| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance 171 GLOBEL SPACE HUDA GLOBEL SPACE COLONY 125055 | SIRSA | HARYANA | 125055 | -1.26% | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹10.3 L (2.54%)Admitted-Finance H NO 431 RAJENDRA NAGAR ASHOK TENT HOUSE INDRA NAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | +1.25% | ₹4.1 Cr+₹10.3 L (2.54%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 Cr+₹14.2 L (3.50%)Admitted-Finance 19 KRISHNAVANTI COLONY DANADAYALPURA BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | +2.20% | ₹4.2 Cr+₹14.2 L (3.50%) | L3 | Admitted-Finance |
Tender Value
₹4.1 Cr
EMD Value
₹8.2 L
Closing Date
15 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
In Ward-08 Model Town, construction of one side RCC drain from Gate No. 03 to Gurudwara, from Arya Mandir towards park and from Gate No. 02 Model Town Chowki to Hari Mandir, Leprosy Ashram Road via park.
2026_DOLBU_1152108_1
40/CE/CD/NNB/26-27 (1 To 20) Sr No 11 Tender List 66 Date-21.05.2026
Open Tender
Civil Works
Percentage
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Bareillye-tender.com
₹8.2 L
25 Jul 2026
25 May 2026
15 Jun 2026
25 May 2026
15 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floors.including base concrete and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(S.I.No.697) | 510 | CUM | 75 | ₹38,250 |
| 2 | Dismantling of old damage RCC or RB work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.694) | 153 | CUM | 1,404 | ₹2,14,812 |
| 3 | Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692) | 16.56 | CUM | 660 | ₹10,929.6 |
| 4 | Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.251) | 4,080 | CUM | 209 | ₹8,52,720 |
| 5 | Excavation in foundation in soil mixed with Morrum/ shingle/ kanker/ foul requiring the use of special T&P such as pickaxe, subbles etc. (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.252) | 714 | CUM | 240 | ₹1,71,360 |
| 6 | Cartage of Surplus earth upto 5km. | 4,991.88 | CUM | 183.5 | ₹9,16,009.98 |
| 7 | Providing and laying cement concrete in 1:4:8 (1 cement : 4 C sand : 8 stone ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. | 204 | CUM | 7,125 | ₹14,53,500 |
| 8 | R.C.C. work with cement,approved coarse sand and 4cm gauge stone ballast in proportions of 1:2:4 in raft and foundation excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G G.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour ,tools & plants etc required for proper completion of work. Binding wire cost being included in the item,(S.I.No.287) | 467.5 | CUM | 8,173 | ₹38,20,877.5 |
| 9 | R.C.C. work with cement,approved coarse sand and 4cm gauge stone ballast in proportions of 1:1.5:3 in wall and coloumn excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G G.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour ,tools & plants etc required for proper completion of work. Binding wire cost being included in the item,(S.I.No.289) | 1,147.5 | CUM | 8,976 | ₹1,02,99,960 |
| 10 | RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284 | 252.45 | CUM | 8,451 | ₹21,33,454.95 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 27.40 MB
BOQ_2158232.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .