Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5,035Accepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹59,290+₹54,255 (1077.6%)Accepted-Finance | L2 | Accepted-Finance Accept | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹70,000
EMD Value
₹1,400
Closing Date
15 Dec 2023, 4:00 pmClosed
Executive Engineer Irrigation and FC Div Nowshera
Executive Engineer Irrigation and FC Div Nowshera
Temporary Restoration/ Clearance of slip/Construction of Muthu Bund/Head work restoration of Thumba Nehoti Gravity canal from RD 0-500Mtrs.
2023_IFC_239415_1
Fresh E-NIT No. 23 of 2023-24
Open Tender
Civil Works - Canal
Item Rate
Nowshera
As per NIT
4 documents required · 4 mandatory
₹500
Yes
Executive Engineer Irrigation and FC Div Nowshera
₹1,400
Yes
16 Dec 2023
7 Dec 2023
16 Dec 2023
7 Dec 2023
15 Dec 2023
7 Dec 2023
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) : Wet
Shingle clearance from canals
From canals (including extraction of roots)
SLIP CLEARANCE In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.
In soils; mixed with moorum / Kankar / shingle / boulders ; disposal lead upto 50 m and lift upto 1.5 m.
sohan kumar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .