Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹7,357.76 (3.82%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.0 L+₹10,511.08 (5.45%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.3 L+₹40,117.31 (20.8%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.0 L+₹1.1 L (54.5%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
24 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Re-Construction/Upgradation of R/wall at L/o. Najmun Kounser W/o. Mohd Akram at Gujjarpati Malshahibagh.
2026_PWDJK_324869_9
NIT No.69-2026-27
Open Tender
Civil Works
Percentage
30 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Ganderbal
₹7,000
5 Oct 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
24 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) complete. | 33.82 | Cum | 7,564.8 | ₹2,55,841.54 |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 68.3 | Sqm | 628.95 | ₹42,957.29 |
| 3 | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) including cost of scaffoldings. | 34.15 | Sqm | 283.8 | ₹9,691.77 |
| 4 | Providing/Fixing of 75 dia PVC pipes (B-Type) for weep holes at required spacing as per directions of EIC. | 15 | RM | 200 | ₹3,000 |
| 5 | Supply & filling of Nallah Boulders duly hand packed for back filling behind R/Wall including ramming, compacting, all inclusive leads, lifts, loading, un-loading, cost and carriage of materials from approved nearest source to site of work complete. | 31.22 | Cum | 850 | ₹26,537 |
| 6 | Carriage of Material:- Stone agg. /Sand/Stones For an avg. lead of 10 Kms | 44.23 | Cum | 279.04 | ₹12,341.94 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1096275.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .