Tender Value
₹25.8 L
EMD Value
₹25,770
Closing Date
9 Jul 2026, 6:00 pmClosed
MUNICIPAL COMMISSIONER AMC
Supply and Laying of Ready-Mix Cementitious Material for Patch Work & Ready-Mix Grout Material at different Roads of Different ward of South West Zone of AMC (ARC)
315657
26-27
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹1,500
Municipal Commissioner - Ahmedabad
₹25,770
19 Jun 2026
19 Jun 2026
19 Jun 2026
9 Jul 2026
19 Jun 2026
Name of Work: Supply and Laying of Ready-Mix Cementitious Material for Patch
Work & Ready-Mix Grout Material at different Roads of Different
ward of South West Zone of AMC (ARC)
AHMEDABAD MUNICIPAL CORPORATION
Sr. No Section Description PageNo
1 Invitation for Bid (IFB)
2 Section-1 Instructions to Bidders
3 Section-2 Qualification Information
4 Section-3 Conditions of Contract
5 Section-4 Contract Data
6 Section-5 Technical Specification
7 Section-6 Form of Bid
8 Section-7 Bill of Quantities
9 Section-8 Securities and Other Forms
10 Section-9 Drawings
11 Section-10 Documents to be furnished by Bidder
INVITATION FORBID
INVITATION FOR BID
AHMEDABAD MUNICIPAL CORPORATION
INVITATION FOR BID
Municipal Commissioner of A.M.C. invites percentage rate sealed tenders from interested contractors for the
following work within the limit of A.M.C.
Package Name ofwork Approximate Tender EMD Period of Class of
No. valueof works Fess (Rs.) completion Registration
Supply and Laying of Rs. Rs. 1500.00 Rs.25,770.00 12 Months Registration
Ready-Mix Cementations 25,77,000.00 osf “E1” Class
Material for Patch Work
& Ready-Mix Grout
Material at different
Roads of Different ward
of South West Zone of
1. Prospective / Interested bidder may download the Bid Documents from website
https://www.tender.nprocure.com free of cost till the Time and Date as mentioned on online
NIT at website https://www.tender.nprocure.com.
2. However, Bidder who is submitting the Bid Online will have to pay the Bid Document Fee
/ Tender Fee through Demand Draft only of any Schedule Bank payable at AHMEDABAD and in
favour of ‘MUNICIPAL COMMISSIONER, AHMEDABAD’. Once the Bid is received online, Bid
Document / Tender Fee will not be refundable. As Per GoG R&B Department’s Circular No.
PARACH/102/000/IB/221/(59)/CDated.24/01/2007
The Demand Draft for Bid Document / Tender fee and Bank Guarantee against Bid Security /
EMD (D.D./Pay Order / Local Micr Check/B.G.)shall be submitted in electronic format
through online (by scanning)while uploading the bid, this submission shall mean that bid
document / tender fee and Bid Security /EMD has been received. Accordingly, the offer of only
those shall beopened whose Bid Document / Tender Fee and Bid Security / EMD have been
received electronically. However, for the purpose of realization of (D.D./Pay Order / Local
Micr Check/B.G.) bidder shall send the same in original through R.P.A.D. so as to reach to
MUNICIPAL COMMISSIONER, AHMEDABAD’ at the time of bid submission.
Penetrative action for not submitting (D.D./Pay Order / Local Micr Check/B.G.) in original
to Assistant Manger(PWA)Ahmedabad Municipal Corporation by bidder shall be initiated.
WRD GR No.PRC-102014-1-MICell-K.1Dated: 29/10/2014
3. Bids received online, will be opened on the10.07.2026 at 17:00 hours at Assistant
Manger(PWA),2nd floor old Building Danapith, Ahmedabad Municipal Corporation as
specified in the online NIT at website https://www.tender.nprocure.com in the presence of
the bidders or their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the bids will
be opened on the next working day at the same time and venue.
4. A pre bid meeting will be held on 24.06.2026 at 12:00 hours at at the office of Additional
City Engineer (Road Project), 5th floor New Building, sardar Patel Bhavan, Danapith,
AHMEDABAD’ to clarify the issues and to answer questions on any matter that may be
raised at that stageas stated in clause 9.2 of ‘instructions to Bidders’ of the bidding
5. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should be
rounded off to the next thousand rupees.
6. Other Information is a sunder:
A. Agencies can prepare and edit their offers a number of times before the end of the
tender submission date and time. After the tender submission date and time, the bidder
cannot modify / edit / withdraw their submitted offer in any case. No written or online
request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date of
submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending discussion,
conferences or site visits will not be reimbursed by the Employer or Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with tender are
liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the bidder
will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the format
given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked strictly in
electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result in
disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the past, it
shall not be deemed to be aground / reason for not giving required information for this
L. Information supplied for earlier projects shall not be considered while evaluation of this
bid. The Government will not ask for any other information, unless it is found absolutely
necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
For the works costing up to Rs. 7.5 crore (WRD Works), Rs.7.0 crore (ROAD/ BRIDGE/
BUILDING WORKS), Rs. 0.5 Crore (Electrical Works) kindly refer to GoG NWRWS & K
Department’s Circular No.Paracha/1097/1397(11)/pa.fa./ MICELL(k-1) dated 18/01/2018
and Dated 30/09/2022
For the works costing under Rs. 7.5 crore for Construction work of Water Resources
Department, Rs.7.0 crore for Roads, Bridge sand Building and Rs.050 crore for Electrical work
following documents shall be submitted in electronic format only through
onlinebyscanningand the (i) Bid Document Fee / Tender Fee (ii) Bid Security/ EMD should be
sent in original to the Tender opening authority through RPAD, so as to reach the Executive
Engineer within 7 days from last day of submission of Bid.
(i) BidDocumentFee/TenderFee
(ii) BidSecurity/EMDorValid EMDExemptionCertificateof AppropriateClass of
Registration of Approved Contractors
(iii) RegistrationCertificateofAppropriateClass
(iv) RegistrationCertificateofspecialcategory–Road/Buildingand Category
I/II/III, if required
(vi) WorkExperience,ifnecessary…
(vii) OtherDocuments,asrequired…
SCHEDULE OF BIDDING PROCESS
Sr. No. Event Description Date
1 Sale of Bid Documents 18-06-2026
2 Last date of Online submission 09-07-2026 before 18:00 hrs.
3 Last date of Physical submission 10-07-2026 before 16:00 hrs.
4 Pre bid meeting 24-06-2026 at 12:00 Hrs.
5 Opening of Technical Bid 09-07-2026 at 16:00 hrs.
6 Opening of Price bid To be intimated later.
7 Validity of Bid 180 Days.
INSTRUCTIONS TO BIDDERS
Section1:Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 8 19. Sealing & Marking of Bids
2. Source of Funds 8 20. Deadline for Submission of
3. Eligible Bidders 8 21. Late Bids
4. Qualification of the 8 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 12 E. Bid Opening and Evaluation
7. Site Visit 12 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 13 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 13 27. Correction of Errors
10. Amendment of Bidding 14 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 15 F. Award of Contract
13. Bid Prices 15 31. Award Criteria
14. Currencies of Bid and 16 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 16 33. Notification of Award and
Signing of Agreement
16. Bid Security 16 34. Performance Security
17. Alternative Proposals By 17 35. Advance Payment and
Bidders Security
18. Format and Signing of Bid 17 36. Dispute Review Expert
37. Corrector Fraudulent Practices
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works (as
defined in these documents and referred to as ‘the works”) detailed in the table given in
IFB. The bidders may submit bids for any or all of the works detailed in the table given in
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are synonymous.
2. Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
3.3 Work Experience Requirement (Past 5 Years)
The bidder should have satisfactorily completed, in any Central / State Govt. / PSU / Local Body, the
One similar completed works costing not less than the amount equal to 80% of the estimate
Two similar completed works costing not less than the amount equal to 50% of the estimate
Three similar completed works costing not less than the amount equal to 40% of the estimate
Definition of Similar Work
“Similar work” shall mean any project involving repairs of potholes and patches in Asphalt Roads or
Repair and Rehabilitation / Resurfacing of Asphalt Surface using premixed.
3.4 Technical Requirement
The Bider must submit an MoU with a Manufacturer ofInnovative ready mix cementitious
material (Quick fix Repair Solution) and Innovative Cementitious Surface Painting Mix (Quick
Seal) havingCement, Useful chemicals, green sand (Silica sand) having SiO2 more than 97%
Manufacture company should have EC clearance & Green certificate.
The bidder should have Mou with any agency/ contractor having experience of Pot hole
The bidder should submit performance Certificate of quoted product from Govt.
Dept./Corporation
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including drawings
and charts, as necessary. The proposed methodology should include a program of
construction backed with equipment planning and deployment duly supported with
broad calculations and quality assurance procedures proposed to be adopted justifying
their capability of execution and completion of work as per technical specifications,
within stipulated period of completion.
#4.5 QUALIFICATION CRITERIA:
(Applicable for the works which require Pre Qualification)
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/ fail
criteria regarding the Applicant’s general and particular experience, personnel and
equipment capabilities and financial positions, as demonstrated by the applicant’s
responses in the forms attached to the letter of application ( specified requirement for
joint ventures are given under para 4.6 below ) Subcontractors experience and resources
shall not be taken in to account in determining the applicants compliance with the
qualifying criteria.
4.5.2 Only those bidders who satisfy the eligibility and qualification criteria as specified in the
tender document shall be considered eligible and qualified for further evaluation.
4.5.3 The work experience submitted by the bidder solely pertaining to RCC work shall not be
considered as qualifying experience unless such work strictly conforms to the definition
of “Similar Work” prescribed in the tender document. In the event that the submitted
work experience does not meet the stipulated criteria and definition of “Similar Work,”
such bidder shall be liable for disqualification.
4.5.4 The decision of the Deputy Municipal Commissioner with respect to the evaluation of
eligibility, qualification, and interpretation of the “Similar Work” criteria shall be final,
conclusive, and binding on all bidders. The Deputy Municipal Commissioner reserves the
absolute right to accept or reject any bid, wholly or partially, without assigning any
reason whatsoever.
To qualify for more than one contract, the applicant must demonstrate having
experience and resources sufficient to meet the aggregate of the qualification criteria for
each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.5 Base year and Escalation
ThebaseyearshallbetakenasCurrentfinancial year
Following enhancement factors will be used for the costs of works executed and the financial
figure to a common base value for works completed in India.
Year FinancialYear Multiplyingfactor
Baseyearofinvitingtender 2025-2026
Applicant should indicate actual figures of costs and amount for the works
executed by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency
the above enhanced multiplying factors will not be applied. Instead, the current market
exchange rate (State Bank of India BC Selling rate as on the last date of submission of the
bid) will be applied for the purpose of conversion of the amount in foreign currency into
4.5.3. General Experience.
The Applicant shall meet with the following minimum criteria:
(a) Achieveda minimum annual financial turnover of Rs.11.12Crore(Defined as billing
for works in progress and completed in all classes of civil engineering construction
works only) in any one year, over the last five financial years.
(b) Experience in successfully completing or substantially completing at least one
contract of any Construction of CC Road Work items like Box Cutting, WMM,
P.C.C, C.C, Paver Block Work, etc of at least 40 percent(Rs. 4.45 Cr. + GST) of the
value of proposed contract within the last five financial years.
The works may have been executed by the applicant as prime contractor oras a
member of a joint venture or as a nominated sub-contractor. As subcontractor, he
should have acquired the experience ofexecution of all major items of works under
the proposed contract. In case a project has been executed by a joint venture,
weight towards experience of the project would be given to each joint
ventureinproportiontotheirfinancialparticipationinthejointventure ifworkexecuted
jointly otherwise as per the scope of work define in Joint Ventureagreement.
Substantially completed works means those works which are at least 90 %
completed as on the date of submission (i.e. gross value of work done up to the last
date of submission is 90 % or more of the original contract price) and continuing
satisfactorily.
For these, a certificate from the employers shall be submitted along with the
application incorporating clearly the name of the work, contract value, billing
amount, date of commencement of works, satisfactory performance of the
contractor and any other relevant information.
(the experience certificate should be signed by the officer not below the rank of EE)
(c) The contractor shall have a registration with State / Central Government or State Water
Supply Boards or in Municipal Corporation in ‘E1’ Class & Above Supporting documents
to be submitted in hard copy.
(f) BID Security / EMD (Please refer Section 01 Instruction to Bidders , Section C Preparation
of Bids, Clause 16)
(g) Cost of Documents / Tender Fee
(h) CA Certified Annual Turn Over of Last Five Financial Years
(i) Bank Certificate as per Clause 4.5.6 (Refer Sample Format for Evidence of Access to OR
Availability of Credit Facilities which is falls in Section 2 of the SBD)
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their
bid, a detailed construction planning and methodology supported with layout and
necessary drawings and calculations to allow the employer to review their proposals. The
numbers, types and capacities of each plant/equipment shall be shown in the proposals
along with the cycle time for each operation for the given production capacity to match
the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid assets
(aggregate of working capital, cash in hand and uncommitted bank guarantees) and credit
facilities up to 25 percent of the value of the contract / contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years If necessary,
the employer will make inquiries with the applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting
from contracts completed or under execution by him over the last five financial years. A
consistent history of awards against the Applicant or any partner of a joint venture may
result in failure of the applicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to bed is qualified if
Made misleading or false representation in the forms, statements submitted, and/or
Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non – performance of the contractor;
consistent history of litigation awarded against the applicant or financial failure due to
bankruptcy. The rescinding of contract of a joint venture on account of reasons other
than non – performance, such as Most Experienced partner of joint venture pulling out,
court directions leading to breaking up of a joint venture before the start of work, which
are not attributable to the poor performance of the contractor will, however, not affect
the qualification of the individual partners.
4.5.10. The bidder who have applied for corporate Debt Restructuring (CDR) / facing recovery
proceedingsfromfinancialinstitutions/facingwindingupprocessing/thoseunderBIFR
inthelast5financialyearshallbeconsideredforbidqualification.Howeverifthebank/
financialinstitutionhas acceptedtheproposal ofdebtrestructuringon orbeforethelast
dateofonlinesubmission,thesame shallbe consideredforfurtherevaluation.An affidavit
bybidderalongwithcertificatefrombankmustbeproducedinsuchcases.IncaseofJoint Venture
agreement,this provisionshallbeapplicableforbothleadpartnerandJVpartner.
4.6 JOINT VENTURE: Deleted
4.6.1. Jointventuresmustcomplywiththefollowingrequirement:
(a) Followingaretheminimumqualificationrequirements:
(i) Theleadpartnershallmeetnotlessthan50percentofallcriteriagiveninpara
4.5.6 &4.5.6above.Thejointventuremustcollectivelysatisfythecriteriaofpara
4.5.3&4.5.6above.Theexperienceoftheotherjointventurepartnersshallbe
consideredifitisnotlessthan30percentofthequalifyingcriteriainpara4.5.3&
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8 above.
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and shall be
submitted with a copy of the joint venture agreement providing the joint and several
liabilities with respect to the contract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its partnersindividually
or as a partner in any other joint venture. In case dissolution of a joint venture, each one
of the constituent firms may qualify if they meet all the qualification requirements,
subject to the written approval of the Employer.
4.7. BidCapacity.
Applicants who meet the minimum qualification criteria will be qualified only if their
available bid capacity at the expected time of bidding is more than the totalestimated
cost of the works. The available bid capacity will be calculated as under:
AssessedAvailableBidCapacity=(A*N*2-B),where
A=Maximum value of work executed in any one year during the last five years (updated
to the price level of the year indicated in appendix) taking into account the
completed as well as works in Progress.
B=Value at current price level of the existing commitments and ongoing works to
becompletedduringthenext12 Months(periodofcompletionofworkforwhichbidsare
N=Number of years prescribed for completion of the works for which the bids are invited.
Note :-In Case of joint venture, the available bid capacity will be applied for each
partner to the extent of his proposed participation in the execution of the
4.8 Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have:
- Made mislead ignore false representation in the forms, statements and Attachments
the submitted in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly completing
the contract, inordinate delay in completion, litigation history, or financial failures
- Participated in the previous bidding for the same work and had quoted unreasonably
high bid prices and could not furnish rational justification to the employer.
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with the
bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his Bid,
and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine
the Site of work and its surrounding and obtain all information that may be necessary for
preparing the Bid and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDINGDOCUMENTS
8. Content of Bidding Documents
8.1 These to bidding documents comprises the documents listed be low and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the bidder
in compliance to section 2 will be prepared by him and furnished as Volume-V in two
parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, and technical specifications, bill of quantities, forms,
Annexes and drawings in the Bid Document. Failure to comply with the requirements of
Bid Documents shall be at the bidder’s own risk. Pursuant to clause 26 hereof, bids
which are not substantially responsive to the requirements of the Bid Documents shall be
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may notify
the Employer in writing or through E-mail at the Employer’s address indicated in the
invitation to bid. The Employer will respond to any request for clarification which he
received earlier than 15 days prior to the deadline for submission of bids. Employer’s
response will be published on website including a description of the enquiry but
without identifying its source.
10. Pre-bid meeting
10.1 Prospective bidders requiring any clarification of the bidding documents may notify the employer by
email or through fax/ post/ courier at the Employer’s address indicated in the Notice Inviting Tenders
twenty four (24) hours before the Pre Bid Meeting. Employer, at its sole discretion, may hold the Pre-
Bid Meeting at the time, date, and Venue.
10.2 The purpose of the meeting will be to clarify issues and to answer the questions on any matter that may
be raised at that stage.
10.3 Any modifications of the bid documents listed in Clause 9.1, which may become necessary as a result of the
pre-bid meeting or which are required in the opinion of the Employer shall be made by the Employer
exclusively through the issue of an amendment pursuant to Clause 12 and not through the minutes of the
pre-bid meeting.
• Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
• Pre Bid Meeting shall be held on Date:-24-06-2026 at 12:00 Hrs. in the office of Add.City Engineer
Office, 5th floor Road & Bridge Department, Sardar Patel Bhavan, Danapith, Ahmedabad Municipal
Corporation, Ahmedabad.
11.0 Amendment of Bidding Documents
11.1 Before the deadline for submission of bids, the Employer may modify the bidding documents by issuing
11.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on website
www.tender.nprocure.com The prospective bidder shall refer to website to check any addendum before
hours of opening of bids. AMC will not give any advertisement for the same.
11.3 To give prospective bidders reasonable time in which to take an addendum into account in preparing their
bids, the Employer may, at his desecration, extend as necessary the deadline for submission of bids.
11.4 Prospective bidders should attach the addendum made for the work & if fails to do so than also the
changes made through such addendum shall be applicable & bound to the bidder.
C. PREPARATIONOFBIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause8.1)
shall be in two separate parts:
Party shall be named“ Technical Bid”and shall comprise
(i) Bid Security in the form specified in Section
(ii) QualificationInformationandsupportingdocumentsasspecifiedinSection2
(iii) Certificates, under takings, affidavitsasspecifiedinSection2
(iv) AnyotherinformationpursuanttoClause4.5oftheseinstructions
(v) Undertaking that the bid shall remainvalidfor the period specified in Clause
PartII shall be named“FinancialBid”and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details/information pertaining to each parti.e. technical as
well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars VolumeNo.
Invitation for Bids(IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the
priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words) for
all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words).Items for which no rate or price is entered by the bidder will
not be paid for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder.(GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees. All
payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 180+45 = 225 days after the deadline
date forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer may
request that the bidders may extend the period of validity for a specified period. A bidder
may refuse the request without forfeit inghisbidsecurity. A bidder agreeing to the
request will not be required or permitted to modify his bid, but will be required to
extend the validity of his security for a period of the extension, and in compliance with
Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in favor of
Employer as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume
III. (Bank Guarantee is applicable only for Bid Estimated Amount of 01 Crore and
above) and Bank Guarantee of Schedule and Private Banks shall be considered as per
GoG Finance Department’s Circular No. FD/MSM/e- file/4/2023/0057/D.M.O. Date
21/04/2023 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and KalpsarDepartment of
Govt of Gujarat. Exemption Certificate is applicable only when Registration Certificate
of Appropriate Class and Category of Approved Contractors is required as eligible
criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for the
bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of 180+45 =
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated in
Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of
the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed
the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid validity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) InthecaseofasuccessfulBidders,iftheBidderfailsthespecifiedtimelimitto
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will be intimated
maximum three times within the validity period for negotiation, If contractor does not
respond in time, his Bid Security (EMD) will be forfeited and his tender will be rejected.
Punitive action will be taken on such contractors.
(e) EMD/SD/Performance Bank Guarantee will be submitted as per the Mention Below
a. The Bidder shall furnish, a Bid Security of the amount as shown in NIT as part of his bid, in the
form of D.D. or pay order or Bank Guarantee in favour of Hon. Municipal Commissioner,
Ahmedabad valid for 180 days from the last date of online submission of tender
Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as non non-
responsive. Any bid having bid security for lesser value and shorter validity period shall be treated as non non-
(a) The bid securityty of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as
promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest tenders, will be returned
when the successful bidder has furnished the required security deposit and signed the agreement.
The Bid Security of the Successful Bidder will be discharged when the bidder has signed the Agreement and
furnished the required security deposit.
The Bid Security shall be forfeited, if the Bidder
Bidder withdraws the Bid after Bid opening during the period of
Bid validity; in the case of a successful Bidder, if the Bidder fails within the specified time limit to sign the
Agreement; or Furnish the required security deposit. commence the work after signing signin the agreement
within 15 days No interest shall be paid by the owner on any tender guarantee. The issuing branch of the
Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp papers of requisite
value in accordance with the stamp Act applicable to that particular state of Indian Union, where executed.
The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly indicate in (block
letters) his name, designation, Power of Attorney No. / Signing Power No. etc.
Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/ initialed by the executing
officers and the last page shall be signed in full, indicating the particulars as aforesaid under the seal of the
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or time
for completion), basic technical design as indicated in the drawing and specifications.
Conditional offers or alternative offers will not be considered further in the process of
tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of these
Instructions to bidder as the “Technical Bid “and “Financial Bid” in separate parts to be
D. SUBMISSIONOFBIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website specified
above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an amendment
in accordance with Clause 10, in which case all right and obligation of the Employer and
the bidders previously subject to the original deadline will then be subject to the new
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. NobidshallbemodifiedorwithdrawnafterthedeadlineforsubmissionofBid.
22.4. Withdrawal or modification of a bid between the deadlines for submission of bids and
the expiration of the original period of bid validity specified in Clause 15.1above or as
extended pursuant to Clause 15.2 may result in the forfeiture of the Bid security
pursuant to Clause
E. BIDOPENINGANDEVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant to
Clause 22, in the presence of the Bidders or their representatives who choose to attend
at time, date and the place specified in Appendix in the manner specified in Clauses
and 23.3, In the event of the specified date of Bid opening being declared holiday for the
Employer, the Bids will be opened at the appointed time and location on the next
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security
furnished with each bid will be announced. If the bid security furnished does not conform
to the amount and validity period as specified in the invitation for bid (ref. Column 4 and
paragraph 3), and has not been furnished in the form specified in Clause 16, the technical
bid will not be opened.
23.4. (i)Subject to confirmation of the bid security by the issuing Bank, the bids accompanied
with valid bid security will be taken up for evaluation with respect to the
Qualification information and other information furnished in part I of the bid
pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose financial
bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only these
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount
of each bid, any discount and such other details as the Employer may consider
appropriate, will be announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found responsive
in accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will
be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid,
be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid,
any discount, and such other details as the Employer may consider appropriate, will be
announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of Bids
and recommendations for the award of a contract shall not be disclosed to Bidders or
any other persons not officially concerned with such process until the award to the
successful Bidder has been announced. Any effort by Bidder to influence the Employer’s
processing of Bids or award decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at
his discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit
rates. The request for clarification and the response shall be in writing or by e- mail, but
no change in the price or substances of the Bid shall be sought, offered, or permitted
except as required to confirm the correction of arithmetic errors discovered by the
Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating
to his Bid opening to the contract is awarded. If the Bidder wishes to bring additional
information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid
comparison or contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether
each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly
signed; (c) is accompanied by the required securities and; (d) is substantially responsive
to the requirements of the Bidding document. During the detailed evaluation of the
“Financial Bid”, the responsiveness of the bids will be further determined with respect to
the remaining bid conditions, i.e., priced bill of quantities, technical specifications, and
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms, conditions
and specifications of bidding documents, without material deviation or reservation. A
material deviation or reservation is one (a) which affects in any substantial way the
scope, quality, or performance of the Works; (b) which limits in any substantial way,
inconsistent with the Bidding documents, the Employer’s rights or the Bidder’s
obligations under the Contract; or(c) whose rectification would affect unfairly the
competitive position of other Bidders presenting substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer, and
may not subsequently be made responsive by correction or withdrawal of the non-
conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation. Variation
and deviations and other factors, which are in excess of the requirements of the Bidding
documents or otherwise result in unsolicited benefits for the Employer, shall not be
taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not be
taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate of the cost of work to be performed under the contract the Employer may
require the Bidder to produce detailed consistency of those prices with the construction
methods and schedule proposed. After evaluation of the price analyses, the Employer
may require that the amount of the performance security set forth in Clause 34 be
increased at the expense of the successful /bidder to a level sufficient to protect the
Employer against financial loss in the event of default of the successful Bidder under the
29.6. A bid which contains several items in the bill of Quantities which are unrealistically priced
low and which cannot be substantiated satisfactorily by the bidder may be rejected as
non-responsive.
F. AWARDOF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has
been determined.
(i) to be substantially responsive to the Bidding documents and who has offered the
lowest evaluated Bid Price; and
(ii) To be within the available bid capacity adjusted to account for his bid price which
is the lowest evaluation in any of the packages opened earlier than the one
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest
evaluated bid. The contract will in such cases be awarded to the next lowest
bidder at his evaluation bid price.
32. Employer’s Right to accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid,
and to cancel the Bidding process and reject all Bids, at any time prior to the award of
contract, without thereby incurring any liability to the affected bidder or Bidder or any
obligation to inform the affected Bidder or Bidders of the grounds for the Employer’s
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by cable, telex or facsimile confirmed by
registered letter. This letter (hereinafter and in the condition of contract called the
“Letter of Acceptance”) will state the sum that the Employer will pay the Contractor
inconsideration of the execution, completion, and maintenance of the Works by the
Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
33.2The notification of award will constitute the formation of the contract, subject only to the
furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the successful
Bidder. It will be signed by the Employer and to the successful Bidder, within 28 days
following the notification of award along with the Letter of Acceptance. Within 21 days
of receipt, the successful Bidder will sign the Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the Employer
will promptly notify the other Bidders that their Bids have been unsuccessful.
34. Performance Security
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall
furnish to the Employer an irrevocable and unconditional guarantee from a Bank in
the form set forth in Annexure 1 (the “Performance Security”) for an amount equal
to 5% (five percent) of its Contract Price. In case of
bidsmentionedbelow,thesuccessfulBidder,alongwiththePerformanceSecurity,
shall also furnish to the Authority an irrevocable and unconditional guarantee from a
Bank in the same form given at Section 8 towards an Additional Performance
Security (The “Additional Performance Security”) for an amount calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but up
to 20% of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 20% of the difference in the (i) Estimated
Project Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the
Estimated Project Cost, then the Additional Performance Security shall be
calculated @ 30% of the difference in the (i) Estimated Project Cost (as
mentioned in Bid Document) - Minus 10% of the Estimated Project Cost and
(ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days of the Defects
Liability Period and the Additional Performance Security shall be valid beyond
(twenty-eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a Bank
Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and
acceptable to the Employer. As per AMC Circular And Circular attached as Annexure I or
as per their latest amendment.
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture ofthe Bid
35 AdvancePaymentandSecurity
35.1 The Employer will provide an Advance payment on the ContractPriceas stipulated in
the Conditions of Contract, subject to maximum amount, as stated in theContract Data.
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in completing for the contract in
question and will declare the firm ineligible, either indefinitely or for a stated period of
time, to be awarded a contract with National Highways Authority of India/ State PWD
and any other agencies, if it at any time determines that the firm has engaged in corrupt
or fraudulent practices in completing for the contractor, or in execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the
Conditions of Contract.
APPENDIX TO ITB
Clause Reference With
respect to Section –I
1. The Name of the Employer is The Municipal Commissioner, [Cl.1.1]
Ahmedabad Municipal Corporation (AMC), Ahmedabad.
2. Thelastfivefinancialyears.
3. ThisAnnualFinancialTurnoverAmountisRs. [Cl.4.5.3(a)]
4. Value of Work is Rs.
6. ThecostofelectricworkisRs.
7. Thecostofwatersupply/sanitaryworksisRs.
8. Liquid as sets and/or availability of credit facilities is Rs. 6,44,250.00 [Cl.4.5.6]
(25% of Total Value of Work)
9. Pricelevelofthefinancialyear 2024-25 [Cl.4.5.2]
10. The pre-bid meeting will take place at Additional City Engineer office [Cl.9.2.1]
5the floor new building sardar patel bhavan,Ahmedabad Municipal
Corporation (AMC), Ahmedabad
11. The technical Bid will be opened at the office of the Assistant
Manager(PWA),Old building second Floor, sardar patel bhavan,
Ahmedabad on dt ............................. at
12. Address of the Employer: Assistant Manager(PWA),Old building
second Floor, sardar patel bhavan, Ahmedabad
14. The bid should be submitted latest by As stated on online [Cl.20.1&20.
15. The bid will be opened at Assistant Manager(PWA),Old building [Cl.23.1]
second Floor, sardar patel bhavan, Ahmedabad As stated on
16. The Bank Draft in favor of Municipal Commissioner, Ahmedabad
Municipal Corporation, Ahmedabad
18. Escalation factors (for the cost of works [Cl.4.5.2]
executedandfinancialfiguretoacommonbase
value)forworkscompleted
Year FinancialYear Multiplyingfactor
Baseyearofinvitingtender 2025-2026
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[ReferenceCL.4.5.5]
The contractors shall also give a list of machineries in his possession and which they propose to use
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this work
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work to
be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is
more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum Two Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but
more than Rs.5 lakhs.
4. Minimum One Diploma Civil Engineers for the work when the cost of work to be executed
is less than Rs. 5 lakhs. The Engineer so employed for the Government work must have
sufficient experience to handle the work independently. Such an Engineer shall have to
stay at the site of work and he shall not be entrusted with other duty except this work.
5. Maximum age limit for Engineer deployed on site is 60 years.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy
Executive Engineer-in-charge of the work the Name, Qualifications, copy of mark sheet,
Color Photograph and the appointment order issued such engineers engaged for this
contract work. If 15 days after issue of work order such designated Site Engineers do not
resume or do not remain present on site of work, the recovery at the rate of Rs.15,000-00
per month per Engineer will be made from the bills/deposit/dues of the contractor. Such
recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATIONINFORMATION
The information to be filled in by the Bidder in the following pages will be used for the
purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders. This
information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 20 2 5 - 2 0 2
Work performed in the last five years 2 0 2 4 - 2 0
15.2.1 Work performed as prime contractor, work performed in the past as a nominated sub-
contractor will also be considered the sub-contract involved execution of all main items
of work described in the bid documents, provided further that all other qualification
criteria are satisfied (in the same name) on works of a similar nature over the last five
years** and in current year before the submission of the bid.
Project Name of Description Contract Value of Date Stipulated Actual date Remark
Name the of work No. contract of period of of explaining
Employer (Rs. issue completion completion* reasons for
Crore) of delay
order Completed
*Attach certificate(s)from the Engineer(s)in-charge
**Immediately preceding the financial year in which bids are received.
1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a
nominated sub-contractor, will also be considered provided the sub-contract involved
execution of all main items of work described in the bid document, provided, further that
all other qualification criteria are called (in the same name and style) in the last five
years** and in current year before the submission of the bid.
Year Name Name of Quantity of work performed(Cum/MT) Remarks*
of the the Cement Masonry Earth Bituminous (indicate
work Employer Concrete ITEM 2 Works Work contract Ref)
(Including ITEM 3 ITEM
1.4 Information on Bid Capacity (works for which bids have been submitted and works which
are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description of Place Contract Name Value Stipulated Value of Anticipated
works & No. &Address Contract Period of Works* of
State of (Rs. Cr) Completion remaining completion
*Attach certificate(s) from the Engineer(s)in-charge
**Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref. Clause
4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and execution
of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of the Conditions
Position Name Qualification Year of Year of
Experience experience in
(General) the proposed
Project Manager
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Sub-Contractor Experience in
works Contractor (Name & similar work
Attach copies of certificates on possession of valid license for executing water supply/
sanitary work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and attach
1.11 Information on Litigation history in which the Bidder is involved. (In Last Five Years)
Other Party Employer Cause of Amount Remarks showing
(ies) Dispute Involved Present Status
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction to
Bidders. (Name of Consultant engaged for project preparations is * .............................. )
1.13 Proposed work method and schedule. The Bidder should attach descriptions, drawings
and charts as necessary to comply with the requirements of the Bidding documents.
(Refer ITB Clause 4.1)
1.14 Programmed
3. Additional Requirements
3.1 Biddersshouldprovideanyadditionalinformationrequiredtofulfillthe requirements of
Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
* Fill the name of Consultant
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR
AVAILABILITY OF CREDIT FACILITIES
(CLAUSE4.5.6OFITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work,namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs. to meet their working capital requirements for executing the above
during the contract period.
Senior Bank Manager
Address of the Bank
(on non-judicial stamp paper of rs.300/- appropriate value, duly attested by notary public)
1. I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also here by certifies that neither our firm M/s.
have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us for such
works have been rescinded, during last five years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by the
Department to verify this statement or regarding any (our) competence and general
4. The Undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the
Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I,the undersigned do here by undertake.........that ...................... our firm M/s
up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 37 37 Bill of Quantities
2 Interpretation 38 38 Changes in the Quantities
3 Language and Law 39 39 Variations
4 Engineer’s Decisions 39 40 Payments for Variations
5 Delegations 39 41 Cash Flow Forecasts
6 Communications 39 42 Payment Certificates
7 Sub-Contractors 39 43 Payments
8 Other Contractors 39 44 Compensations Events
9 Personnel 40 45 Tax
10 Employer’s & Contractor Risk 40 46 Currencies
11 Employers Risks 40 47 Price Adjustment
12 Contractor’s Risk 40 48 Retention
13 Insurance 40 49 Liquidated damages
14 Site Investigations Reports 41 50 Bonus
15 Queries about the Contract 41 51 Advance Payment
16 Contractors to Construct the 41 52 Securities
17 The Works to be Completed By 41 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 41 54 Cost of Repair
20 Discoveries 42 E. Finishing the Contract
21 Possession of the Site 42 55 Completion
22 Access to the Site 42 56 Taking Over
23 Instructions 42 57 Final Account
24 Disputes 42 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 43 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programmed 44 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 44 F. Special Conditions of Contract
30 Delays Ordered by The 44 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 45 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONSOFCONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions of
Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming
part of the Bid
CompensationEventsarethosedefinedinClause44hereunder
The Completion Date is the date of completion of the Works as certified by the
Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute,
complete and maintain the Works till the completion of Defects Liability Period. It
consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body who's Bid to carry out the Work
has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the
Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter
as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and
calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contractor to act in replacement of
the Engineer) who is responsible for supervising the Contractor, administering the
Contract, certifying payments due to the Contractor, issuing and valuing Variations to
the Contract, awarding extensions of time, and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to the
site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified in the
Contract Data. The Intended Completion Date may be revised only by the Engineer by
issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the Contract and
any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor
shall commence execution of the works. It does not necessarily coincide with any of the
Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the
Contract or to carry out a part of the work in the Contract which includes work on the
Temporary Works are works designed, constructed, installed, and removed by
the Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works. The
Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also
means female or neuter and the other way around. Heading have no significance.
Words have their normal meaning under the language of the Contract unless
specifically defined. The Engineer will provide instructions clarifying queries about
Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to the
Completion Date and Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following order of
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual
matters between the Employer and the Contractor in the role representing the
5.1 The Engineer may delegate any of his duties and responsibilities to other people
after notifying the Contractor and may cancel any delegation after notifying the
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is delivered
(in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the Contract
without the approval of the Employer in writing. Sub contracting shall not alter
the Contractor’s obligations. Sub-contracting of supply or specific items of work
is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for the
part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public
authorities, utilities and the Employer between the dates given in the Schedule of
other Contractor. The Contractors shall as refer to in the Contract Data, also
provide facilities and services for them as described in the Schedule. The
employer may modify the schedule of other contractors and shall notify the
contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated in
the Schedule or other personnel approved by the Engineer. The Engineer will
approve any proposed replacement of key personnel only if their qualifications,
abilities, and relevant experience are substantially equal to or better than those
of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of the
Contractor Staff or his work force stating the reasons the Contractor shall ensure
that the person leaves the Site within seven days and has no further connection
with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks,
and the Contractor carries the risks which these Contracts states are Contractors
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they
directly affect the execution of the Works, the risks of war, hostilities, invasion,
act of foreign enemies, rebellion, revolution, insurrection or military or usurped
power, civil war, riot commotion or disorder (unless restricted to the Contractor’s
employees), and contamination from any nuclear fuel or nuclear waste or
radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and
death which arise during and in consequence of the performance of the Contract
other than the excepted risks are the responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects Liability
Period, in the amounts and deductibles stated in the Contract data for the
following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Material sand
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the
Engineer for the Engineer’s approval before the Start Date. All such insurance
shall provide for compensation to be payable in the types and proportions of
currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required,
the Employer may affect the insurance which the Contractor should have
provided and recover the premiums the Employer has paid from payments
otherwise due to the Contractor or, if no payment is due, the payment of the
premiums shall be a debt due.
13.4 Alterations to the terms of insurance shall not be made without the approval of
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports
referred to in the Contract Data, supplemented by any information available to
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contract or to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and
shall carry out the Works in accordance with the programmed submitted by the
Contractor, as updated with the approval of the Engineer, and complete them by
the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed
Temporary works to the Engineer, who is to approve them if they comply with the
Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of
the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary or
permanent work are subject to prior approval by the Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to notify
the engineer of such discoveries and carry out the Engineer’s instructions for
dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and this
will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not
handed over to the Contractor, then contractor/ Employer may fore-close the
contract. Contractor/Employer has to foreclose the work within 30 days after
lapse of 25%-time limit and after 30 days foreclosure option will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any place
where materials or plants are be in manufactured/ fabricated/ assembled for the
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to works
which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts
and records relating to the performance of the Contractor and to have them
audited by auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to The Deputy Commissioner,
AMCwithin14daysofthenotification of
the Engineer's decision. If the issue is not resolved, any party can refer the matter
for conciliation within 15 days from the decision given by the The Deputy
Commissioner, AMC.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied
withthedecisionoftheThe Deputy Commissioner, AMC,boththeparties have
to refer to the Chief Engineer concern for the conciliationprocess.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with
the decision of the The Deputy Commissioner, AMC, boththe parties have
to refer to the # The Deputy Commissioner, AMC.
If the dispute is not resolved through the conciliation process, he may referthe
dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the
Contractor fails to refer a claim / dispute to the Higher Authority within14 days of
the notification of the Engineer's decision, the Contractor shall not be entitled to
any additional payment/claim if he doesn’t follow the above sequence in
stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration procedure
stated in the Special Conditions of Contract.
For ARBITRATION, as per AMC Circular No.,02 date:24/09/2024 and all latest
Circular shall be applicable. (Arbitration process will be applicable as per AMC latest
Circular)If circular not find from the AMC website after that as per requesting of the
bidders AMC will provide this Circular.
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods, arrangements
orders, and timing for all the activities in the works along with monthly cash flow
27.2 An update of the Programme shall be a programme showing the actual progress
achieved on each activity and the effect of the progress achieved on the timing of
the remaining work including any changes to the sequence ofthe activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated programme
at intervals no longer than the period stated in the Contract data. If the
Contractor does not submit an updated programme within this period, the
Engineer may withhold the amount stated in the Contract data from the next
payment after the date on which the overdue programme has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation Event
occurs or a Variation is issued which makes it impossible for completion to be
achieved by the Intended Completion Date without the Contractor taking steps to
accelerate the remaining work and which would cause the Contractor to incur
additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a
decision upon the effect of a compensation event or Variation and submitting full
supporting information. If the Contractor has failed to give early warning of a
delay or has failed to cooperate in dealing with a delay, the delay by this failure
shall not be considered in assessing the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the contractor
for extension of Intended Completion Date refer to the Employer his decision. The
employer shall in not more than 21days communicate to the engineer the
acceptance or otherwise of the Engineer’s decision. If the employer fails to give
his acceptance, the Engineer shall not grant the extension and the contractor may
refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to review
the plans for remaining work and to deal with matters raised in accordance with
the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to provide
copies of his record to those attending the meeting and to the Employer. The
responsibility of the parties for actions to be taken is to be decided by the
Engineer either at the management meeting or after the management meeting
and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely
future events or circumstances that may adversely affect the quality of the work,
increase the Contract price or delay the execution of works. The Engineer may
require the contractor to provide an estimate of the expected effect of the future
event or circumstance on the contract price and completion date. The estimate is
to be provided by the Contractor as soon as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided or
reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
C. QUALITYCONTROL
# 33. Identifying Defects/Defect liability period
33.1 : Defect liability period: The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of completion.
Ahmedabad Municipal Corporation shall give the contractor a notice in writing
about the defects and the contractor shall make good the same within 15 days of
receipt of the notice. In the case of failure on the part of the contractor, the
Engineer-in-charge may rectify or remove or re-execute the work at the risk &
cost of the contractor. The Ahmedabad Municipal Corporation shall be entitled to
appropriate the whole or any part of the amount of security deposit towards the
expenses, if any, Incurred by him in rectification, removal or re-execution. The
Defects Liability period shall be as under….
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall be
3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put to
tender), the period shall be 12 (Twelve) months from the certified date of
completion or one monsoon, whichever is later.
(c) FormajorprojectscostingmorethanRs.1crore,the period shall be 36Months from
the certified date of completion which should include three monsoons.
(d) For original building works the defect liability period will be 4 years or elapse of
monsoon period following date of possession of building taken over by user
agency following the certified date of completion,which ever is later.
For the purpose of deciding the monsoon period, the 30th September shall be
treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated
N,Dated27/05/2013andCircularNo.TNC/10/2016/Clause17A(Correction/(1)CDate
33.1 ForRoadworks:
FreemaintenanceguaranteeperiodforworksofRoad/Bridgeconstruction
(a) For resurfacing work of road free maintenance guarantee period one year
from the date of completion.
(b) Incase of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee from the
certified date of completion. During this period the contractor shall visit the
site every six months along with the concerned Section Officer / Deputy
Executive Engineer and will examine the work already carried out in this
contract like road work, jungle cutting, side shoulders, side gutter, road
furniture, patta etc. and will prepare Km. wise inspection report duly signed
by all concerned and any defect observed shall be done within 15 days by the
contractor at his risk and cost as per the direction of Engineer in charge. The
contractor needs to do videography of these visits and
requiretosubmitatthetimeofreleaseofFMG.IfB.T.thesurfaceduring
the maintenance period of 4 years is worn out then agency shall have to
provide renewal coatingas per tenderitem asdirectedbythe Engineer-in-
charge. The amount equivalent to 5% of each running bill shall bewithheld
and will be released after the free maintenance guarantee period (i.e. 4 years)
However, this amount shall be released against fixed deposit or bank
guarantee pledged in the name of Executive Engineer after completion
certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under no
circumstances shall exceed the allowable limit set forth in the relevant clause
for the material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment / cutting
for side shoulders, side gutters, kilometer / indicator / guard stones, sign
boards etc. are completed in all respect by the contractor.After completion of
the miscellaneous items, the above said 2% withheld amount shall be
(Govt.ofGujarat'sG.R.No.:TNC-10-2013-3(Part-3)/C,Dtd.13/12/2013).
(3) Videography forthesurfaceunderMaintenanceGuaranteeistobedone as per
Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing
more than Rs. 5.00 Crore.
(4) Settingupofadequatelaboratory&deploymentofqualityengineers.
The contractor shall have to set up the laboratory with adequate equipment.
Till the setting up of adequate laboratory is completed & reported of this to
the engineer (subject to due verification by engineer’s representative) by
contractor in writing, Rs.2,00,000/- shall be withheld. The qualified quality
Engineer shall be deployed exclusively for this contract by the contractors. If
quality Engineer is not deployed by contractor within one month after the
date of work order, the amount equivalent to Rs.20,000 per month shall be
recovered till the actual deployment of quality engineer. The amount so
recovered towards the deployment of quality engineers shall not be refunded.
(5) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill is paid.
(6) MaintenanceduringConstructionPeriod
During the Construction Period, the Contractor shall maintain, at his own risk
and cost, the existing lane(s) of the road so that the traffic worthiness and
safety thereof are at no time materially inferior as compared to their
condition 10 (ten) days prior to the date of the Agreement, and shall
undertake the necessary repair and maintenance works for this purpose;
providedthat the Contractormay, at his cost, interrupt anddivert the flow
of traffic if such interruption and diversion is necessary for the efficient
progressofworksandconformstoGoodIndustryPractice;provided
further that such interruption and diversion shall be undertaken by the
Contractor only with the prior written approval of the Executive Engineer
which approval shall not be unreasonably withheld. For the avoidance of
doubt, it is agreed that the Contractor shall at all times be responsible for
ensuring safe operation of the road.
33.2 The Engineer shall check the Contractor’s work and notify the Contractor of any
defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a Defect
and to uncover and test any work that the Engineer considers mayhave a Defect.
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that it
does, the Contractor shall pay for the test and any samples. If there is no defect
the test shall be a Compensation Event.
34.2 a) If the Engineer instructs the contractor to carry out a test not specified in the
specification to check whether any work has any defect or not, contractor shall
perform the same and submit the results to the Engineer at his own cost.
b) The contractor has to carry out the testes of all items as per mentioned in
tender document.
34.3 As per St.Committee's resolution, 0.5% testing charges shall be deducted from
each R.A. Bill and the amount of actual testing charges shall be adjusted in the
34.4 For Testing Frequency, as per Goverment of Gujarat Circular
No.PRCH/102007/28-Date.- 31/12/2019,AMC Circular No.66 date 19/03/2019
and all latest Circular shall be applicable.
(a) 10% test will carryout at Goverment Laboratory i.e GERI/LDCE/IITRAM/AMC-
Metal Depo.Lab(AMC)
(b) 10% test will carryout at the Goverment approved Laboratory.
(c) 80% test will carryout at the Plant/Field Laboratory of this work.
34.5 Agency has to establish testing laboratory on site for the various test to be carried
out in the work for this purpose agency shall construct a pukka laboratory
building with all facility on site at location specified by the engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end of
the defects Liability Period, which begins at Completion and is defined in the
contract data. The Defects Liability Period shall be extended for as long as Defects
remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is
paid for the quantity of the work done at the rate in the Bill of Quantities for each
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may appear to him
to be necessary or advisable during the progress of the work and the contractor
shall be bound to carry out the work in accordance with any instruction in this
connection which may be given to him in writing signed by the Engineer and such
alteration shall not invalidate the contract and any additional work which the
contractor may be directed to do in the manner above specified as part of the
work shall be carried out by the contractor on the same conditions in all respects
on which he agreed to do the main work and at the same rate as are specified in
the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the tender
by more than 130%, the contractor will be paid for the quantity in excess of 130%,
at the rate entered in the SOR of the year during which the excess in quantity is
first executed.
39.1 All Variations shall be included in updated programmers produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the
one involving additional or altered class of work; where there are more than one
comparable items, the item of the contract which is nearest in comparison with
regard to class or classes of the work involved shall be selected and the decision
of the Superintending Engineer as to the nearest comparable item shall be final
and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall
be carried out at the rate entered in the Schedule of Rates of the division
for the year in which the tender was received, increased or decreased by the
percentage by which the tender amount is more or less as compared to the
amount arrived at the rates in the “Schedule of Rates” of the Division in the year
in which the tender was received. If the Schedule of rates of the Division does not
contain all the items, the percentage increase or decrease of the tender shall be
calculated considering such items which were included in the “Scheduled Rates”
of the division for the year and for materials consumed on such item the rate to
be charged would be the basic rate taken into account for fixing the rate in S.O.R.
referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work
shall be carried out at the rate decided by the competent authorities on the basis
of detailed rate analysis after hearing the contractor before a Committee of two
Superintending Engineers stationed at the same place orthe nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of
Rates” of the Division is ordered to be carried out before the rate is agreed upon,
then the contractor shall within seven days of the date of receipt by him of the
order to carry out the work, inform the Engineer-in-charge of the rate, which it is
his intention to charge for such class of work and if the Engineer in charge does
not agree to this rates, he shall by notice in writing be at liberty to cancel his
order to carry out such class of work and arrange to carry it out in such manner as
he may consider it advisable, provided always that if the contractor shall
commence work or incur any expenditure in regard thereof before the rates shall
have been determined as lastly herein before mentioned, then in such cases he
shall only be entitled to be paid in respect of the work carried out or expenditure
incurred by him prior to the date of the determination of the rate as aforesaid
according to such rate or rates as shall be fixed by the Engineer-in-charge. In the
event of the dispute, the decision of the Superintending Engineer of the Circle
shall be final.
Where, however, the work is to be executed according to the designs, drawings
and specifications recommended by the contractor and accepted by the
competent authority, the alternation above referred to shall be within the scope
of such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion
that the increase in the cost occasioned by alterations bears to the cost of the
original work and the certificate of the Engineer-in-charge as to such proportion
shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with
an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the estimated
value of the work completed less the cumulative amount certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days and
certify the amount to be paid to the Contractor after taking in to account any
credit or debit for the month in question in respect of materials for the works in
the relevant amounts and under conditions set forth in sub-clause 32.3 of the
Contract Data(secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the items
in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or reduce
the proportion of any item previously certified in any certificate in the light of
later information
43.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable under
the law. The Employer shall pay the Contractor the amounts certified by the
Engineer within 28 days of the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the contract to
the Contractor will be made by the Employer. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be paid
by the Employer and shall be deemed covered by other rates and prices in the
44. Compensation events
44.1 The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to apart of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed
beyond the Intended Completion Date then Authority will approve EOT with
eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on
due date of bid submission except GST. However, any subsequent changes in the
tax structure by Government after due date of bid submission will be
compensated (+/-) on availability or submission of actual documentation.
Contractor will have to intimate Engineer regarding changes occurred in the tax
structure after bid submission. If the contractor fails to provide such information
and if any financial obligation may arise due to change in tax structure, same will
be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of
labour, materials, fuels and lubricants in accordance with the following principles
and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date given
in the contract data up to end of the initial intended completion date or
extensions granted by the Engineer and shall not apply to the work carried
out beyond the stipulated time for reasons attributable to the contractor.
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include the amount
of secured advance granted, if any, during the month less the amount of
secured advance recovered, if any during the month. It will exclude value for
works executed under variations for which price adjustment will be worked
separately based on the terms mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the contractor
is not covered by the provisions of this or other clause in the contract, the unit
rates and prices included in the contract shall be deemed to include amounts to
cover the contingency of such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the proportion
stated in the Contract Data until Completion of the whole of the Works.
48.2 On Completion of the whole of the Works half the total amount retained is repaid
48.2 On Completion of the whole of the Works half the total amount retained is repaid
to the Contractor and half when the Defects Liability Period has passed and the
Engineer has certified that all Defects notified by the Engineer to the Contractor
before the end of this period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by the
Employer under the provision of this clause, Employer shall consider the said
request of the Contractor provided that the refund hereunder shall be made in
tranches of not less than 1% (One Percent) of the Contract Price and Contractor
furnishes an irrevocable and unconditional Bank guarantee for an equal amount
substantially in the format of Bank Guarantee for Performance Guarantee
enclosed with SBD and valid up to 60 day beyond the scheduled / extended
Defects Liability Period. On completion of the whole works, the contractor has
however an option to submit a fresh irrevocable and unconditional Bank
Guarantee for an amount equal to 5% of the total value of work executed
substantially in the format of Bank Guarantee for Performance Guarantee
enclosed with SBD and valid up to 60 days beyond the Defect Liability Period and
yet refund the Retention Money Bank Guarantee submitted for refund of
Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per day
stated in the Contract Data for each day that the Completion Date is later than
the Intended Completion Date (for the whole works or the milestone as stated in
the contract data). The total amount of liquidated damages shall not exceed the
the contract data). The total amount of liquidated damages shall not exceed the
amount defined in the Contract Data. The Employer may deduct liquidated
damages from payment due to the Contractor. Payment of liquidated damages
does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have been
paid, the Engineer shall correct any overpayment of liquidated damages by the
Contractor by adjusting the next payment certificate. The Contractor shall not be
entitled for any interest on the over payment calculated from the date of
payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in the
tender, then the contractor shall pay to the employer the relevant sum stated in
the Contract Data as Liquidated damages for such default and not as penalty for
everyday or part of day which shall elapse between relevant time for completion
and the date stated in the taking over certificate of the whole of the works on the
relevant section, subject to the limit stated in the contract data.
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages fromany monies due or to become due to
the contractor. The payment or deduction of such damages shall not relieve
The contractor from his obligation to complete the works on from any other of
his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable any
Section, a Taking Over Certificate has been issued for any part of the Works or of
a Section, the liquidated damages for delay in completion of the remainder of the
Works or of that Section shall, for any period of delay after the date stated in such
Taking-Over-Certificate, and in the absence of alternative provisions in the
Contract, be reduced in the proportion which the value of the part so certified
bears to the value of the whole of the Works or Section, as applicable. The
provisions of this Sub-clause shall only apply to the rate of liquidated damages
and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall pay to
the contractor a sum stated in Contract Data as bonus for every completed month
but subjected to maximum amount as stated in Contract Data; which shall
elapse between the date of completion of all items of works as stipulated in the
contract, including variations ordered by the Engineer and the time prescribed in
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with time limit
of the works is equal or more than 6 months. The bonus would be paidas under
%ofTime Saved %ofInitialContractPrice
entitled for Bonus
51. AdvancePayment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be Recorded
in writing) to the Contractor of the amounts stated in the Contract Date by the
date stated in the Contract Date, against provision by the Contactor of an
Unconditional Bank Guarantee in a form and by a bank acceptable to the
Employer in amounts and currencies equal to be at least 110% of the advance
payment. The guarantee shall remain effective until the
advance payment has been repaid, but the amount of the guarantee shall be
progressively reduced by the amounts repaid by the Contractor. The Mobilization
advance would be deemed as interest bearing advance at an interest rate of 10 %
to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment,plant
and Mobilization expenses required specifically for execution of the Works. The
Contractor shall demonstrate that advance payment has beenused in this way by
supplying copies of invoices or other documents to the engineer.
51.3 The advance payment shall be repaid by deduction proportionate amount from
payments otherwise due to the Contractor, following the schedule of completed
percentages of the Works on a payment basis. No account shall be taken of the
advance payment or its repayment in assessing valuations of work done,
variations, price adjustments, Compensation Events, orLiquidated damages.
52.1 The performance Security (including additional security for unbalanced bids) shall
be provided to the Employer no later than the date specified in the Letter of
Acceptance and shall be issued in an amount and form and by a bank or surety
acceptable to the Employer, and denominated in Indian Rupees. The performance
Security shall be valid until a date 60 days from the date of expiry of Defects
Liability Period and the additional security for unbalanced bids shall be valid until
a date 28 days from the date of issue of the certificate of completion. (BG Submit
As per Annexure-1)
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages arises
from the Contractor’s acts or omissions.
E. FINISHINGTHECONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion of
the works and the Engineer will do so upon deciding that the work is completed.
56.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. FinalAccount
57.1 The Contractor shall supply to the Engineer a detailed final account of thetotal
amount thattheContractorconsiderspayable asfullandfinalsettlement of all claims
under the Contract for items before the end of the DefectsLiability Period. The
Engineer shall issue a Defect Liability Certificate and certify any final payment that
is due to the Contractor within 56 days of receiving the Contractor's account if it
is correct and complete. If it is not, the Engineer shall issue within 56 days a
schedule that states the scope of the corrections or additions that are necessary.
If the Final Account is still unsatisfactory after it has been resubmitted, the
Engineer shall decide on the amount payable to the Contractor and issue a
payment certificate, within 56 days of receiving the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1becoming L2) onaccount ofexcesses and
savings in final account is observed, the Engineer/Employer shall be at liberty to
restrict the final payment of BOQ items to the lowest amount evaluated of the
bids considering the final quantities and the rates quoted including the rebates if
any. Payment of variation items shall however be made at the rates approved by
the Employer, within 90 days from thephysical completion of work.
58. OperatingandMaintenanceManuals
58.1 If “as built” drawings and/or operating and maintenance manuals are required,
the Contractor shall supply them by the dates stated in the Contract data.
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates
statedintheContract data, ortheydonot receive theEngineer’s approval, the
Engineer shall withhold the amount stated in the Contract Data from payments
due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work isshown on
the current programme and the stoppage has not been authorized by the
2. The Engineer instructs the Contractor to delay the progress of the Works and
the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct itwithin a
reasonable period of time determined by the Engineer;
6. TheContractordoesnotmaintainasecuritywhichisrequired;
7. The Contractor has delayed the completion of works by the number ofdays
forwhichthe maximumamount ofliquidateddamages can bepaidas defined in
the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering, giving,
receiving or soliciting of anything of value to influence the action of a public
official in the procurement process or in contract execution. “Fraudulent
practice”means amisrepresentation offacts inorderto influence a procurement
process or the execution of a contract to the detriment of the borrower, and
includes collusive practice among Bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive
the Borrower of the benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by the
Contractor, the Engineer shall issue a Certificate for the value of the work done
less advance payments received up to the date of the issue of the
certificate, less other recoveries due in terms of the contract, less taxes due to
deducted at source as per applicable law and less the percentage to apply to the
work not completed as indicated in the Contract data. Additional Liquidated
Damages shall not apply. If the total amount due to the Employer exceeds any
Damages shall not apply. If the total amount due to the Employer exceeds any
payment due to the Contractor the difference shall be a debt payable to the
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought by
the contractor and available at site, the reasonable cost of removal of equipment,
repatriation of the Contractor’s personnel employed solely on the works, and the
Contractor’s cost of protecting and securing the Works and less advance payment
received up to the date of the certificate, less other recoveries due in terms of the
contract and less taxes due to deducted at source as per applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because of
a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event entirely
outside the control of either the Employer or the Contractor the Engineer shall
certify that the Contract has been frustrated. The Contractor shall make the Site
safe and stop work as quickly as possible after receiving this certificate and shall
be paid for all work carried out before receiving it and for any work carried out
afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his
own arrangements for the engagement of all staff and labour, local or other, and
for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a
return in detail, in such form and at such intervals as the Engineer may prescribe,
showing the staff and the numbers of the several classes of labour from time to
time employed by the Contractor on the site and such other information as the
Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor shall
abide at all times by all existing labour enactments and rules made thereunder,
regulations, notification and bye laws of the State or central Government or local
authority and any other labour law (including rules), regulations, bye laws that
may be passed or notifications that may be issued under any labour law in future
either by the State or the Central Government or the local authority. Salient
features of some of the major labour laws that are applicable to the construction
industry are given below. The Contractor shall keep the Employer indemnified in
case any action is taken against the Employer by the competent authority on
account of contravention of any of the provisions of any Act or rules made there
under, regulations or notifications including amendments. If the Employer is
caused to pay or reimburse, such amounts as may be necessary to cause or
observe, or for observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the
Contractor, the Engineer/employer shall have the right to deduct any money due
to the Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the Contractor any
sum required or estimated to be required for making good the loss or damage
suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923:- The Act provides for compensation in case of
injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972:- Gratuity is payable to an employee under the Act on
satisfaction of certain conditions on separation if an employee has completed 5 years
service or more on death, the rate of 15 days wages for every completed year of
service. The Act is applicable to all establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:-The Act Provides for monthly
contributions by the employerplus workers @ 10% or 8.33% The benefits payable
under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other benefits to
women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970: The Act provides for certain
welfare measures to be provided by the Contractor to contract labour and in case the
Contractor fails to provide, the same are required to be provided, by the Principal
Employer by Law. The principal Employer is required to take Certificate of
Registration and the Contractor is required to take license from the designated
Officer. The Act is applicable to the establishments or Contractor of Principal
Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :-The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if the
employment is a scheduled employment. Construction of Building, Roads, Runways
are scheduled employment.
G) Payments of wages Act 1936:-It lays down as to by what date the wages are to be
paid, when it will be paid and what deductions can be made from the wages of the
H) Equal remunerations Act 1979 :- The Act provides for payment of equal wages for
work of equal nature to Male and Female workers and for not making discrimination
against female employees in the matter of transfer, training and promotions etc.
I) Payments of Bonus Act 1965:- The Act is applicable to all establishments employing
20 or more employees. The Act provides for payments of annual bonus subject to a
minimum of 8.33% of wages and maximum of 20 % of wages to employees drawing
Rs. 3500/- per month or less. The bonus to be paid to employees getting Rs, 2500/-
per month or above Rs. 3500/- per month shall be
workedoutbytakingwagesasRs.2500/-per month only. The Act does not apply to
certain establishments. The newly set-up establishments are exempted for five years in
certain circumstances. Some of the State Governments have reduced the employment size
from 20 to 10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and procedure for
resolutions of Industrial disputes, in what situations a strike or lock-out becomes
illegal and what are the requirements for laying off or retrenching the employees or
closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by
some of the State and Central Government to 50). The Act provides for laying down
rules governing the conditions of employment by the Employer onmatters provided
in the Act and get the same certified by the designated Authority.
L) Trade Unions Act 1926:-The Act lays the procedure for registration of trade unions
of workmen and employers. The Trade Unions registered under the Act have given
certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :-The Act prohibits employment of
children below 14 years of age in certain occupations andprocess and provides for
regulation of employment of children in all other occupations andprocesses.
Employment ofChildlabour isprohibitedin Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditionsof
service) Act 1979:-The Act is applicable to an establishment which employs 5 or
more inter-state migrant workmen through an intermediary (who has recruited
workmen in one state for employment in the establishment situated in another
state).The inter-state migrant workmen, is an establishment to which this Act
becomes applicable, are required to be provided certain facilities such as housing,
medical aid, traveling expenses from home upto the establishment and back, etc.
O) The Building and Other Construction workers(Regulation of employment and
Conditions of Service) Act 1996 and the Cess Act of 1996:-All the establishments
who carry on any building or other constructions work and employ 10 or more
workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of the
cost of construction as may be modified by the government. The Employer of the
establishment is required to provide safety measures at the Building or construction
work and other welfare measures, such as canteens, First Aid facilities, Ambulance,
Housing accommodations for workers near the workplace etc. The Employer to
whom the Act applies has to obtain a registration certificate from the Registering
Officers appointed by the Government.
P) Factories Act 1948 :-The Act lays down the procedure for approval of plans before
setting up a factory, health and safety provisions, welfare provisions, working hours,
annual earned leave and rendering information regarding accidents or dangerous
occurrences to designated authorities. It is applicable to premises employing
persons or more with aid of power or 20 or more persons without the aid of power
engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from time
to time shall be applicable.
1. Water(Preservation and control of Pollution)Act,1974
2. Air(Prevention and Control of Pollution Act1981
3. Environmental(Protection)Act1986
The contractor must commit to adopting Environmental management plan for
best energy use, waste management, the reduction of pollution as in EMS
(Environmental Management system)ISO-14001-
65. ARBITRATION (GCCClause24)
The procedure for arbitration will be as follows:-
Note: - For ARBITRATION, as per AMC Circular No.,02 date:24/09/2024 and all latest Circular
shall be applicable. (Arbitration process will be applicable as per AMC latest Circular)
1. For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the The Deputy Commissioner, AMC, both the parties have to
refer to the The Deputy Commissioner, AMCconcerned for the
conciliationprocess.
2. For the work more than Rs.100 Cr., if any of the parties is not satisfiedwith the
decision of The Deputy Commissioner, AMC, both parties have to refer to the
The Deputy Commissioner, AMC for the conciliation process.
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract Dispute
Arbitration Tribunal. If the Contract or fails to refer a claim / dispute to the
Higher Authority within 14 days of the notification of the Engineer's decision,
the Contractor shall not be entitled to any additional payment/claim if he
doesn’t follow the above sequence in stipulated time. However, during such
period, he would not stop the work in any case.
SPECIAL CONDITION OF CONTRACT
It is possible that AMC may possess short length of road then agency has to work for that
road immediately and agency will not claim financial or any other related matters.
The said construction of road project work will be done in AMC area only, So agency has to
deploy all their machineries and labour full time for mentioned contract period in tender
and agency will not claim any financial matter.
The agency shall consider above mentioned all conditions for road project and they shall
calculate their all financial expenditure and other expenses and then only quote in price
bid. The agency will not claim any other financial matter apart from quoted price bid.
Contractor shall provide Site office for supervision and quality control of CC Road Work
including one working laptop & one working A3 printer.
Contractor has to provide latest model One Laptop having I-11, 10th generation processor
with 16 GB RAM, 256 GB SSD +1TB Hard Drive & 4 GB Video Graphic card with latest
Windows Home Plus facility of HP/Dell/Apple with one all in one Canon Colour Printer for
exclusive use of AMC staff contractor has to be provided it within 10 days from date of
work order otherwise penalty Rs.1000/- per day. Contractor should also provide Freeman’s
Engineering chain of 30 meter length (2 nos.) and 50 meter length (2 nos.) within 10 days
from date of work order.(b)Contractor has to provide latest model of 1 nos. of One plus or
I-phone or pixel mobile with 8 GB RAM & 512 GB internal memory for exclusive use of
AMC staff. contractor has to be provided it within 10 days from date of work order
otherwise penalty Rs.1000/- per day.
CCRS Complaint & Emergency Road Repair Response:
The Contractor shall appoint one zone-wise coordinator for each ward/zone/project
immediately upon receipt of the work order for road repair/pothole repair/patch work.
The said coordinator shall be deployed full-time and shall coordinate with the Engineer-
in-Charge/department staff to attend all CCRS complaints immediately as per
If the Contractor fails to attend any complaint as per Engineer-in-Charge
instructions/CCRS complaint timelines, the Engineer-in-Charge shall impose heavy
penalties as decided by the Competent Authority.
Further, the Contractor shall be solely responsible for any accident/damage occurring
due to unattended potholes/defects, and shall bear all liabilities, claims, and legal
consequences arising therefrom.
Name of work- Supply and Laying of Ready-Mix Cementitious Material for Patch Work
& Ready-Mix Grout Material at different Roads of Different ward of South West Zone
આપવાની રહશે. ખોટ િવગતો આપવા બદલ યાને આવેતો રુ ં ત ઇ રદારને ગેરલાયક ઠરવી EMD ત કર ુ ીનો િનણય
EPF બોનસ, ૂકવવા ુ ં રહશે તથા તે ુ ાવા ર ૂ કરવાના રહશે.
ગણવામાં આવશે. તેમજ ડફ ટ લાઇબીલીટ િપર યડ દરિમયાન Monthly Inspection Reportઅ ેનીકચેર માં ર ુ કરવાનો રહશેન હતો
(૨૧)પાટનરશ પ ફોમ ક સામાંPOAર ુ કરવાનોરહશે.
બદલે પહલા The Gujarat Public Work Contracts Dispute Arbitration Tribunal Act, 1992. માણે કાયવાહ કરવાની રહશે.
(૨૩)સદરટ ડરનીરકમનાભાવ GST વગરનાલેવામાંઆવેલછે . GST અલગથી ૂકવવામાંઆવશે. બાબત યાનમાંલઈને ટ ડરનાભાવભરવાનારહશે.
દઠ (For Every Incident)ભરવાનીરહશે.
ReferenceWith respect To
Item marked“N/A”do notapplytothis Contract.Clause
1. The Employersis [CL.1.1]
Name: Ahmedabad Municipal Corporation
(AMC), Ahmedabad
Address: Municipal Commissioner, Ahmedabad
Municipal Corporation (AMC), Ahmedabad
Name of authorized Representative (will
beintimated later)
2. The Engineeris………………………
Name of Authorized Representative
(Additional City Engineer, AMC)
3. The Defects Liability Periodis 03 (Three)years [CL.1.1&33]
from the date of completion.
4. TheStartDateshallbe1stdays for the date of [CL.1.1]
issue of the Notice to proceed with the
5. The Intended Completion Date for the whole [CL.1.1,17&2]
of the works is
12 Months after start of work with the
following mile stones:
Mile stone dates: [CL.2.2&49.1]
Physical works to be completed
Period from the start date
Milestone 1 i.e. 10 %36days.
Milestone2i.e. 40 %144days.
Milestone3i.e. 80 %288days.
Milestone4i.e. 100 %360days.
6. The Site is located at AHMEDABAD [CL.1.1]
7. The name and identification number of the [CL.1.1]
Contractis: Supply and Laying of Ready-Mix
Cementitious Material for Patch Work &
Ready-Mix Grout Material at different Roads
of Different ward of South West Zone of AMC
(ARC)- Annual Rates for Year 2025-26
8. The works consist of Patching Works with [CL.1.1]
items as per B.O.Q. The works shall, interalia,
include the following ,as Specified or as
(A) Road Works:
all aspects of quality assurance of various
components of the works; rectification of The
defects in the completed works during the
Defects Liability Period; submission of“As-built’’
drawings and any other related documents; and
other item of work as may be required to be
carried out for completing the work in accordance
with the drawings and the provisions of the
contract and to ensure safety.
AnyOtherItemsasrequiredtofulfillallcontractualoblig
ationsaspertheBid documents.
10. The following documents also form part of [CL.2.3(9)]
11 The law which applies to the Contract is the law [CL.3.1]
TheUnion of India
language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial [CL.7.1]
14. The Priceof Other Contractors
Schedule [CL.8]
15. The Schedule of Key Personnel as per Annex – II [CL.9]
minimum insurance cover for physical [CL13]
property, injury and death is Rs. 5 lakhs per
occurrence with the number of occurrences
limited to four. After each occurrence, the
contractor will pay an additional premium
necessary to make insurance valid for four
occurrences always.
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be from the issue [CL.21]
19. The of work
period for order
submission of programme for [CL. 27.1]
approval of the engineer shall be 21 days from
20. The ofbetween
period Letter of program
updates will be 30 [CL.27.3]
21. The amount to be withheld for late submission of an [CL.27.3]
updated programme Shall be Rs. 0.10 lakhs per days
22. The currency of the Contract is Indian Rupees [CL. 46]
23. The formula (e) for adjustment of prices are as under: • If [CL.47]
any of the commodities like Cement, Steel or Bitumen are
not found applicable in a work, the weight component of
that commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or
‘Bitumen' (Pb) as indicated in SBD for the purpose of Price
Adjustment} shall be clubbed with the weight component
of ‘Other Material’ (Pm), such that the gross % weight of
the components shall remain as 100%.
R = value of work as defined in Clause 47.1 of Conditions of
Adjustmentfor labourcomponent
(i) Priceadjustmentforincreaseordecreaseinthecostdueto labourshallbe paidin accordancewiththe
followingformula:
VL= Increase or decrease in the cost of work during the
monthunderconsiderationduetochangesinratesfor local labour
L0 = Theconsumerpriceindexforindustrialworkersforthe State on 28 days preceding the scheduled date
of opening oftechnical BidsaspublishedbyLabour Bureau, MinistryofLabour,GovernmentofIndia
Li= The consumerpriceindexforindustrialworkersforthe Stateforthemonth
underconsiderationaspublishedby theLabourBureau,MinistryofLabour,Governmentof India.
Pl = Percentage of labor component of the work.
Adjustmentfor Asphalt component
(ii) Pricesadjustmentforincreaseordecreaseinthecostof cementprocuredbythecontractor
Vc= 0.85x(Pc/100)xRx(Ci– C0)/C0
Vc= Increase or decrease in the cost of work during the month under consideration due to changes in
rates for cement.
C0 = The all-India wholesale price index for Ordinary Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry of Commerce & Industry.
Ci = The all-India average wholesale price index for Ordinary Portland Cement for the month under
consideration as published by Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustmentfor steelcomponent
(iii) Priceadjustmentforincreaseordecreaseinthecostofsteelprocuredbythe contractorshallbe
paidinaccordancewiththe followingformula
Vs= Increaseordecrease inthecostofworkduringthemonthunder considerationdueto changesinthe
So= The all-India wholesale price index for steel (Mild Steel - Long Products
Rebars)on28daysprecedingthedateofopeningofBidsaspublishedbythe OfficeoftheEconomic
Adviser,DepartmentforPromotionofIndustryand InternalTrade,MinistryofCommerce &Industry.
Si= Theall-Indiaaveragewholesale priceindexforsteel(MildSteel-Long Products Rebars) for the month
under consideration as published by OfficeoftheEconomic
Adviser,DepartmentforPromotionofIndustryand InternalTrade,MinistryofCommerce &Industry.
Ps = Percentageofsteelcomponentofthe work
Note:Forthe applicationofthisclause,the indexofMild Steel- Long
productsRebarshasbeenchosento representthe steel group.
Adjustmentsofbitumencomponent
(iv) Priceadjustmentforincreaseinthecostofbitumenshallbepaidin accordancewiththe
followingformula
Vb = Increase or decrease in the cost of work during the month under consideration due to changes in
rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest centre on the day 28 days
prior to the scheduled date of opening of technical bid.
Bi = The official retail price of bitumen of IOC depot at the nearest centre for the 15th day of the
month under consideration.
Pb = Percentageofbitumencomponentofthework
AdjustmentofPOL(fueland lubricant)component
(v) Priceadjustmentforincreaseordecrease incostofPOL(fueland lubricant)shallbe
paidinaccordancewiththe followingformula
Vf = Increase or decrease in the cost of work during the month under consideration due to changes in
rates for fuel and lubricants.
Fo = The official retail price of High-Speed Diesel (HSD) at the existing consumer pumps of IOC at the
nearest centre on the day 28 prior to the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of IOC at the nearest centre for
the 15th day of the month of the under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note:Fortheapplicationofthisclause,thepriceofHigh-Speed dieselOilhas beenchosento representthe
fuelandlubricantsgroup.
Adjustment for cement component
(i) Prices adjustment for increase or decrease in the cost of cement procured by the contractor
Vc = Increase or decrease in the cost of work during the month under consideration due to changes in
rates for cement.
C0 = The all-India wholesale price index for Ordinary Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry of Commerce & Industry.
Ci = The all-India average wholesale price index for Ordinary Portland Cement for the month under
consideration as published by Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustmentofothermaterials Component
(vi) Priceadjustmentforincreaseordecreaseincostoflocalmaterials
otherthancement,steel,bitumenandPOLprocured bythecontractor shallbe
paidinaccordancewiththe followingformula
Vm = Increaseordecreaseinthecostofworkduringthemonthunder consideration
duetochangeinratesforlocalmaterialsotherthan cement,steel, bitumenandPOL.
M0= TheAll- I n d i a n wholesalepriceindex(allcommodities)on28 daysprecedingthescheduled
dateofopeningoftechnicalBids,as published bytheOfficeoftheEconomicAdviser,Department for
PromotionofIndustryandInternalTrade,MinistryofCommerce &Industry.
Mi= TheAll-Indiawholesalepriceindex(allcommodities) forthe month under consideration as published
by the Office of the Economic Adviser, Department forPromotionofIndustry and
InternalTrade,MinistryofCommerce&Industry.
Pm = Percentageoflocalmaterial components(otherthan cement, steel, bitumenandPOL)ofthe work.
Thefollowing percentage willgovern thepriceadjustmentforthe entirecontract:
1. Labour-Pl 39.65%
2. Cement– Pc 6.88%
3. Steel - Ps 28.94%
4. Bitumen– Pb 2.18%
5. POL– Pf 7.24%
6. OtherMaterials– Pm 15.11%
24. The proportion of payments retained {CL.48}
(retentionmoney)shall be 6%from each bill
subject to a maximum of 5% of final contract
25. Amount of Liquidated damages for delay ForWholeofwork(1/2000) {CL. 49}
in completion of works ofthe Initial contract
price,roundedoffto the
Thousand,perday.
Completion(whereverspe
6ofContractdata)(1/2000
contractpricefor5km
Section,roundedoffto the
nearest thousandperday.
26. Maximum limit of liquidated damages For 10 percent of the Initial {CL. 49}
delay in completion work Contract Price rounded
off to the nearest
27. Amount of Bonus for early completion Amount of bonus for
early completion of work
shall be given as per
CL.50 of Section-3
28. Maximum limit of bonus for early 5 percent of the Contract {CL. 50}
Completion of work Price
29. The amount of the advance payment are: {CL.51 & 52}
Nature of Advances Amount(Rs.)ConditionstoBe fulfilled
i. Mobilization Deleted
ii. Equipment Deleted
iii. Secured Advance for Non-persish able Deleted
material Brought to site
(TheadvancepaymentwillbepaidtotheContractornolaterthan28daysafter fulfillmentofthe
aboveconditions).
Repaymentofadvancepaymentfor {CL.51.3}
mobilizationandequipment
Theadvanceloanshallberepaidwithpercentagededuct
ionfromtheinterim payments certified by the
Engineer under the Contract. Deduction shall
commenceinthenextInterimPaymentCertificatefollo
wingthatinwhichthe
totalofallsuchpaymentstotheContractorhasreached
notlessthan20percent oftheContractPrice
or6(six)monthsfromthedateofpaymentoffirst
installmentofadvance,whichever period
concludesearlier,andshallbemadeat
therateof20percent(collectively
forbothMobilizationAdvance and
EquipmentAdvance)oftheamountsofallInterimPaym
entCertificateuntil
suchtimeastheloanhasbeenrepaid,alwaysprovidedth
attheloanshall be completelyrepaidpriortothe
expiryof theoriginaltimeforcompletionpursuant to
32. The securities shall be for the following minimum {CL.52}
amounts equivalent
As a percentage of the Contract Price:
Performance Security for 5 percent of contract
price plus Rs.…………….. (to be decided after
evaluation of the bid) as additional security in
terms of ITB Clause
The standard form of Performance security
acceptable to the Employer shall be an
unconditional Bank Guarantee of the type as
presented in Section 8 of the Bidding Documents.
33. The Schedule of Operating and maintenance {CL.58}
34. The date by which “as– built” drawings (in scale as {CL.58}
directed) in 2 sets are required within 28 days of
the issue of certificate of completion of the whole
or section of the work, as the case may be.
35. The amount to be withheld for failing to supply “as {CL.58}
built” drawings by the Date required is Rs.
36. The following events shall also be fundamentals {CL.59.2}
breach of contract: “The Contractor has
contravened Sub- clause 7.1 and Clause 9 of GCC”
37. The percentage to apply the value of the work not {CL.60}
completed representing the Employer’s additional
cost for completing the Works shall be 20 per cent.
TECHNICAL SPECIFICATION
(AS PER SEPARATE SHEET ATTACHED)
TECHNICAL SPECIFICATIONS
AHMEDABAD MU NICIPAL COR POR ATION EN GINEER DEPAR TME NT (A.M.C)
TECHNICAL SPECIFICATIONS
Name of Work: - Supply and Laying of Ready-Mix Cementitious Material for Patch Work & Ready-Mix
Grout Material at different Roads of Different ward of South West Zone of AMC (ARC)
QUICKSEAL CEMENTITIOUS GROUT MATERIAL SPECIFICATION AND APPLICATION PROCEDURE
Specification - Quick seal Cementitious grout material should be having such properties that it would
Adheres effectively even to moist surfaces, Gains strength over time, becoming increasingly durable and
seal the road surface, Hard, Consistent & Impermeable solution, Can be applied directly without the
need for pre-cleaning, Does not require any additional coating, Make wearing surface water proof,
Economic & environmentally friendly solution, No need of post curing, Reflect the sunlight and reduce
wearing surface temperature, Increase the service life of the Road , It is economical alternate than other
Application - Quick seal Cementitious grout material on Cleaned Wearing course and spread by appropriate
procedure Application of cementitious grout can be done manually or by mechanical means over the
high voids bituminous / concrete surface. Sweeping / Squeezing or other such simple techniques can be
adopted for this purpose. The applied grout should be able to automatically flow into the voids of the
bituminous / concrete surface under the effect of gravity alone. If required the edges of the bituminous
/ concrete layer should necessarily be covered with any suitable material like fly ash to restrict the
outflow of the grout slurry. To improve the surface roughness, the grouted surface can be
mechanically/manually broomed to create texture on the surface to penetrate in the voids and Grout
mix is allowed to set for 1 hour.
Technical Specification of CGM
Test Method Standard Specification
Properties of Grout Material
1 Initial Setting Time IS 4031 Part 5 4 - 5 Hrs
2 Final Setting Time IS 4031 Part 5 6 - 10 Hrs
Characteristic ASTM C109 40 N/mm2
3 Compressive (size 50*50*50 mm)
Strength @28 days
4 Flexural strength at IS
size- 5 - 7 N/mm2
5 Fluidity ASTM C 939 ASTM C 939 20 - 50 Sec
B CGM Composite
1 Voids in CGM @ 7 ASTM D3203 2-3%
2 Full depth grouting Visual 97 - 100 %
Compressive ASTM C39
3 strength at 28 days (100mm dia. & 200 >5 N/mm2
Resilient Modulus @ ASTM D4123 For design purpose,
4 28 days,35°C Resilient Modulus
value can be taken as
5 Flexural strength @ ASTM
size min.2.0 N/mm2
Marshal Stability @ ASTM D6927 min. 60 kN (Pl check
6 28 days, 60°C this value)
Indirect tensile
7 strength @28 days, ASTM D6931 min.1.0 N/mm2
8 Retained ITS AASHTO T283 97%
strength at 28 days
30 mm for traffic up
40-50 mm for traffic
9 CGM layer 30 mm for renewal
thickness coat if
designed traffic is
30 MSA till next
After 24 hrs for light
10 Opening to traffic -- Requirement can be
>50 BPN in Wet &
11 Skid resistance ASTM E303 >60 BPN in Dry
12 Permeability IS 2645 0.00 m/sec
QUICKFIX POT HOLE REPAIR MATERIAL SPECIFICATION AND APPLICATION PROCEDURE
Specification -
Quick fix pot hole repair solution should have properties that it would Adheres effectively even to moist
surfaces, Forms a monolithic bond with all existing particles within the pothole, Gains strength over
time, becoming increasingly durable, Hard, Consistent & Impermeable solution, Can be applied directly
without the need for pre-cleaning, Does not require any additional coating, such as tack or prime
coat,Bonds well with the existing road surface, Economic & environmentally friendly solution.
Application Procedure-
Pour the Pot Holes or Patch location by QUICKFIX REPAIR SOLUTIONSY mixed with Coarse Aggregate of 10 mm
down size to the prepared Area having each layer of 100 mm thickness by using trowels or Shovel.
Each layer of 100 mm thickness of Mix Material must be achieved by proper ramming by hand Rammer or
Vibratory mechanical rammer.
It is recommended to fill the pot holes of 100 mm thick each layers up to the road level within 25 minutes of
pouring. Then Level the surface by towel.
Technical Specification of Pothole Material
Sr.No. Name of Test
A Properties of Pothole Material Test Method Standard Specification
1 Initial Setting Time of Material IS 4031 Part 5 30 Minute
2 Final Setting Time of Material IS 4031 Part 5 4 Hrs
Characteristic ASTM C109 40 N/mm2
3 Compressive (size 50*50*50 mm)
Strength @28 days
4 Flexural strength at IS
size- 5 - 7 N/mm2
B Pothole Material Composite
Determination of Initial Setting
1 Time IS 8142 30 Minute.
Concrete by Penetration
Determination of Final Setting
2 Time IS 8142 4 Hrs.
Concrete by Penetration
Characteristic ASTM C109 40-60 N/mm2
3 Compressive (size 150*150*150 mm)
Strength @28 days
4 Flexural strength at IS
size- 4.5 - 5 N/mm2
4 Resilient Modulus @ ASTM D4123 design purpose, Resilient
28 days,35°C Modulus value can be
taken as 5000 N/mm2.
5 Resilient Modulus @ ASTM D4124 design purpose, Resilient
28 days,35°C Modulus value can be
taken as 5000 N/mm2.
6 Permeability IS 3085 0.00 m/sec
7 Drying - Shrinkage IS 516-P-6
Mode of measurement
Measurement shall be given in Kg. Basis.
Tender Condition for Use of Ready-Mix Cementitious & Grout Materials with Specialized Equipment
1. Use of Materials
For patch repair works, only ready-mix cementitious material as specified in the Tende shall be used.
For grouting works, only ready-mix grout material as specified in the Tender shall be used.
2. Use of Specialized Equipment
The above materials shall be applied strictly through a specialized spraying/grouting machine designed
for achieving uniform application, required bonding strength, and durability.
The specialized machine shall be procured only from the Original Technology Developer/Authorized
Supplier specified in the DPR.
Use of locally fabricated, hired, or modified equipment shall not be permitted under any circumstances.
3. Pre-Condition for Bidding
If the contractor does not already own the specialized machine required for the above works, it shall be
mandatory to furnish, along with the bid, a copy of the confirmed work order/advance purchase order
placed with the Original Technology Developer/Authorized Supplier for procurement of the specialized
Bids submitted without such documentary proof shall be treated as non-responsive and liable for
4. Costs and Responsibility
The cost of procurement, operation, and maintenance of the machine shall be borne entirely by the
contractor and shall be deemed to be included in the quoted rates.
Prior to commencement of work, the contractor shall furnish proof of receipt/installation of the
machine along with any relevant training or commissioning certificate issued by the Original Technology
Developer/Authorized Supplier.
5. The contractor shall also provide Material Test Certificates(MTC) of propsed material form any NABL
accredited laboratory, Material Performance reports or test data of the proposed material issued by any
Public Sector Undertaking(PSU) or Government Body/Department or any other supporting technical
documentation related to the tender.
Contractor’s Signature Add. city Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
Contractor shall register the work to Labour commissioner as per Labour act.
Contractor shall not sub-let the work without permission of the authority
Contractor should have sufficient skilled and unskilled laborers so that he shall start work at different
sites simultaneously. Contractor's having Labour force available during festivals shall only apply.
Contractor cannot stop the work due to on availably of Labour force. In case progress is delayed,
contractor shall be penalized 0.1% of Tender amount per day for work done after time limit, maximum
up to 10% for remaining work.
Material rate difference will be paid as per tender conditions, if applicable.
Advance payment / machinery advance will not be paid.
Payment of running bill will be made as per recent A.M.C policy in force.
No extra payment will be made due to increase of central / state Govt. Taxes.
If the work is not completed within time limit the penalty will be recovered from immediate bills of
If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor
shall not claim for any extra rate for non-execution of such item, partly/fully.
In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by the
Engineer-in-charge.
Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean as a
reference to the latest edition of the same in force on the date of agreement.
In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the
relevant Indian Standards shall be referred to.
All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
Length, width and depth (height)------- 0.01 Meter.
Areas -----0.01 Sq. Mt.
Cubic Contents ------0.01 Cu.Mt.
Weight – 0.100 kilogram
The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be taken
Where no lead is specified, it shall mean "all leads"
Lift shall be measured from plinth level.
Definite particulars covered in the items of work, though not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
Reference to specifications of materials as made in the detailed specification of the items of work is in
the form of a designation containing the number of the specification of the material and prefix 'M' e.g.
Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used in
the work found defective at a later date.
The contract rate of the item of work shall be for the work completed in all respects.
No collection of materials shall be made before it is got approved from the Engineer-in-charge.
Collection of approved materials shall be done at site of work in a systematic manner. Materials shall be
stone at site of work in a systematic manner. Materials shall be stored in such a manner as to prevent
damage, deterioration or intrusion of foreign matter and to-ensure the preservation of their quality and
fitness for the work.
Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site
of work within 24 hours.
No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers and
in good working condition on the site of the work.
All works shall be carried out in workmanlike manners per the best techniques for the particular item.
All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works during execution shall be kept in sufficient numbers and in good
working condition on the site of the work.
The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
All necessary safety measures and precaution (including those laid down in the various relevant Indian
Standards) shall be taken to ensure the safety of men, materials and machinery on the works as also of
the work itself.
The testing charges of all materials shall be borne by the Contractor unless recovery at one percent
towards testing charges is separately made.
The minimum quantity of work/material shall not be less than 1 metric ton.
INSTRUCTION TO TENDERERS TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days
(120) from opening of price bids. SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to the
Corporation Security Deposit of 5% (five percent) of the contract price cheque or Bank Guarantee, pay
order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (A.M.C)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Month after the order to start the works. Progress of work should be
in proportion to time limit.
The contractor shall remain responsible for Workmen’s compensation if any accident. The contractor
shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be
responsible for any damage to public. If any incident happens, during the execution of work. In case of
dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The
contractor shall have to give site clean of all rubbish during the work and at the time of completion of
work and hand over the site with final finishing of the work as directed. All the rejected materials shall
be removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is
not available in SOR than based on current market rates. In case of extra item decision of Add. City Engg.
shall remain final regarding rate.
If in the interest of the Ahmedabad Municipal Corporation it is necessary to change either any site or the
design of the propose work the contractor shall carry out the same at his quoted rates without charges
any extra and the contractor will have to carry out the works and he will be paid at the rate quoted by
him. No claim for extra rate for subsequent changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraws or makes any modifications or addition in the terms
and conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation
shall without prejudice to any right or remedy be at liberty to forfeit in full, they said earnest money and
black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the
penalty of Rs. - (As per Form - B1) per day of delay shall be recovered from the immediate bills payable
to the contractor. Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully: -
Conditional tender shall not be accepted.
All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand
draft or in cash.
Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1
can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of
Building Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (A.M.C)
Name of Work: - Supply and Laying of Ready-Mix Cementitious Material for Patch Work & Ready-Mix
Grout Material at different Roads of Different ward of South West Zone of AMC (ARC)
The work shall be completed within 12 Month.
The contractor shall be remain responsible for Workmen’s compensation if any when such case occurs.
The contractor shall arrange formed iampasant night and fencing and pagi and shall be responsible for
any damage of life and limb or property if any happen, during the execution of work. In case of dispute
for unseen or overlooked items the decision of the city Engineer shall be final. The contractor shall have
to give site clean of all rubbish on completion of work and have over the building with final finishing of
the work as directed. All the rejected materials shall be removed from site within 24 hours by contractor
at this risk and cost.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case, he shall be
allowed to mix the mortar either on floor or any finished surfaces.
The contractor shall have to make his own arrangement for water required for the work and shall pay
the water charges as per water meter.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by C.E. as per the rate analysis based on current market rates.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose
work the contractor shall carry out the same at his quoted rates without charges any extra and the
contractor will have to carry out the works and he will be paid at the rate quoted by him and no claim
for extra for subsequent changes may be entertained.
Retetion money at the rate of 2% shall be deducted from every running bill of the contractor and which
will be paid at the time of final bill, for works costing More than Rs. 10-00 lakhs.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraws or makes any modifications (s) or addition (s) in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest
money absolutely.
As per Circular No. MCR 2176 (96) 2418 (ii) GHH dated 31-03-77 issued by Government of Gujarat
contractors are requested to produce their quarry materials for construction work through legal sources.
i.e. only form the quarry SABARMATI WARD - 14 - lease holders, permit holder or middle man who
satisfies the contractor as to the legality of the source of purchase by him on these materials.
Contractor has to make his own arrangement for procurement of steel and cement.
Conditional tender will not be accepted.
All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
Condition of form B1 Standard Specification of material & code of practice will be applicable. Form B1 &
B2 can be is available on website.
Contractor’s Signature Add. city Engineer
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein in
conformity with the conditions of Contract, specification, drawings, Bill of Quantities and
Addenda for the sum (s) of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably
possible after the receipt of the Engineer’s notice to commence, and to complete the
whole of the Works in the Contact within the time stated in the document.
3. We agree to abide by this Bid for the period of 120 Days from the date fixed for
receiving the same, and it shall remain binding upon it and may be accepted at any time
before the expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid, together with
your written acceptance thereof, shall constitute a binding contract betweenus.
5. We understand that you are not bound to accept the lowest or any tender you may
-------duly authorized to sign bids for and on behalf of-----------------------------------
(in block capitals or typed)
BILL OF QUANTITIES
(AS PER SEPARATE SHEET ATTACHED)
BILLOF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
aregivento provide a commonbasisforbidding. Thebasisofpayment willbethe actual
quantities of work ordered and carried out, as measured by the Contractor and
verified by the Engineer and valued at the rates and prices tendered in the priced Bill
of Quantities, where applicable, and otherwise at such rates and prices as the
Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in sofar as
it is otherwise provided under the Contract, include all constructionalplant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. TheratesandpricesshallbequotedentirelyinIndian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered
in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for
the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant sections
of the contract documentation shall be made before entering rates or prices against
each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for building
are to be followed.
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerrorspursuantto
Clause29oftheInstructionstoBidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor of
at least 150 kw with a single rear mounted heavy duty ripper.
BILLOF QUANTITIES
(A) Percentage Rate Tender(Up to INR 50Cr.)
Item Description of Item(with brief Quantity Unit Rate In Amount
No specification and reference to figures
book of specifications)
SEPARATE SHEET ATTACHED
I/We am/are willing to carry out the work at… ...................... %above/below percent(Should
be written in figures and words)of the estimated rate mentioned above. Amount of my/our tender
works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
Inwords Inwords
(B) ForItemRateTender(ForaboveINR50Cr.): (Separate Sheet Attached)
Item Description of Item Quantity Unit Rate Amount
No (withbriefspecification
andreferencetobookof In In
specifications) figures Words
SEPARATE SHEET ATTACHED
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)……………………………… (in
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 TheContractorshallexhibitaboardwithbriefdetailsofworkasdirectedbythe
Engineer-In-Chargeforwhichnoextrapaymentshallbe made.
2 Thelabourcesswillbedeductedasperprevailingrulesi.e. 1%oftheworkdone.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsofbills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.NO.:MIS102010/17/K1Dated:30/07/2018asstatedinS.O.R.thereforein
R.C.C.itemswherethereisachangeasperactualmixdesignthecostofdifferenceof
cementconsumptionhavebeendeductedfromtherateoforiginalitemattherateof input rate
mentioned in all the tender.
SECURITIES AND OTHER FORMS
BIDSECURITY(BANKGUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter called the “The
Bidder”) has submitted his bid Dated ------------------------ (Date) for the construction of ----
---------(Name of Contractor hereinafter called “the Bid”)
KNOWALL PEOPLE by these presents that We-------------------------------------------------
(name of Bank)of ---------------------------------------------------- (name of country)havingour
registered office at-------------------------------------------------------(here inafter called
“thebank”)are boundunto--------------------------------------------(name of Employer)
(herein after called “TheEmployer”)in the sum of --------------------------------------------------- *
for which payment well and truly to be made to the said Employer the Bank it self,his
successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this----------------------day of --------------
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid validity
specified in the Form of Bid;
(2) If the BidderhasbeennotifiedoftheacceptanceofhisbidbytheEmployer during the
period of Bid Validity:
A FailsorrefusestoexecutetheFormofAgreementinaccordancewiththe Instructions
to Bidders, if required; or
B.FailsorrefusetofurnishthePerformanceSecurity,inaccordancewiththe Instructions to
C.doesnotacceptthecorrectionoftheBidPricepursuanttoClause27 (Correction of Errors)
We undertake to pay to the Employer up to the above amount upon
receipt of his first written demand, without the employer having to substantiate his
demand, provided that in his demand the Employer will note that theamount
claimed by him is due to him owing to the occurrence of one or any of the three
conditions, specifying the occurred conditions or conditions.
This Guaranteewill remain inforce upto andincluding thedate ----------------------------- **
daysafter the deadline forsubmission of Bids as such the deadline isstated in the
Instructions to Bidders or as it may be extended by the Employer, notice of which
extension (s) to the Bank is hereby waived. Any demand in respect of this guarantee
should reach the Bank not later than the above date
(Signature,nameandaddress)
* The Bidder should insert the amount of the guarantee in words and figures
denominated in Indian Rupees. This figure should be the same as shown in Clause
16.1(Bid Security) of the Instructions to Bidders.
**45 days after the end of the validity period of the Bid. Date should beinserted by
the Employer before the Bidding documents are issued.
PERFORMANCESECURITY
contractor)(hereaftercalled“theContractor”)hasundertaken,inpursuanceofContracts No. -------
---------(nameofContractand briefdescriptionofWorks)(hereinaftercalled“The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractorshall furnish you with a Bank Guarantee bya recognizedbankfor the sum
specified therein as security for compliance with his obligation in accordance with the
ANDWHEREASwehaveagreedtogivetheContractorssuchabankGuarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to
youonbehalfoftheContractor,uptoatotalof------------------------------------------
(amountofguarantee)* ---------------------------------- (inwords),suchsumbeingpayablein
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you, upon your first written demand and without cavil orargument, any
sum or sums within the limits of ---------------------------------------- (amount of guarantee) as
aforesaid without your needing to prove or to show grounds or reasons for your demand
for the sum specified therein.
Weherebywaive thenecessityofyourdemandingthe saiddebtfromthecontractor before
presenting is with the demand.
We further agree that no change or addition to or other modification of the terms of the
Contract to of the Works to be performed thereunder or of any of the Contract
documents which may be made between your and the Contractor shall in any way
release us from any liability under this guarantee, and we hereby waive notice of any
such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of the Defect
Liabilities period.
SignatureandSealoftheguarantor----------------------------- Name of
*An amount shall be inserted by the Guarantor, representing the percentage the Contract
price specified in the Contract denominated in Indian Rupees.
ADDITIONALPERFORMANCESECURITY
[Clause34.1.(A)]
contractor)(hereaftercalled“TheContractor”)hasundertaken,inpursuanceof Contracts No. ------
--------- (Name of Contract and briefdescription of Works) (hereinafter called “TheContract”)
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractorshall furnish you with a BankGuarantee bya recognizedbankfor the sum
specified therein as security for compliance with his obligation in accordance with the
ANDWHEREASwehaveagreedtogivetheContractorssuchabankGuarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to
youonbehalfoftheContractor,uptoatotalof------------------------------------------
(amountofguarantee) ---------------------------------- (inwords),suchsumbeingpayablein
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you, upon your first written demand and without cavil orargument, any
sum or sums within the limits of ---------------------------------------- (amount of guarantee) as
aforesaid without your needing to prove or to show grounds or reasons for your demand
for the sum specified therein.
We herebywaive thenecessityofyourdemandingthe saiddebtfromthe contractor before
presenting is with the demand
We further agree that no change or addition to or other modification of the terms of the
Contract to of the Works to be performed thereunder or of any of the Contract
documents which may be made between your and the Contractor shall in any way
release us from any liability under this guarantee, and we hereby waive noticeof any such
charge, addition or modifications.
Thisguaranteeshallbevaliduntil28daysfromtheprojectcompletion date.
SignatureandSealoftheguarantor----------------------------- Name of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SWZ_Ready Mix_Ashphalt_Tender Vol-1 17.06.26.pdf
SWZ_Ready Mix_Ashphalt_Tender Vol-2 17.06.26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .