| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹94.1 L+₹16,408.09 (0.17%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 3 | L3₹96.3 L+₹2.4 L (2.57%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹96.7 L+₹2.8 L (3.00%)Rejected-Finance KOTTA HOUSE POWALKOTTA KASRAGOD P O MULIYAR KASRAGOD | KASARGOD | KASARGOD | KERALA | L4 | Rejected-Finance L4 | |
| 5 | L5₹1.0 Cr+₹7.7 L (8.15%)Rejected-Finance KASARAGOD | KASARAGOD | KASARAGOD | KERALA | 671315 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | MANZOOR KUNHAMOO L6 | SHAMSHEER B.M L1 | UBAISE M.B L9 | gafoor c m L7 | P AHAMMED SHERIEF L3 | CM ABDULLAKUNHI L2 | P.MOHAMMED HANIEF L5 | JAFAR SADIK M L4 | K MOHAMMED KUNHI L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00vcb | ||||||||||||
| 1.00 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 8.5 | metre | 1,335.58 ₹11,352.43 | 1,231.87 ₹10,470.9 Lowest | 1,381.43 ₹11,742.16 | 1,346.75 ₹11,447.38 | 1,263.55 ₹10,740.18 | 1,234.04 ₹10,489.34 | 1,332.24 ₹11,324.04 | 1,268.88 ₹10,785.48 | 1,410.8 ₹11,991.8 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 490 | hour | 344.07 ₹1,68,594.3 | 317.35 ₹1,55,501.5 Lowest | 355.88 ₹1,74,381.2 | 346.95 ₹1,70,005.5 | 325.51 ₹1,59,499.9 | 317.91 ₹1,55,775.9 | 343.21 ₹1,68,172.9 | 326.89 ₹1,60,176.1 | 454.77 ₹2,22,837.3 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 555.96 | cum | 194.13 ₹1,07,927.54 | 179.06 ₹99,549.3 Lowest | 200.8 ₹1,11,635.76 | 195.75 ₹1,08,828.19 | 183.66 ₹1,02,106.7 | 179.37 ₹99,721.65 | 193.65 ₹1,07,660.69 | 184.44 ₹1,02,540.34 | 202.12 ₹1,12,369.62 |
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 139.6 | cum | 390.23 ₹54,475.33 | 359.93 ₹50,245.51 Lowest | 403.63 ₹56,345.94 | 393.5 ₹54,931.81 | 369.19 ₹51,538.19 | 360.56 ₹50,333.45 | 389.26 ₹54,339.92 | 370.74 ₹51,754.56 | 404.24 ₹56,431.1 |
| 1.00 | 2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited) | 69.13 | cum | 1,119.08 ₹77,364.24 | 1,032.18 ₹71,356.67 Lowest | 1,157.5 ₹80,020.29 | 1,128.44 ₹78,011.31 | 1,058.72 ₹73,191.43 | 1,033.99 ₹71,481.8 | 1,116.28 ₹77,170.67 | 1,063.19 ₹73,500.45 | 1,212.72 ₹83,837.76 |
| 1.01 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 328.05 | cum | 7,355.1 ₹24,12,833.2 | 6,783.96 ₹22,25,471.29 Lowest | 7,607.62 ₹24,95,672.13 | 7,416.62 ₹24,33,014.77 | 6,958.42 ₹22,82,702.72 | 6,795.89 ₹22,29,384.92 | 7,336.74 ₹24,06,810.22 | 6,987.81 ₹22,92,344.08 | 7,781.62 ₹25,52,752.66 |
| 1.01 | 4.2.2:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources | 302.28 | cum | 9,254.47 ₹27,97,478.21 | 8,535.84 ₹25,80,247.86 Lowest | 9,572.2 ₹28,93,522.9 | 9,331.88 ₹28,20,878.01 | 8,755.36 ₹26,46,605.24 | 8,550.86 ₹25,84,788.16 | 9,231.37 ₹27,90,495.45 | 8,792.33 ₹26,57,780.68 | 9,802.82 ₹29,63,235.64 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.66 | cum | 7,903.64 ₹1,94,895.86 | 7,289.9 ₹1,79,761.64 Lowest | 8,174.99 ₹2,01,587.08 | 7,969.75 ₹1,96,526.07 | 7,477.38 ₹1,84,384.71 | 7,302.73 ₹1,80,078.02 | 7,883.91 ₹1,94,409.34 | 7,508.95 ₹1,85,163.2 | 8,367.77 ₹2,06,340.84 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.66 | cum | 9,624.26 ₹1,69,916.31 | 8,876.91 ₹1,56,721.85 Lowest | 9,954.68 ₹1,75,749.88 | 9,704.77 ₹1,71,337.71 | 9,105.2 ₹1,60,752.31 | 8,892.53 ₹1,56,997.62 | 9,600.23 ₹1,69,492.06 | 9,143.65 ₹1,61,431.14 | 11,015.54 ₹1,94,479.36 |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
25 Sept 2025, 6:00 pmClosed
Executive Engineer MI Division Kasaragod
Executive Engineer MI Division Kasaragod
KDP-2023- 24-Construction of VCB cum tractor way across swarga thodu in kollamajulu in Enmakage Gramapanchayath-General Civil Work
2025_Irrig_794853_1
IRR/IA/TR/6314/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
545 days
Kollamajulu in Enmakaje Grama Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
4 Nov 2025
9 Sept 2025
27 Sept 2025
9 Sept 2025
25 Sept 2025
9 Sept 2025
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1313971.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .