Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | 33KV COMPLETE POLE ASSEMBLY AREVA | S R D ENGINEERS | 3 | ₹10.9 L |
| 2 | 33KV COMPLETE POLE ASSEMBLY BHEL | S R D ENGINEERS | 3 | ₹65.7 L |
| 3 | 33KV COMPLETE POLE ASSEMBLY MEGAWIN | SRI GOWRI SHANKAR SWITCH GEARS COMPANY | 3 | ₹5.7 L |
| 4 | 33KV COMPLETE POLE ASSEMBLY TOSHIBA | S R D ENGINEERS | 3 | ₹5.9 L |
| 5 | 33KV INSULATION DRIVE ROD | SRI GOWRI SHANKAR SWITCH GEARS COMPANY | 3 | ₹5.9 L |
Tender Value
Refer Docs
Closing Date
21 Nov 2025, 12:00 amClosed
EASTERN POWER DISTRIBUTION COMPANY OF A.P LIMITED
21/11/2025
866603
EPMPT-85/25-26
Various types of spares suitable for 33KV VCBs
Andhra Pradesh
30 Aug 2026
21 Nov 2025
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .