Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹19,360
Closing Date
7 Aug 2026, 3:00 pmClosed
THE EXECUTIVE ENGINEER
O/o The Executive Engineer DWS Division Bishalgarh
Running and Mtc. UWS Schemes under Sepahijala District. /SH Repairing, maintanance of different components and other allied works attached to SWTP Modhuban in Sonamura Nagar Panchayat area under the jurisdiction
2026_CEDWS_75243_1
152/EE/DWS/BLG/2026-27
Open Tender
Civil Works - Water Works
Percentage
90 days
Sonamura
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹19,360
1 Aug 2026
1 Aug 2026
8 Aug 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing Works | |||||
| 1.01 | Earth work in excavation by mechanical means(Hydrolic axcavator)/ Manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds of soil By manual means | - | cum | 179.9 | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with
sand (fine) from local quarry with all lifts including spreading in
horizontal layers, watering, grading to required slope, ramming,
consolidating and compacting each layer by using plate
compactor or by any suitable method complete. | - | cum | 1,177.3 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | 11,355.7 | - |
| 3.01 | 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate
20 mm nominal size) | - | cum | 10,570.6 | - |
| 4First class brick work in foundation and plinth including cost of all materials as required complete: | |||||
| 4.01 | i) In cement mortar 1:4 ( 1 cement : 4 fine sand ) | - | cum | 9,845.2 | - |
| 5Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level | |||||
| 5.01 | i) Thermo-Mechanically Treated bars/ Cold twisted deformed steel bar | - | kg | 103.9 | - |
| 6Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level: | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_76597.xls
BOQ • 0.32 MB
D.pdf
Tender Documents • 2.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .