| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance | -17.21% | ₹8.1 L | L1 | Admitted-Finance |
| 2 | L2₹8.3 L+₹20,485.06 (2.54%)Admitted-Finance | -15.11% | ₹8.3 L+₹20,485.06 (2.54%) | L2 | Admitted-Finance |
| 3 | L3₹8.6 L+₹50,920.01 (6.31%)Admitted-Finance | -11.99% | ₹8.6 L+₹50,920.01 (6.31%) | L3 | Admitted-Finance |
| 4 | L4₹8.6 L+₹53,066.06 (6.57%)Admitted-Finance | -11.77% | ₹8.6 L+₹53,066.06 (6.57%) | L4 | Admitted-Finance |
| 5 | L5₹9.0 L+₹89,939.17 (11.1%)Admitted-Finance | -7.99% | ₹9.0 L+₹89,939.17 (11.1%) | L5 | Admitted-Finance |
Tender Value
₹9.8 L
EMD Value
₹19,600
Closing Date
12 Aug 2026, 6:00 pmClosed
EE PWD DIV. BUNDI
EE PWD DIV. BUNDI
SR to CD work in Lohli (km 0/0 to 3/250).
2026_CEPWD_581538_3
EE PWD DIV. BUNDI NITNO-06/2026-27
Open Tender
Civil Works
Percentage
90 days
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DIV. BUNDI
₹19,600
Yes
16 Aug 2026
3 Aug 2026
13 Aug 2026
3 Aug 2026
12 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | - | Cum | - | - |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 For All Rajasthan except Bikaner, Hanumangarh and Sri Ganganagar Nominal mix 1:3:6 | 1 | Cum | - | - |
| 3 | Plain/reinforced cement concrete in substructure complete as per drawings and MoRTH specification Clauses 1700 and 2200 For height upto 5 m R.C.C grade M 20 | 1 | Cum | - | - |
| 4 | Providing and laying Precast reinforced cement concrete Box culvert section of M-40 grade designed for 'AA' class loading as per IRC specifications including to effect of impact, EQ etc. complete on firm base of 200mm thick lean concrete of M-10 grade with aggregate of size 40mm nominal of following internal size the work includes required safety measures cost of design of RCC Precast Box and its proof checking from IIT / NIT / Government Engineer College complete in all respect as per specifications Size 2.00 M x 2.00 M | - | RM | - | - |
| 5 | Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and MoRTH specifications Clauses 1700 and 2702.2 | 1 | Cum | - | - |
| 6 | Supplying, fitting, and placing HYSD bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 | - | Cum | - | - |
| 7 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202.By Mechanical Means | - | Cum | - | - |
| 8 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a fully automatic computerised batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | - | Cum | - | - |
| 9 | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in fully automatic Computerised Batching Plant compatiable with Printer and Pen Drive and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 with all required equipments (Dowel Bars & Tie Bar will be paid seprately). | - | Cum | - | - |
| 10 | Add GST (18%) on Total Costruction Cost | - | Total | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 1.40 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_1033284.xls
BOQ • 0.24 MB
DATE-CORRIGENDUM02.pdf
PDF • 0.51 MB
DATE-CORRIGENDUM.pdf
PDF • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .