Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹8,469
Closing Date
8 Sept 2026, 6:00 pm
Assistant Executive Enginee
Office of the Assistant Executive Engineer minor Irrigation Sub division SulthanBathery
GENERAL-AM 2025-26-Cheriyamala LI Scheme in Pulpally Panchayath-General Civil Work
2026_Irrig_832421_4
IRR/IA/TR/3827/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
Cheriyamala
Please refer Tender documents.
8 documents required · 8 mandatory
₹750
Yes
₹8,469
Yes
8 Sept 2026
10 Aug 2026
10 Sept 2026
10 Aug 2026
8 Sept 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building Maintenance | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 50.6.1.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete. | - | cum | - | - |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.006 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.007 | 5.4:Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources) | - | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.009 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kilogram | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 2.71 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.05 MB
Tendernotice_5.pdf
PDF • 0.08 MB
Tendernotice_6.pdf
PDF • 0.04 MB
Tendernotice_7.pdf
PDF • 0.03 MB
epaymentform.pdf
Other Document • 0.01 MB
BOQ_1463728.xls
BOQ • 0.26 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 2.70 MB
affidavit.pdf
Other Document • 0.03 MB
formoftender.pdf
Other Document • 0.02 MB
integritypact.pdf
Other Document • 0.10 MB
preliminaryagreement.pdf
Other Document • 0.15 MB
corrigendum.pdf
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].