 - Using concrete Mixer - Height upto 5m
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.23:Supplying and laying interlocking tile 80mm or nearest size thickness, minimum strength M30 including providing a layer of 6mm aggregate for 5cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc. complete.
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
3.8.B:Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Manual Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
3.1:Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.
OD188132/2023-2024:Lifting and removing of RCC slab of drain carefully stacking at convenient place including all labour charges etc complete
OD188133/2023-2024:Replacing of slab its original position to line and levels as directed by deptl officers at site
P P ABDUL KABEER
Bidder Name
SHABEER K.K.
P P ABDUL KABEER
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1029047.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .