| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | L1 | Accepted-AOC R1- Lowest bidder | |
| 2 | L2₹6.7 L+₹13,956.59 (2.13%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹6.7 L+₹14,038 (2.14%)Rejected-AOC ASSALIPARAMBIL PAMPADY KOTTAYAM | KOTTAYAM | KERALA | 686001 | L3 | Rejected-AOC Rejected |
Tender Value
₹6.7 L
EMD Value
₹16,800
Closing Date
17 Oct 2019, 6:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, KIP (RB) Sub Division No.26, Karunagappally
Rectification work of Canal
2019_Irrig_305414_1
39/AEE/KIP/KPY/2019-20
Open Tender
Civil Works - Canal
Item Rate
120 days
Palamel
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
Yes
online
₹16,800
Yes
18 Feb 2020
3 Oct 2019
21 Oct 2019
3 Oct 2019
17 Oct 2019
3 Oct 2019
Amount
Scheme 1: rectification work between ch.3306 m m and 3350 m
od40006/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
od40007/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od40008/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 2: rectification work between ch. 3350 m and 3400 m
od40006/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
od40007/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od40008/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 3: rectification work between ch.3400 m and 3450 m
od40006/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
od40007/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od40008/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 4: rectification work between ch.3450 m and 3490 m
od40006/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
od40007/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od40008/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
Scheme 5 : rectification work between ch.3490 m and 3645 m
od40006/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
od40016/2019_2020/P2 : Dry rubble packing using hard granite blasted rubble including cost and conveyance of all materials and all labour charges etc. complete.)
od40007/2019_2020/P2 : Cement concrete 1:4:7 using 20mm metal to lines and levels including proper compacting curing , watering etc. complete with all leads and lift etc. complete as per specification or as directed by Engineer in chaege
od40008/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement: 3 fine sand) including all cost of materials, labour charges etc complete (Average of 1:3, 6 mm thick and 1:3, 12mm thick)
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
SHAJAHAN E
Bidder Name
SHAJAHAN E
M R PUSHPAKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_418938.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .