Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC MANATHOOR HOUSE KUMBADAJE KASARAGOD | KASARAGOD | KERALA | ₹3.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 Cr+₹12.2 L (4.08%)Accepted-AOC | ₹3.1 Cr+₹12.2 L (4.08%) | L2 | Accepted-AOC L2 |
| 3 | L3₹3.2 Cr+₹19.1 L (6.39%)Rejected-Finance | ₹3.2 Cr+₹19.1 L (6.39%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.7 Cr+₹1.8 Cr (58.6%)Rejected-Finance KANNUR | KERALA | 670001 | ₹4.7 Cr+₹1.8 Cr (58.6%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | SUBIN ANTONY L1 | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L4 | MOHAMMED RAFI K M L2 | ABDUL KHADER B A L3 |
|---|---|---|---|---|---|---|---|
| 1.00Appendix A- APRON,EARTH WORK and Finishing Jobs | |||||||
| 1.00 | 60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 154 | hour | 395.4 ₹60,891.6 Lowest | 1,225 ₹1,88,650 | 411.51 ₹63,372.54 | 420.67 ₹64,783.18 |
| 1.00 | 60.2.5:BAILING OUT WATER USING PUMP ABOVE 20HP AND UP TO 30HP -Bailing out water with engine and pump set above 25HP and up to 30HP, including conveyance to site and errection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 140 | hour | 878.65 ₹1,23,011 Lowest | 2,450 ₹3,43,000 | 914.47 ₹1,28,025.8 | 934.82 ₹1,30,874.8 |
| 1.00 | 60.2.6:BAILING OUT WATER USING PUMP ABOVE 30HP AND UP TO 40HP - Bailing out water with engine and pump set above 30HP and up to 40HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 192 | hour | 1,016.82 ₹1,95,229.44 Lowest | 3,675 ₹7,05,600 | 1,058.28 ₹2,03,189.76 | 1,081.82 ₹2,07,709.44 |
| 1.00 | 60.2.4:BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP - Bailing out water with engine and pump set above 10HP and up to 20HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 244 | hour | 488.76 ₹1,19,257.44 Lowest | 1,838 ₹4,48,472 | 508.68 ₹1,24,117.92 | 520 ₹1,26,880 |
| 1.00 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 136 | metre | 1,353.75 ₹1,84,110 Lowest | 9,800 ₹13,32,800 | 1,408.94 ₹1,91,615.84 | 1,440.29 ₹1,95,879.44 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2,827.42 | cum | 196.77 ₹5,56,352.02 Lowest | 368 ₹10,40,491.66 | 204.79 ₹5,79,027.96 | 209.35 ₹5,91,921.01 |
| 1.01 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 408.26 | cum | 395.54 ₹1,61,482.37 Lowest | 1,838 ₹7,50,378.2 | 411.67 ₹1,68,067.57 | 420.83 ₹1,71,807.21 |
| 1.01 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 647.33 | cum | 7,455.19 ₹48,25,968.14 Lowest | 10,903 ₹70,57,838.99 | 7,759.12 ₹50,22,711.15 | 7,931.76 ₹51,34,466.2 |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 212.62 | cum | 6,388.75 ₹13,58,407.97 Lowest | 9,800 ₹20,83,725 | 6,649.21 ₹14,13,788.28 | 6,797.15 ₹14,45,244.02 |
Tender Value
₹3.7 Cr
EMD Value
₹1 L
Closing Date
4 Oct 2025, 6:00 pmClosed
Executive Engineer MI Division Kasaragod
Executive Engineer MI Division Kasaragod
KDP-PADI IMRANVALAPPU VCB cum BRIDGE-RECONSTRUCTION OF VCB CUM BRIDGE ACROSS MADHUVAHINI RIVER AT PADI IMRANVALAPPU KOTTALAKKAL IN CHENGALA GP, KASARAGOD CONSTITUENCY OF KASARAGOD DISTRICT-General Civil Work
2025_Irrig_801713_1
IRR/IA/TR/598/2024_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
545 days
padi imranvalappu
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
₹1 L
Yes
4 Nov 2025
24 Sept 2025
6 Oct 2025
24 Sept 2025
4 Oct 2025
24 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1331601.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .