Tender ID
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
16 Apr 2026, 6:55 pmClosed
Executive Engineer PMGSY Divison Ganderbal
Duderhama Ganderbal Opposite Qamariya Park
Permanent Restoration of road T01-Wussan to Ari Via Chattergull, Package No JK16-3010
2026_KSRRD_147166_6
NIT No. 01/EE/PMGSY/GBL/E-Tendering of 2026-27 Dated 01/04/2026
Open Tender
Civil Works - Roads
Percentage
Ganderbal
Please refer Tender documents.
8 documents required · 8 mandatory
₹600
Executive Engineer PMGSY Ganderbal
₹24,000
3 Apr 2026
3 Apr 2026
17 Apr 2026
3 Apr 2026
16 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering / Diversion of Nallah during execution of work if found necessary including diversion of traffic during execution and makings the things good after completion of job incl. hire charges of land if found necessary. | 1 | Job | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil : | 79.2 | cum | - | - |
| 3 | Providing and laying of boulder apron laid in wire crates with 4 mm dia Black Anealed wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including cost of carriage of all materials from approved source to site of work, all leads , lift, loading, unloading and octroi (Finished work to be measured). | - | cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | - | sqm | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages of material involved | - | cum | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | - | kg | - | - |
| 7 | Providing & fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing & staircase railing & similar work like culverts etc including applying a priming coat of approved steel primer. ( MS Tube (Medium) 40mm nominal bore, GI Pipes 40mm nominal bore & ERW Tubes 40mm nominal dia) | - | RM | - | - |
| 8 | Total Construction cost without GST | - | No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.77 MB
BOQ_229002.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .