Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-Finance | ₹1.8 L | 1 | Accepted-Finance First Lowest |
| 2 | 2₹1.9 LAccepted-Finance | ₹1.9 L | 2 | Accepted-Finance Second Lowest |
Tender Value
₹1.7 L
EMD Value
₹4,219
Closing Date
18 Mar 2026, 3:30 pmClosed
AJAYAKUMAR V
Assistant Executive Engineer Office of the AEE, MI Subdivision, Shoranur
GENERAL-AM-2025-26-GENERAL -Annual maintenance 2025-2026 works to Kannannur LIS in Thrithala Panchayath - General Civil Work.-General Civil Work
2026_Irrig_846512_1
IRR/IA/TR/4438/2025_5_4_3/1
Open Tender
Civil Works - Lift Irrigation Schemes
270 days
Thrithala
Please refer tender documents.
7 documents required · 7 mandatory
₹555
₹4,219
16 Jun 2026
11 Mar 2026
21 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
main canal
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
OD25080/2025-2026:Engaging labour for clearing jungle ,cleaning pump house, and surroundings and canal etc including direction of departmental officers at site.
OD54266/2025-2026:Engaging labour for electrical and mechanical related works fo smooth pumping including all charges and direction of departmental officers at site
OD54270/2025-2026:Providing and fixing Name board of size 90x45 cm using 1.6mm thick MS sheet and 25x25x4 mm angle section and fixing in 220 cm (200 cm above GL and 40 cm below GL) overall height (25x25x4 mm angle sction ) post including fixing in 20x20x40 cm concrete below ground level.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1430125.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.97 MB
preliminaryagreement.pdf
Tender Documents • 0.11 MB
integritypact.pdf
Additional Documents • 0.05 MB
formoftender.pdf
Additional Documents • 0.18 MB
affidavitformandepayment.pdf
Additional Documents • 0.08 MB
BOQ_1430125.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid