Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 1₹23.3 LRejected-Finance VILLAGE KAMLAR PO KANGTA FELUG TEHSIL DADAHU DISTT SIRMOUR HP | SIRMAUR | HIMACHAL PRADESH | 173022 | 1 | Rejected-Finance Keshav Kumar L1 Through Draw of Lots | |
| 3 | 2₹23.3 L+₹0.01 (<0.01%)Rejected-Finance CHAUHAN BUILDING LOWER PANTHAGHATTI SHIMLA | 2 | Rejected-Finance L2 | |
| 4 | 3₹35.0 L+₹11.7 L (50.0%)Rejected-Finance | 3 | Rejected-Finance L3 | |
| 5 | 4₹35.0 L+₹11.7 L (50.0%)Rejected-Finance VILLAGE SERKHI P O PAB MANAL TEHSIL SHILLAI DISTRICT SIRMOUR H P | PAB MANAL | SIRMOUR | HIMACHAL PRADESH | 173027 | 4 | Rejected-Finance L4 |
Tender Value
₹33.3 L
EMD Value
₹57,500
Closing Date
2 Apr 2022, 10:00 amClosed
Executive Engineer
Executive Engineer HPPWD Division Nahan
ROFD Km 6/810 to 10/600
2022_PWD_58415_1
NAHAN 11021-40
Open Tender
Civil Works - Roads
Item Rate
90 days
Nahan
As per Bidding Documents
8 documents required · 8 mandatory
₹1,500
₹57,500
4 Aug 2022
23 Mar 2022
2 Apr 2022
23 Mar 2022
2 Apr 2022
23 Mar 2022
Amount
Excavation in earthwork in hilly area all heights and depths, in all kind of soils including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting / excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification of Ministry of Rural Development for Rural Roads August, 2004 (Two Thousand Four),C-1603.1, 1603.2 (Clause - One Thousand Six Hundred Three point One, One Thousand Six Hundred Three point Two) to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places. in specified manner, systematically with due consideration to avoiding adverse effects on environment, trimming, filling of unevenness, blind age and finishing of the road to specified dimensions to the entire satisfaction as directed by the Engineer-in charge for smooth plying of traffic. All useful material such as stones, shingle, aggregate and slates shall be sorted out and stacked along the road side not less than 2298.03 cubic metre in all cases, failing which recovery at the rate of Rupees 170/- only (Rupees one hundred seventy only) per cubic meter shall be effected. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases.including haulage of mateial with in all leads, lifts and carriage of materials and as directed by the Engineer in-charge.
HARI SINGH
Dalip Singh
shrvan kumar
yeshpal singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .