Loading…
Loading…
Tender Value
₹17.0 L
EMD Value
₹34,000
Closing Date
29 May 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (WMS)
PLANNING
13 conditions · 2 needing a document upload
NA
NA
12 conditions · 3 needing a document upload
Tenderer/Bidder is required to submit all the documents in support of their firm constitution/composition/form type as detailed at Para-29 & Para- 30 of Chapter-3 of tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer shall have Environmental laboratory recognized from Central pollution control board, Ministry of Environment, Forest & Climate Change / Govt. of India for testing of Environmental parameters as mentioned in scope of work (Chapter-6). The name of Tenderer must be seen in The Gazette of Indian (Central pollution control board notification) or recognised list of labs (EP Act) at website of Central pollution control board, Ministry of Environment, Forest & Climate Change /Govt. of India
The Bidder shall be required to deposit Bid Security of requisite value along with the Bid for the due performance with the stipulation to keep the offer open till such date as specified in the Bid, under the conditions of Bid. Tenderer(s)/Bidders are allowed to make payments against this tender towards Bid Security only through payment modes available on IREPS portal or as specified at Para-11 of Chapter-3 of Tender document.
The Bid Security shall be deposited either through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- IXA (Form of Bank Guarantee Bond for Bid Security) of this tender document and shall be valid for a period of 90 days beyond the bid validity period.
Bids not accompanied with full Bid security, in the requisite manner, shall under no circumstances be entertained and will summarily be rejected at the time of opening itself without further reference to the bidders.
Full value of the Bid Security submitted by me/us shall be forfeited without prejudice to any other right or remedies in case my/our Tender is accepted and if: (a)I/We do not submit the Performance Guarantee within the time specified in the Tender document; (b)I/We do not execute the contract documents within seven days after receipt of notice issued by the Railway that such documents are ready.
Monitoring on all environmental issues relating to operation of Rail Wheel Plant/ Bela as per CPCB guidelines and co-ordination with related organizations.
RWP-Safety-Env-2026
RWP-Safety-Env-2026
Open
Works - General
24 Months
Saran, Bihar
₹0
₹34,000
29 May 2026
6 May 2026
15 May 2026
15 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 17,00,144 | ||
| — | 832.00 | — | — | ||
| Monitoring of Ambient Air Quality from 04 different locations for 832 measurements for parameters as per National Ambient Air Quality Standards (vide Central Pollution Control Authority Notification No. B-29016/20/90/PCI-L dt: 18th Nov.'2009) for all 12 parameters as per requirement of Air prevention & control of pollution Act. 1981 & Environment clearance Compliance. The list of parameter are as below: 01. PM2.5, 02. PM10, 03. SO2, 04. NO2, 05. So2, 06. NH3, 07. O3, 08. Pb, 09. CO, 10. C6C6, 11. Bap, 12. Arsenic, 13. Nickel. Note:-Quoted rates shall be inclusive of all taxes excluding GST. | — | — | — | 10,81,600 | |
| — | 96.00 | — | — | ||
| Monitoring of fugitive emission at shop floor from 04 locations as per G.S.R (E) dated 30th May 2008. Note:- Quoted rates shall be inclusive of all taxes excluding GST. | — | — | — | 76,800 | |
| — | 144.00 | — | — | ||
| Monitoring of Stack on monthly basis for Flue Gas Temperature, Flue Gas Velocity, Particulate Matter (PM), Sulphur Dioxide (SO2), Nitrogen Dioxide (NO2) as per requirement of Emission Consent under Section 21 of Air (Prevention & Control of Pollution) Act, 1981 & Environmental Clearance Compliance. The monitoring stations are as follows; ELECTRIC ARC FURNACE - 01 Nos.,D.G.SET - 2 Nos.,NF- 01 Nos. DF- 01 Nos.Note:-Quoted rates shall be inclusive of all taxes excluding GST. | — | — | — | 1,72,800 | |
| — | 48.00 | — | — | ||
| Testing of Effluent Sample before and after treatment on monthly basis for pH, Colour, Suspended Solids, Total Dissolved Solids, BOD, COD, Oil & Grease, Chloride as Cl, Sulphate as SO4, Ammonical Nitrogen as N, Total Kjeldahl Nitrogen as N, Dissolved Phosphate as P as per requirement of Water (Prevention & Control of Pollution) Act, 1974 & Environmental Clearance. Note:-Quoted rates shall be inclusive of all taxes excluding GST. | — | — | — | 67,200 | |
| — | 8.00 | — | — | ||
| Testing of Ground Water Sample for Colour, pH, Turbidity, Total Dissolved Solids, Total Hardness as CaCO3, Total Alkalinity as CaCO3, Chloride as Cl, Sulphate as SO4, Nitrate as NO3, Calcium as Ca, Magnesium as Mg, Iron as Fe, Arsenic as As, Fluoride as F and Coliform Bacteria as per requirement of Environment (Protection) Act'1986 & Environmental Clearance Compliance. Note:-Quoted rates shall be inclusive of all taxes excluding GST. | — | — | — | 13,600 | |
| — | 96.00 | — | — | ||
| Monitoring of Ambient Noise Level during day time & night time at 4 different locations as per Noise Pollution (Regulation & Control) Rules, 2000 & Environmental Clearance Compliance. Note:-Quoted rates shall be inclusive of all taxes excluding GST. | — | — | — | 28,800 | |
| — | — | — | 2,59,344 | ||
| — | GST @ 18 | % on above S.N 01 to 06. | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
EnviornmentTenderdocument_1.pdf Tender document
ATTACHMENT
EnviornmentTenderdocument_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .