Additional Chief Engineer, RHWC, Samal
Office of the Additional Chief Engineer, Rengali Head Works Circle, Samal, Angul, Pin-759037
Protection to Right bank near village Jakeikela Patra sahi of Brahmani river, Bonai Block of district Sundargarh.
2026_CEBBS_138704_1
ACE-RHWC-RID- 06/2026-27
Open Tender
Civil Works - Others
Percentage
330 days
Jakeikela, Bonai, Sundaragada
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹4.0 L
Yes
14 Aug 2026
14 Aug 2026
1 Sept 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
14 Aug 2026 - 20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance 50 mtr outside the periphery of the area & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm on pre measurement and removal of stumps of trees cut earlier disposal of unserviceable materials to be used or auctioned up to a lead of 1000 mtr including removal and disposal of top organic soil not exceeding 150 mm thickness with all leads, lifts and delifts with cost of all labour, hiring and running charges of all machineries, cess,T&P, etc. complete as per direction of Engineer-in-Charge. | 12,292.74 | Sqm | 8.6 | ₹1,05,717.56 |
| 2 | Fine dressing of earth work in ordinary or hard soil in river bank slope dressing according to the direction of the department including cutting or filling earth upto 0.15m depth of surface in all leads, lifts& delifts including all cost,carriage, labour ,T&P etc and as per specification approved, as per direction of Engineer-in-charge. | 11,250 | Sqm | 5.5 | ₹61,875 |
| 3 | Earthwork excavation with loading, unloading and carriage by mechanical means in all kinds of soil including stony earth, gravel and moorum etc. inter spread with boulders up to ½ cum. size with all lifts and delifts including trimming the slopes and bed to design section and depositing the excavated materials away from work site within all leads, lifts & delifts from the place of excavation etc. complete as per the specification and direction by the Engineer-in-charge. | - | Cum | 65.6 | - |
| 4 | Supplying and spreading sand of aproved specification on compacted surface of earh dam or dykes to proper slope and level within all leads, lifts& delifts including all cost,royality,EMF,DMF ,additional charge,carriage, labour ,T&P etc and workers welfare cess etc. complete and as per the direction of the Engineer-in-charge. | 1,549.35 | Cum | 765.9 | ₹11,86,647.16 |
| 5 | Supplying and spreading granite chips of size 6.7mm down graded in filter in rock toe riprap and filter drains in earth dam or dyke to proper slope and level within all leads, lifts& delifts including all cost,royality,EMF,DM ,additional charge,carriage, labour ,T&P and workers welfare cess etc. complete and as per the direction of the Engineer-in-charge. | 1 | Cum | 2,961.9 | ₹2,958.94 |
| 6 | Supplying and spreading granite chips of size 20mm down graded in filter in rock toe riprap and filter drains in earth dam or dyke to proper slope and level within all leads, lifts& delifts including all cost,royality,EMF,DMF ,additional charge,carriage, labour ,T&P and workers welfare cess etc. complete and as per the direction of the Engineer-in-charge. | 1 | Cum | 3,459.8 | ₹3,456.34 |
| 7 | Quarrying, Collecting, supplying & stacking of hard granite stone boulder of size 30 cm and above in length in any direction and 0.028 cum in volume from approved quarry free from weather skin surface and other deleterious materials including dumping the stones in rip-raps, spur, and slope protection works including surface packing in all heights and depths including filling the interstices with small stones, wedging and packing surface to proper line levels including dumping in water within all leads, lifts& delift setc complete including cost, carriage, & royality,EMF,DMF ,additional charge of all materials including all labour, T&P etc complete and labour cess, taxes as applicable including all cost of incidental charges as per drawing, specification, direction of Engineer-in-charge. ( Measurement to be taken in level section & 20% voids will be deducted from the finished level section.) | 6,615.84 | Cum | 2,287.2 | ₹1,51,31,749.25 |
| 8 | Quarrying, Collecting, supplying & stacking of hard granite stone boulder of at least 30 cm and above in length in any direction from approved quarry free from wether skin surface and other deleterious materials and packing the stones in rip-raps, spur, and slope protection works in river embankments to required profile in all heights and depths including filling the interstices with small stones wedging and hammering and packing surface to proper line and levels including fixing wave breakers within all leads, lifts& delifts etc complete with all cost of incidental charges including cost, carriage & royality,EMF,DMF ,additional charge of all materials, including all labour, T&P etc complete and labour cess taxes as applicable as per drawing, specification, direction of Engineer-in-charge. | 5,101.2 | Cum | 2,691.1 | ₹1,37,27,839.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
JakeikelaBid_final.pdf
Tender Documents • 1.36 MB
BOQ_605999.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].