Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.0 LAdmitted-Finance SHRI SAI ENGINEERING WORKS MAMTA RANI GHAZIPUR GHAZIPUR UTTAR PRADESH 233001 | GHAZIPUR | UTTAR PRADESH | 233001 | L1 | Admitted-Finance | |
| 2 | L2₹47.4 L+₹36,808 (0.78%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | NATIONAL ENTERPRISES L2 | SHRI SAI ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00De-Centralized | |||||
| 2.00 | F Bracket With Clamp For STP | 75 | Nos. | 19,875 ₹19,875 Lowest | 26,250 ₹26,250 |
| 3.00 | Holding Clamp with Nuts & Bolts | 275 | Nos. | 81,675 ₹81,675 Lowest | 96,250 ₹96,250 |
| 4.00 | Piercing Connector | 85 | Nos. | 21,250 ₹21,250 | 20,825 ₹20,825 Lowest |
| 5.00 | Suspension Clamp with I Hook | 45 | Nos. | 20,250 ₹20,250 Lowest | 20,475 ₹20,475 |
| 6.00 | Distribution Box Clamp | 45 | Nos. | 4,500 ₹4,500 | 3,375 ₹3,375 Lowest |
| 7.00 | Dead End Clamp with I Hook | 30 | Nos. | 15,300 ₹15,300 Lowest | 15,300 ₹15,300 Lowest |
| 8.00 | Al Lugs 70/150/240/400sqmm | 65 | Nos. | 10,855 ₹10,855 | 7,475 ₹7,475 Lowest |
| 9.00 | Nuts & Bolts of Different Sizes | 65 | KG | 12,740 ₹12,740 Lowest | 14,300 ₹14,300 |
| 10.00 | TOP/TEE-OFF Clamp | 125 | Nos. | 33,125 ₹33,125 Lowest | 36,250 ₹36,250 |
Tender Value
Refer Docs
EMD Value
₹47,000
Closing Date
21 May 2026, 12:00 pmClosed
SE EDC Ghazipur
Lal Darwaja Ghazipur
Advance Deposit work under EDD-Ghazipur Nagar, Ghazipur
2026_PVVNV_1146159_1
10/EDC(G)/2026-27
Open Tender
Electrical Works
Lump-sum
SE EDC Ghazipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC Ghazipur
₹47,000
SE EDC Ghazipur
23 May 2026
7 May 2026
21 May 2026
7 May 2026
21 May 2026
7 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De-Centralized | - | - | - | - |
| 2 | F Bracket With Clamp For STP | 75 | Nos. | - | - |
| 3 | Holding Clamp with Nuts & Bolts | 275 | Nos. | - | - |
| 4 | Piercing Connector | 85 | Nos. | - | - |
| 5 | Suspension Clamp with I Hook | 45 | Nos. | - | - |
| 6 | Distribution Box Clamp | 45 | Nos. | - | - |
| 7 | Dead End Clamp with I Hook | 30 | Nos. | - | - |
| 8 | Al Lugs 70/150/240/400sqmm | 65 | Nos. | - | - |
| 9 | Nuts & Bolts of Different Sizes | 65 | KG | - | - |
| 10 | TOP/TEE-OFF Clamp | 125 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Specification.docx
Tender Documents • 0.17 MB
BOQ_2143268.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .