Loading…
Loading…
Tender Value
₹26.2 L
EMD Value
₹52,500
Closing Date
4 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ELEC TRD
12 conditions · 1 needing a document upload
The tendering firm must have valid Electrical Contractor's License issued by the Government in their own name. A copy of the license shall be uploaded along with the tender offer, failing which the offer shall be summarily rejected. The license must be valid as on the date of opening of the tender.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
5 conditions · 1 needing a document upload
In addition to Annexurc-V, in case of other than Company/Proprietary firm, Annexure -V(A) shall also be submitted by the each member of a Partnership Firm / Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc, as the case may be. Non submission of above certificate(s) by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested/digitally signed by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document.
Uploading of document as per Clause 14 ( Part I) of GENERAL CONDITION is essential
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Godhra - OHE modification in connection with regirdering by new composit girder of ROB : 3A ( KM 470/40 to 471/02).
EL-TRD-TENDER-25-26-37-2~WR
EL-TRD-TENDER-25-26-37-2
Open
Works - General
18 Months
Vadodara, Gujarat
₹0
₹52,500
3 Aug 2026
3 Aug 2026
21 Aug 2026
75 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 26,23,599.8 | ||
| — | 5.00 | — | — | ||
| Supply of fabricated / rolled GI steel structures & SPS : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 6,69,835 | |
| — | 5.00 | — | — | ||
| Erection of fabricated / rolled GI steel structures & SPS : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 69,540 | |
| — | 55.00 | — | — | ||
| Digging, casting, grouting of concrete foundation including supply of material. : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 4,05,735 | |
| — | 12.00 | — | — | ||
| Supply of conventional cantilever assembly including 25kv LCP insulator : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 3,14,568 | |
| — | 12.00 | — | — | ||
| Erection of conventional cantilever assembly including 25kv LCP insulator : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 41,520 | |
| — | 1.00 | — | — | ||
| Supply of conventional type regulating equipment : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 51,507 | |
| — | 1.00 | — | — | ||
| Erection of conventional type regulating equipment : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 15,809 | |
| — | 1.00 | — | — | ||
| Supply of material for Fixed Termination Anchor with insulator : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 12,227 | |
| — | 1.00 | — | — | ||
| Erection of material for Fixed Termination Anchor with insulator : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 2,299 | |
| — | 2.00 | — | — | ||
| Supply of Guy Rod assembly complete : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 22,124 | |
| — | 2.00 | — | — | ||
| Erection of Guy Rod assembly complete : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 4,636 | |
| — | 7.00 | — | — | ||
| Supply of cut-in/9 Tonne Insulator : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 35,588 | |
| — | 7.00 | — | — | ||
| Erection of cut-in/9 Tonne Insulator : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 7,287 | |
| — | 8.00 | — | — | ||
| Supply of suspension insulator including suspension clamp, single clevis double strap etc. : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 1,30,768 | |
| — | 8.00 | — | — | ||
| Erection of suspension insulator including suspension clamp, single clevis double strap etc. : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 15,600 | |
| — | 4.00 | — | — | ||
| Supply of jumper and its fittings : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 35,984 | |
| — | 4.00 | — | — | ||
| Erection of jumper and its fittings : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 7,784 | |
| — | 7.00 | — | — | ||
| Supply of new droppers complete with clips etc for the new span for modification and shifting of OHE to new structure/cantilever : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 33,635 | |
| — | 7.00 | — | — | ||
| Modification and shifting of OHE to new/another structure/cantilever, removal of old droppers, catenary and contact wire etc. if any, erection of contact and catenary wire and S & E of new droppers complete with clips etc. for the new span. : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 28,980 | |
| — | 7.00 | — | — | ||
| Transfer of OHE from one mast/support to another with adjustment of droppers if any. : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 36,827 | |
| — | 4.00 | — | — | ||
| Splicing and extension of anchored OHE : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 31,576 | |
| — | 4.00 | — | — | ||
| Survey, design and preparation of OHE layout plan and SED : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 53,432 | |
| — | 2.00 | — | — | ||
| Breaking of RCC foundation : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 9,234 | |
| — | 6.00 | — | — | ||
| Transportation of released material : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 17,844 | |
| — | 8.00 | — | — | ||
| Dismantling of cantilever assembly Complete : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 12,432 | |
| — | 1.00 | — | — | ||
| Dismantling of Regulating equipment Complete : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 8,786 | |
| — | 2.00 | — | — | ||
| Dismantling of Guy rod and termination : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 2,190 | |
| — | 8.00 | — | — | ||
| Dismantling of mast by cutting : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 32,152 | |
| — | 4.00 | — | — | ||
| Supply of fittings for provision of false catenary ( Catenary ending cone , double strap, contact ending clamp) : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 5,944 | |
| — | 4.00 | — | — | ||
| Erection of fittings for provision of false catenary : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 1,188 | |
| — | 300.00 | — | — | ||
| Supply of 150sq mm copper conductor for feeder wire : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 4,21,200 | |
| — | 300.00 | — | — | ||
| Erection of 150sq mm copper conductor for feeder wire : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 13,500 | |
| — | 0.40 | — | — | ||
| Supply of material for Buried Earth Conductor (BEC) with necessary accessories fittings and fasteners on OHE masts/portals : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 16,268.8 | |
| — | 0.40 | — | — | ||
| Erection of material for Buried Earth Conductor (BEC) with necessary accessories fittings and fasteners on OHE masts/portals : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 13,945.2 | |
| — | 0.40 | — | — | ||
| Supply of material for Areial Earth Conductor (AEC) with necessary accessories fittings and fasteners on OHE masts/portals : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 27,893.6 | |
| — | 0.40 | — | — | ||
| Erection of material for Areial Earth Conductor (AEC) with necessary accessories fittings and fasteners on OHE masts/portals : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 6,437.2 | |
| — | 4.00 | — | — | ||
| Provision of jumpering arrangement (160 sq.mm copper jumper wire) with PG clamp and related fittings for false catenary : Details of work with schedule and explainatory note is attached as ANNEXURE B | — | — | — | 7,324 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ANNEXUREBFINAL.pdf
ATTACHMENT
GENERALCONDITIONFINAL.pdf
ATTACHMENT
PRICEANDPAYMENTFINAL.pdf
ATTACHMENT
SPECIALCONDITIONOFCONTRACT.pdf SPECIAL CONDITION OF CONTRACT
ATTACHMENT
ANNEXUREII.pdf
ATTACHMENT
SPECIALCONDITIONOFCONTRACT.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].