Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.7 LAccepted-AOC | 1 | Accepted-AOC L1 BIDDER | |
| 2 | Rejected-Technical | - | Rejected-Technical L3 BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical L2 BIDDER |
| Sl No | Description | Qty | Unit | ARUN B L3 | MAS CONSTRUCTIONS L1 | FARIS U R L2 |
|---|---|---|---|---|---|---|
| 1.00Desilting& pola | ||||||
| 1.00 | OD410002/2025-2026:Earth work in surface excavation (in or under water) by mechanical means(hydraulic excavator)/manual means 0.9 cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5m and lead upto 1000m,trimming of bottom and side slopes in accordance with requirements of lines,grades and cross sections as per Technical specification Clause 302.3.6 | 4,290 | cum | 298.24 ₹12,79,449.6 | 238.65 ₹10,23,808.5 Lowest | 253 ₹10,85,370 |
| 1.00 | OD410003/2025-2026:Removing pola payal from the thodu and deposting on bank with initial lead and lift including disposal of pola payal away from site. | 2,000 | sqm | 31.33 ₹62,660 | 25.07 ₹50,140 Lowest | 26.61 ₹53,220 |
| 1.00 | OD410001/2025-2026:Engaging mancoolies | 35 | each | 1,043.94 ₹36,537.9 | 835.37 ₹29,237.95 Lowest | 886 ₹31,010 |
| 1.00 | 2.3.A.1:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. A. Lead upto 100 m (i) Girth above 300 mm to 600 mm | 20 | each | 671.09 ₹13,421.8 | 537.02 ₹10,740.4 Lowest | 569 ₹11,380 |
| 2.00AMC | ||||||
| 2.00 | OD410000/2025-2026:Earth work in surface excavation (in or under water) by mechanical means(hydraulic excavator)/manual means 0.9 cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5m and lead upto 1000m,trimming of bottom and side slopes in accordance with requirements of lines,grades and cross sections as per Technical specification Clause 302.3.6 | 214.5 | cum | 298.24 ₹63,972.48 | 238.65 ₹51,190.43 Lowest | 253 ₹54,268.5 |
| 2.00 | OD409999/2025-2026:Removing pola payal from the thodu and deposting on bank with initial lead and lift including disposal of pola payal away from site. | 200 | sqm | 31.33 ₹6,266 | 25.07 ₹5,014 Lowest | 26.61 ₹5,322 |
Tender Value
₹15.8 L
EMD Value
₹39,479
Closing Date
30 Jan 2026, 5:00 pmClosed
Sri.David John D Morris
SE KOCHIN CORPORATION
Kareethodu Desilting in Div 39, 40, 45 (old 46,47,48)
2026_LSGD_830390_1
KRE1- 6574182/25-26
Open Tender
Civil Works - Others
Item Rate
180 days
ERNAKULAM
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹39,479
Yes
19 Mar 2026
24 Jan 2026
31 Jan 2026
24 Jan 2026
30 Jan 2026
24 Jan 2026
Desilting& pola
OD410002/2025-2026:Earth work in surface excavation (in or under water) by mechanical means(hydraulic excavator)/manual means 0.9 cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5m and lead upto 1000m,trimming of bottom and side slopes in accordance with requirements of lines,grades and cross sections as per Technical specification Clause 302.3.6
OD410003/2025-2026:Removing pola payal from the thodu and deposting on bank with initial lead and lift including disposal of pola payal away from site.
OD410001/2025-2026:Engaging mancoolies
2.3.A.1:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. A. Lead upto 100 m (i) Girth above 300 mm to 600 mm
OD410000/2025-2026:Earth work in surface excavation (in or under water) by mechanical means(hydraulic excavator)/manual means 0.9 cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5m and lead upto 1000m,trimming of bottom and side slopes in accordance with requirements of lines,grades and cross sections as per Technical specification Clause 302.3.6
OD409999/2025-2026:Removing pola payal from the thodu and deposting on bank with initial lead and lift including disposal of pola payal away from site.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1394932.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1394932.xls
BOQ • 0.30 MB
S.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .