Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.0 L
Closing Date
14 Aug 2026, 4:00 pm
Executive Officer
Office Nagar Palika Parishad Lakhimpur
Construction work of record room in Municipal Council, Lakhimpur Kheri
2026_DOLBU_1170087_3
571/JANNIRMAN/MBL/2026-27 DATED 15.07.2026
Open Tender
Civil Works
Percentage
90 days
LAKHIMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,286
Nagar Palika Parishad
₹6.0 L
17 Jul 2026
17 Jul 2026
14 Aug 2026
17 Jul 2026
14 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling of Old Brick Drain etc.DSR (15.7.4) | 3.15 | Cum | 1,514 | ₹4,769.1 |
| 2 | Dismentling of Rcc slab etc all complete.DSR (15.3) | 1.3 | Cum | 1,331 | ₹1,730.3 |
| 3 | Earth work in excavation Earth work in excavation by machanical means (hydraulic excavator)/manual means in foundation trenches or drains(not exceeding 1.5mtr.in width or 10 sqm on plan) excavated soil and disposal of surplus excavated soil as directedearth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by th within a lead of 50m including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the all kind of soil..DSR(2.8.1) | 57.41 | cum | 191 | ₹10,965.31 |
| 4 | Providing and Laying, in cement concrete 1:4:8 (1cement : 4Finesand : 8 stone ballast 40mm./ Nominal size) and curring complete, including cost of form work in foundation and floos.DSR (4.1.8) | 4.78 | cum | 5,006 | ₹23,928.68 |
| 5 | M-150 class brick work in foundation in 1:4 etc all complete.DSR (6.1.1) | 16.43 | cum | 5,417 | ₹89,001.31 |
| 6 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. RAFT DSR (5.1.2) | 2.35 | cum | 6,448 | ₹15,152.8 |
| 7 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. column DSR(5.2.2) | 17.4 | cum | 7,976 | ₹1,38,782.4 |
| 8 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. Beam DSR(5.1.2) | 6.26 | cum | 6,448 | ₹40,364.48 |
| 9 | M-150 class brick work in super structure in 1:4 etc all complete.PWD SCH (2/6.4.1) | 85.72 | cum | 6,835 | ₹5,85,896.2 |
| 10 | R.C.C. in (1:1.5:3) with cement, C/sand and 20mm gauge stone gritt i/c all comp. at site. Beam DSR(6.3.1) | 15.51 | cum | 8,456 | ₹1,31,152.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
TECDOCT.pdf
Tender Documents • 0.38 MB
BOQ_2195556.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].