Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | Admitted-Finance |
| 3 | Admitted-Finance 403 4TH FLOOR PARK CENTRA NH 8 SECTOR 30 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | Admitted-Finance |
| 4 | Rejected-Technical 501 5TH FLOOR PLOT NO 67 PUJIT PLAZA PALM BEACH ROAD SECTOR 11 CBD BELAPUR NAVI MUMBAI 400614 MAHARASHTRA | NAVI MUMBAI | THANE | MAHARASHTRA | 400614 | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | Rejected-Technical Non Responsive |
Tender Value
Refer Docs
Closing Date
10 Sept 2020, 11:00 amClosed
DIRECTOR GENERAL BORDER ROADS
HQ DGBR SEEMA SADAK BHAWAN RING ROAD DELHI CANT NEW DELHI-110010
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF THE PROJECT DESIGN AND CONSTRUCTION/IMPROVEMENT OF RD R-T-S ON EPC MODE FROM EXISTING KM 3.90 TO KM 56.951 (DESIGN KM 3.90 TO KM 59.42) (DESIGN LENGTH-55.52) FROM EXISTING IW/CL-9 TO NHDL SPECIFICATIONS
2020_BRO_574103_1
CE (P)/SPK/AE/01/2020-21
Open Tender
Consultancy
EPC Contract
2520 days
BET KM 3.90 TO KM 56.951 ON R-T-S ROAD IN J AND K
REFER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹0
Exempted
EPC CELL HQ DGBR SEEMA SADAK BHAWAN
18 Jan 2021
29 Jul 2020
11 Sept 2020
29 Jul 2020
10 Sept 2020
28 Aug 2020
29 Jul 2020 - 20 Aug 2020
20 Aug 2020
Amount
Remuneration for Local Staff
Team Leader Cum Senior Highway Engineer (1 No)
Resident cum Highway Engineer (1 No)
Bridge/Structural Engineer (1 No)
Senior Pavement Specialist (1 No)
Senior Quality cum Material Expert (1 No)
Road safety Expert (1 No)
Senior Geologist cum Hill Slope Protection Specialist (1 No)
Sub-Professional Staff
Survey Engineer (1 Nos.)
Assistant Highway Engineer (2 Nos.)
CAD Expert (1 No)
Environmental Engineer (1 No.)
Assistant Bridge Engineer (1 Nos.)
Assistant Quality cum Material Engineer (2 Nos)
Quantity Surveyor (1 Nos)
Horticulture cum Landscaping Expert (1 Nos)
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Accountant Cum Cashier (1 No)
Steno cum Computer operator (2 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)
Bolero or equivalent 4x4 vehicle(not more than 3 years old) (1 nos during Construction Period and 1 nos during Maintenance Period.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 18 round trip to Employer's Head Office and 18 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of minimum area of 150 sqm shall be rented during Construction Period
One Office of minimum area 50 sqm shall be rented during Maintenace Period
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
During Construction Period
During Maintenance Period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Executive Table, Executive Chairs, Tables (for executive), Ordinary Chairs Type-I, Tables (for all other staff), Ordinary Chairs–Type II (for all other staff), Steel Almirah, Visitors chairs/Conference room chairs, Tables for computers with 3 drawers, keyboard/mouse pull out trays, Printer desks, Side tables, Conference Table, Revolving Chairs for Computer Room/Drawing room, Telephone with PABX facilities, Photocopier, FAX, Computer PC (state of the art), LaserJet Printers, Binding Machine, Water Coolers and Software, Plotter, Biometric device etc.
During Construction Period
During Maintenance Period
Reports and Document Printing
Monthly reports
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (55.520 kms x 8 times)
Pavement strength measurement using FWD (55.520 kms x 4 times)
Bridge inspection using Mobile Bridge Inspection Unit (55.520 kms x 8 times)
Road signs inspection using Retro Reflectometer (55.520 kms x 8 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
MSV INTERNATIONAL INC
AYOLEEZA CONSULTANTS PVT. LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .