Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC MAIGANGA TELIAMURA | TELIAMURA | KHOWAI | TRIPURA | ₹3.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.8 CrRejected-AOC | ₹3.8 Cr | L2 | Rejected-AOC L2 |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
18 May 2026, 3:00 pmClosed
The Executive Engineer, Planning Div, AMC
o/o the Executive Engineer, Planning Div, AMC
CONSTRUCTION OF RETAINING WALL AND VISION BARRIER AT OPPOSITE BANK OF DASHAMI GHAT, PHASE I
2026_SAMC_72732_1
34/CE/UDD/EW/DNIe-T/2026-27
Open Tender
Civil Works
Percentage
365 days
Agartala
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,000
₹7.8 L
29 Jul 2026
11 May 2026
18 May 2026
11 May 2026
18 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Sqm | 9.4 | - |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. -All kinds of soil | - | Sqm | 18.1 | - |
| 3 | Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material including cost of dewatering. ( By Mechannical means)
Note : The excacvated earth if found suitable can be used partly for backfilling in trenches and partly for road work. Hence cost of disposal has not been added except for marshy soil. (for depth upto 3m) | 1 | Cum | 66.4 | ₹66.33 |
| 4 | Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material . ( By Mechannical means) i)Cost of dewatering | 1 | Cum | 3.32 | ₹3.32 |
| 5 | Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material. ( By Mechannical means) ii)The cost of shoring & shuttering | 1 | Cum | 1.99 | ₹1.99 |
| 6 | Backfilling behind abutment, wing wall & return wall complete as per drawings, clause 710.1.4 of IRC: 78 & MoRT&H technical specification Clause 2200. ( ii-sandy material) | 1 | Cum | 1,592.1 | ₹1,590.51 |
| 7 | Sandfilling in foundation trenches as per drawings and MoRT&H technical specification clause 304. | - | Cum | 1,168 | - |
| 8 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | Cum | 338.6 | - |
| 9 | Providing & laying filter media with jhama brick aggregates as per spcification to a thickness of not less than 600 mm with smaller size towards the soil & bigger size towards the wall & providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition as per drawing and MoRT&H technical specification clause 2504.2 | - | Cum | 4,444.9 | - |
| 10 | Weep Hole:- Providing weep holes in brick masonry/ stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or uPVC pipe (110 mm of 6.0 kg/cm2 pressure) extending through the full width of the structures with slope of 1(V): 20 (H) towards drawing face complete as per drawing and MoRT&H technical specification clauses 2706,2200. | 1 | Mtr | 392.7 | ₹392.31 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74012.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
DNIe-TDashamighat.pdf
Tender Documents • 4.16 MB
BOQ_74012.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].