Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance DHARIARKANDI TILABAZAR UNOKOTI TRIPURA PIN 799281 | UNAKOTI | TRIPURA | 799281 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance VILL KALIPUR PS KAILASHAHAR UNAKOTI TRIPURA | KAILASHAHAR | UNAKOTI | TRIPURA | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance VILL DURGAPUR P O PAITUR BAZAR P S KAILASHAHAR UNAKOTI DISTRICT | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹21.6 L
EMD Value
₹43,102
Closing Date
4 May 2026, 3:00 pmClosed
Executive Engineer PWD R and B Kailashahar
O/O the Executive Engineer PWD R and B Kailashahar
Mtc. of different types of quarter at Durgapur W.R quarter complex SH. Repairs of plasters, repairs of W.C, repairs of doors and window,M.S. grill, flooring, colouring, painting etc complete during the year 2025 26.
2026_CEPWD_72162_1
71/EE/KLSD/ 2025-26
Open Tender
Civil Works
Percentage
180 days
Kailashahar
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹43,102
19 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground with all leads and lifts including finishing even and smooth and curing complete as per direction of the Engineer in charge:-
With cement mortar 1:4 ( 1 cement : 4 fine sand ) | - | sqm | - | - |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed:
-All kinds of soil | - | sqm | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | - | cum | - | - |
| 4 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone aggregate 40 mm nominal size) | 1 | cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level:
1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 40 mm nominal size) | 1 | cum | - | - |
| 7 | First class brick work in foundation and plinth including cost of all materials as required complete:-
In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | cum | - | - |
| 8 | Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-
In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | sqm | - | - |
| 9 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-
In cement mortar 1:6 ( 1 cement : 6 fine sand ). | - | cum | - | - |
| 10 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-
In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | sqm | - | - |
stage.html
html • 0.04 MB
finance_73440.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.45 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.49 MB
DNIT71.pdf
Tender Documents • 3.79 MB
BOQ_73440.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .