Loading…
Loading…
Tender Value
₹11.9 L
EMD Value
Exempted
Closing Date
4 Sept 2026, 10:00 am7d left
new angles channels; Buyer
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting out the worn spots of the pan umbrella and strengthening it with a new channel and angle; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Patching the old and worn plates at various locations with the provided new plates; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the corroded bottom and top platforms of the pan and making new ones from the provided plates and strengthening the associated structure; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Installing a 20 22 manhole with blind at the pan floor; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Refurbish the corroded side plates of the molasses conditioner locatedby bending them with the new plates provided and replace the corroded bottom angle..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repair the neck and damaged shaft and arm of the crystallizer; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the worm wheel of the crystallizer make a bed for the new planetary gear box provided adjust the shaft and give a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Strengthening the weak side covers and weak cells of the crystallizers by using the provided channel and angle supports; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the corroded plates of the pan floor installed syrup malt A light A heavy B heavy C light C1 heavy tanks and installing them from the..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the neck and damaged parts of the vacuum crystallizer shell and installing a new one from the provided 10 12 mm plate and welding the relevant cu..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantle fabricate erect a 900 mm band and give a satisfactory trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantle fabricate erect an 1100 mm band and give a satisfactory trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting off the taper angle on the weak caladria of the pan and fitting the provided new 10 12 mm plate by bending it and giving a satisfactory trial; Buy..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting off the weak sloping bottom half and side plates of the air cooled crystallizer and fitting the provided new 6 8 mm plate by bending it and giving..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the weak corroded steam jacket of the calandria of the pan and installing the provided plate 8 10 mm by bending it and testing the hydrolink and ..
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak corroded ducting plates of the sugar hopper and making new ducting plates from the provided 3 mm plates and installing them ..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Replace the broken part of the Rody Melter arm and give a satisfactory trial; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Make the hopper trough using the provided plate strengthen it with an angle and give a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the faulty Trajet heater on the continuous machines installing a new one and conducting a satisfactory trial; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; The hopper 1 5 m x 1 5 m trough was renovated by riveting a 5 mm plate with a 10 mm plate and given a trial by installing a connecting rod; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; The cover of the Conti machines was renovated using an 8 10 mm plate installed in place and given a satisfactory trial by welding; Buyer
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Replace the side plates of the A B heavy run off tank with new 6 8 mm plates and replace the bottom plate with a new 10 mm plate make connections e..
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Replacing the weak side plate bottom of the Magma Mixer under
and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To dismantle old weak round and square tanks vessels of A light C light B heavy and prepare them from the provided 8 10 mm plate and give satisfactory t..
9801973
GEM/2026/B/7957506
Two Packet Bid
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Industry Unit; Cut
Saharanpur, Uttar Pradesh
Item wise evaluation
SERVICE
5 documents required · 5 mandatory
5 yrs
₹3 L
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| new angles channels; Buyer | - | - | - |
| Repair | - | - | - |
| Maintenance | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting out the worn spots of the pan umbrella and strengthening it with a new channel and angle; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Patching the old and worn plates at various locations with the provided new plates; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the corroded bottom and top platforms of the pan and making new ones from the provided plates and strengthening the associated structure; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Installing a 20 22 manhole with blind at the pan floor; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Refurbish the corroded side plates of the molasses conditioner locatedby bending them with the new plates provided and replace the corroded bottom angle.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Repair the neck and damaged shaft and arm of the crystallizer; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Remove the worm wheel of the crystallizer make a bed for the new planetary gear box provided adjust the shaft and give a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Strengthening the weak side covers and weak cells of the crystallizers by using the provided channel and angle supports; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the corroded plates of the pan floor installed syrup malt A light A heavy B heavy C light C1 heavy tanks and installing them from the.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the neck and damaged parts of the vacuum crystallizer shell and installing a new one from the provided 10 12 mm plate and welding the relevant cu.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantle fabricate erect a 900 mm band and give a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantle fabricate erect an 1100 mm band and give a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting off the taper angle on the weak caladria of the pan and fitting the provided new 10 12 mm plate by bending it and giving a satisfactory trial; Buy.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting off the weak sloping bottom half and side plates of the air cooled crystallizer and fitting the provided new 6 8 mm plate by bending it and giving.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing the weak corroded steam jacket of the calandria of the pan and installing the provided plate 8 10 mm by bending it and testing the hydrolink and .. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removing | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 and providing satisfactory leak proof trials; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 and providing a satisfactory leak proof trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak corroded ducting plates of the sugar hopper and making new ducting plates from the provided 3 mm plates and installing them .. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Replace the broken part of the Rody Melter arm and give a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Make the hopper trough using the provided plate strengthen it with an angle and give a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the faulty Trajet heater on the continuous machines installing a new one and conducting a satisfactory trial; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; The hopper 1 5 m x 1 5 m trough was renovated by riveting a 5 mm plate with a 10 mm plate and given a trial by installing a connecting rod; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; The cover of the Conti machines was renovated using an 8 10 mm plate installed in place and given a satisfactory trial by welding; Buyer | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Replace the side plates of the A B heavy run off tank with new 6 8 mm plates and replace the bottom plate with a new 10 mm plate make connections e.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Replacing the weak side plate bottom of the Magma Mixer under | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To dismantle old weak round and square tanks vessels of A light C light B heavy and prepare them from the provided 8 10 mm plate and give satisfactory t.. | - | - | - |
GENERAL MANAGER, SARSAWA SAHARANPUR, (The Kisan Cooparetive Sugar Factory Ltd. Sarsawa)
Exempted
Yes
24 Aug 2026
24 Aug 2026
4 Sept 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9801973.pdf
GEM_BID • 0.46 MB
1787587712.xlsx
GEM_OTHER • 0.01 MB
1787587723.pdf
GEM_OTHER • 3.28 MB
1787587725.pdf
GEM_OTHER • 3.28 MB
1787587732.pdf
GEM_OTHER • 3.28 MB
1787587733.pdf
GEM_OTHER • 3.28 MB
SANCTION_d36995b9-9fb6-4b45-b3e31787588023223_karanrathi.ssw.pdf
GEM_OTHER • 3.28 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].