| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹1.0 Cr (70.0%)Admitted-Finance S 524 NEELKANTH HOUSE 302 3RD FLOOR SCHOOL BLOCK SHAKARPUR DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | ₹2.5 Cr+₹1.0 Cr (70.0%) | L2 | Admitted-Finance |
| 3 | L3₹3.8 Cr+₹2.4 Cr (160.6%)Admitted-Finance 401 APOLLO ARCADE R C TECHNICAL INSTITUTE ROAD GHATLODIYA AHMEDABAD GUJARAT 380061 | AHMADABAD | GUJARAT | 380061 | ₹3.8 Cr+₹2.4 Cr (160.6%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical EMD not submitted |
| 5 | Rejected-Technical A 412 413 SWASTIK DISA BUSINESS PARK VIA VADHANI INDUSTRIAL ESTATE LBS MARG GHATKOPAR MUMBAI MAHARASHTRA 400086 UDYAM MH 18 0055502 | MUMBAI SUBURBAN | MAHARASHTRA | 400086 | - | - | Rejected-Technical BEC not qualified |
| Sl No | Description | Qty | Unit | SANMARG Projects Pvt. Ltd. L2 | SARK EPC Projects Pvt.Ltd. L3 | VECTRAS L1 |
|---|---|---|---|---|---|---|
| 1.00SITC of big size TLP with new foundation | ||||||
| 1.10 | Supply, Installation, Testing and Commissioning of New bigger size CP test station with new foundation & terminal board including Liasioning with the land owner, transportation, excavation, concreting, diagram plate etc. complete in all respect as per SOW, SCC, drawings and directions of EIC/SIC. | 14 | EA | 29,456 ₹4,86,613.12 | 28,500 ₹4,70,820 Lowest | - |
| 2.00SITC of big size TLP on existing foundation | ||||||
| 2.10 | Supply, Installation, Testing and Commissioning of New bigger size CP test station on available foundation with terminal board by replacing the existing TLP box including Liasioning with the land owner, cutting from the existing post and welding the new TLP box at site complete the job in all respects including minor foundation repair, materials for cutting, welding, arrangement of portable generator, tools and tackles etc. as per SOW, SCC, drawings and directions of EIC/SIC. | 1 | EA | 25,379 ₹29,947.22 | 12,000 ₹14,160 Lowest | - |
| 3.00SITC of AC Mitigator with backfill | ||||||
| 3.10 | Supply, Installation, Testing and Commissioning of Copper anode AWG No. 1/0 (AC MITIGATOR) continuous copper cable of required length including cable termination, end sealing, including Liasioning with the land owner, transportation, excavation, laying, spreading of backfill material all around 100mm, watering, back filling of trench and restoration, labour, consumables, tools and tackles as per specifications and as per SOW, SCC, drawings and directions of EIC/SIC. | 553 | M | 2,981 ₹19,45,221.74 Lowest | 3,200 ₹20,88,128 | - |
| 4.00SITC of Solid-State Polarisation Cell | ||||||
| 4.10 | Supply, Installation, Testing and Commissioning of Solid State Polarisation Cell (SSPC) in test station, termination of cable ends, testing and commissioning of SSPC including required terminal lugs, clamps and hardwares as per the specifications and as per SOW, SCC, drawings and directions of EIC/SIC. | 15 | EA | 79,849 ₹14,13,327.3 Lowest | 2,00,000 ₹35,40,000 | - |
| 5.00Construction of underground concrete box for SSPC | ||||||
| 5.10 | Construction of underground concrete box 300X300X300 mm nearby TLP for housing SSPC. This should be executed on requirement basis as per SOW, SCC, drawings and directions of EIC/SIC. | 5 | EA | 1,941 ₹11,451.9 Lowest | 15,000 ₹88,500 | - |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
21 Apr 2025, 2:00 pmClosed
SIDDHARTH KUMAR
GAIL BHAWAN SECTOR-6 VIDHYDHAR NAGAR JAIPUR
AC OR DC INTERFERENCE MITIGATION JOB ALONG JLPL PIPELINE UNDER JAMNAGAR, SAMAKHIALI AND KANDLA
2025_GAIL_231368_1
GAIL/CNP/JPR24VS273/2024-25
Open Tender
Electrical Works
Lump-sum
240 days
SAMAKHIALI AND KANDLA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4.7 L
THROUGH MS TEAMS
28 Jul 2025
26 Mar 2025
22 Apr 2025
27 Mar 2025
21 Apr 2025
27 Mar 2025
4 Apr 2025
Amount
SITC of big size TLP with new foundation
Supply, Installation, Testing and Commissioning of New bigger size CP test station with new foundation & terminal board including Liasioning with the land owner, transportation, excavation, concreting, diagram plate etc. complete in all respect as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of big size TLP on existing foundation
Supply, Installation, Testing and Commissioning of New bigger size CP test station on available foundation with terminal board by replacing the existing TLP box including Liasioning with the land owner, cutting from the existing post and welding the new TLP box at site complete the job in all respects including minor foundation repair, materials for cutting, welding, arrangement of portable generator, tools and tackles etc. as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of AC Mitigator with backfill
Supply, Installation, Testing and Commissioning of Copper anode AWG No. 1/0 (AC MITIGATOR) continuous copper cable of required length including cable termination, end sealing, including Liasioning with the land owner, transportation, excavation, laying, spreading of backfill material all around 100mm, watering, back filling of trench and restoration, labour, consumables, tools and tackles as per specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of Solid-State Polarisation Cell
Supply, Installation, Testing and Commissioning of Solid State Polarisation Cell (SSPC) in test station, termination of cable ends, testing and commissioning of SSPC including required terminal lugs, clamps and hardwares as per the specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
Construction of underground concrete box for SSPC
Construction of underground concrete box 300X300X300 mm nearby TLP for housing SSPC. This should be executed on requirement basis as per SOW, SCC, drawings and directions of EIC/SIC.
Making pipe to cable connection
Pin brazing on pipeline for making pipe to cable connection on pipeline up to the size of 25 Sqmm copper cable as per the approved procedure including Liasioning with the land owner, required size of pin, excavation, cleaning of surface, Pin brazing, sealing of connection point and backfilling as per scope of work as per specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of 1 cm2 corrosion coupon
Supply, installation of polarization coupon having coating holiday of 1cm2 size at test station including Magnetic Reed Switch, Magnet and associated consumables etc.as per SOW, SCC, drawings and directions of EIC/SIC.
Supply, laying 1core x 6mm2 CU armoured CP cable
Supply and laying of 1C x 6 SQMM copper armoured CP cable as per tender specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
Supply, laying 1core x 25mm2 CU armoured CP cable
Supply and laying of 1C x 25 SQMM copper armoured CP cable as per tender specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
Description of Work / Item(s)
Amount
SITC of big size TLP with new foundation
Supply, Installation, Testing and Commissioning of New bigger size CP test station with new foundation & terminal board including Liasioning with the land owner, transportation, excavation, concreting, diagram plate etc. complete in all respect as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of big size TLP on existing foundation
Supply, Installation, Testing and Commissioning of New bigger size CP test station on available foundation with terminal board by replacing the existing TLP box including Liasioning with the land owner, cutting from the existing post and welding the new TLP box at site complete the job in all respects including minor foundation repair, materials for cutting, welding, arrangement of portable generator, tools and tackles etc. as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of AC Mitigator with backfill
Supply, Installation, Testing and Commissioning of Copper anode AWG No. 1/0 (AC MITIGATOR) continuous copper cable of required length including cable termination, end sealing, including Liasioning with the land owner, transportation, excavation, laying, spreading of backfill material all around 100mm, watering, back filling of trench and restoration, labour, consumables, tools and tackles as per specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of Solid-State Polarisation Cell
Supply, Installation, Testing and Commissioning of Solid State Polarisation Cell (SSPC) in test station, termination of cable ends, testing and commissioning of SSPC including required terminal lugs, clamps and hardwares as per the specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
Construction of underground concrete box for SSPC
Construction of underground concrete box 300X300X300 mm nearby TLP for housing SSPC. This should be executed on requirement basis as per SOW, SCC, drawings and directions of EIC/SIC.
Making pipe to cable connection
Pin brazing on pipeline for making pipe to cable connection on pipeline up to the size of 25 Sqmm copper cable as per the approved procedure including Liasioning with the land owner, required size of pin, excavation, cleaning of surface, Pin brazing, sealing of connection point and backfilling as per scope of work as per specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of 1 cm2 corrosion coupon
Supply, installation of polarization coupon having coating holiday of 1cm2 size at test station including Magnetic Reed Switch, Magnet and associated consumables etc.as per SOW, SCC, drawings and directions of EIC/SIC.
Supply, laying 1core x 6mm2 CU armoured CP cable
Supply and laying of 1C x 6 SQMM copper armoured CP cable as per tender specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
Supply, laying 1core x 25mm2 CU armoured CP cable
Supply and laying of 1C x 25 SQMM copper armoured CP cable as per tender specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
Description of Work / Item(s)
Amount
SITC of big size TLP with new foundation
Supply, Installation, Testing and Commissioning of New bigger size CP test station with new foundation & terminal board including Liasioning with the land owner, transportation, excavation, concreting, diagram plate etc. complete in all respect as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of big size TLP on existing foundation
Supply, Installation, Testing and Commissioning of New bigger size CP test station on available foundation with terminal board by replacing the existing TLP box including Liasioning with the land owner, cutting from the existing post and welding the new TLP box at site complete the job in all respects including minor foundation repair, materials for cutting, welding, arrangement of portable generator, tools and tackles etc. as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of AC Mitigator with backfill
Supply, Installation, Testing and Commissioning of Copper anode AWG No. 1/0 (AC MITIGATOR) continuous copper cable of required length including cable termination, end sealing, including Liasioning with the land owner, transportation, excavation, laying, spreading of backfill material all around 100mm, watering, back filling of trench and restoration, labour, consumables, tools and tackles as per specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of Solid-State Polarisation Cell
Supply, Installation, Testing and Commissioning of Solid State Polarisation Cell (SSPC) in test station, termination of cable ends, testing and commissioning of SSPC including required terminal lugs, clamps and hardwares as per the specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
Construction of underground concrete box for SSPC
Construction of underground concrete box 300X300X300 mm nearby TLP for housing SSPC. This should be executed on requirement basis as per SOW, SCC, drawings and directions of EIC/SIC.
Making pipe to cable connection
Pin brazing on pipeline for making pipe to cable connection on pipeline up to the size of 25 Sqmm copper cable as per the approved procedure including Liasioning with the land owner, required size of pin, excavation, cleaning of surface, Pin brazing, sealing of connection point and backfilling as per scope of work as per specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
SITC of 1 cm2 corrosion coupon
Supply, installation of polarization coupon having coating holiday of 1cm2 size at test station including Magnetic Reed Switch, Magnet and associated consumables etc.as per SOW, SCC, drawings and directions of EIC/SIC.
Supply, laying 1core x 6mm2 CU armoured CP cable
Supply and laying of 1C x 6 SQMM copper armoured CP cable as per tender specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
Supply, laying 1core x 25mm2 CU armoured CP cable
Supply and laying of 1C x 25 SQMM copper armoured CP cable as per tender specifications and as per SOW, SCC, drawings and directions of EIC/SIC.
SARK EPC Projects Pvt.Ltd. (BID ID -843070)
VECTRAS (BID ID -841951)
SARK EPC Projects Pvt.Ltd. (BID ID -843070)
VECTRAS (BID ID -841951)
SANMARG Projects Pvt. Ltd. (BID ID -843076)
SARK EPC Projects Pvt.Ltd. (BID ID -843070)
SARK EPC Projects Pvt.Ltd. (BID ID -843070)
VECTRAS (BID ID -841951)
SARK EPC Projects Pvt.Ltd. (BID ID -843070)
VECTRAS (BID ID -841951)
SANMARG Projects Pvt. Ltd. (BID ID -843076)
SARK EPC Projects Pvt.Ltd. (BID ID -843070)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .