| 1 | L-1₹3.8 CrAccepted-Finance | ₹3.8 Cr | L-1 | Accepted-Finance PRICE QUOTED LOW |
| 2 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 3 | Rejected-Technical CANAL ROAD HERBERTPUR TEH VIKASNAGER DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 4 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
Tender Value
₹3.8 Cr
EMD Value
₹7.7 L
Closing Date
21 Sept 2020, 5:00 pmClosed
SE IRRIGATION WORKS CIRCLE DEHRADUN
OFFICE OF SUPERINTENDING ENGINEER IRRIGATION WORKS CIRCLE DEHRADUN
Reconstruction and Lining of Gules in Vikasnagar Block Distt. Dehradun Under NABARD Part-I (Gules of Katapathar, Prithavipur, Telpura, T-Cut, Lakhanwala, Jamankhata and Langha Pasoli canals) (C.M. Announcement No. 310/2019)
2020_IRDCE_25948_1
05/SE/2020-21
Open Tender
Civil Works
Item Rate
365 days
KATAPATHAR, PRITHAVIPUR, TELPURA, T-CUT, LAKHANWAL
AS PER STANDARD BIDDING DOCUMENT
3 documents required · 3 mandatory
₹5,900
EXECUTIVE ENGINEER IRRIGATION DIVISION VIKASNAGAR
₹7.7 L
IRRIGATION WORKS CIRCLE DEHRADUN
3 Oct 2020
4 Sept 2020
25 Sept 2020
4 Sept 2020
21 Sept 2020
10 Sept 2020
7 Sept 2020
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m. depth.
Brick masonry in 1:4 cement mortar complete excluding pointing and plastering as per drawing and technical specification Clauses 600,1202 &1203 including cost of all material, labour, T&P required for proper completion of work as per direction of Engineer-in-Charge.
Providing plain cement concrete in substructure as per drawing & technical specification Clauses 802, 804,805, 806, 807, 1202 and 1204 nominal mix 1:2:4 For Grouting & top copping.including cost of all material, labour, T&P required for proper completion of work as per direction of Engineer-in-Charge.
Plastering with cement mortar (1:4) 15 mm thick on stone work / brick masonry as per technical clauses 613.4 & 1204 including cost of all material, labour, T&P required for proper completion of work as per direction of Engineer-in-Charge.
Random Rubble stone masonry in 1:5 cement and sand mortar in substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 including supply of all materials labour T&P required for proper completion of work as per direction of Engineer-in-Charge.
Cement Pointing in 1:3 Mix as per drawing & technical specification Clauses 613.4& 1204 including cost of all material, labour, T&P required for proper completion of work as per direction of Engineer-in-Charge.
R.C.C. Grade M-25 nominal mix 1:1.5:3 in slab covering including cost of centering & shuttering, cost of all material, labour, T&P required for proper completion of work as per direction of Engineer-in-Charge.
Supplying, fitting and placing TMT bar reinforcement complete as per drawings and technical specification Clauses 1000 and 1202 including cost of all material, labour, T&P required for proper completion of work as per direction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .