| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-AOC POLICE LINE ROAD KUMOUR PITHORAGARH | ₹14.6 L | L1 | Accepted-AOC Overall accepted as L1 bidder |
| 2 | L2₹15.2 LRejected-Finance BEHIND NIRMALA CONVENT SCHOOL CANAL ROAD KATHGODAM | ALMORA | UTTARAKHAND | 263601 | ₹15.2 L | L2 | Rejected-Finance Overall disqualifies |
| 3 | Rejected-Technical | - | - | Rejected-Technical The bidder did not qualifies TQR and FQR |
| Sl No | Description | Qty | Unit | Saun Engineering and Construction Co P Ltd L1 | M/S BHATT ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
(a) 132KV S/s, Almora - 10000 Sqmt x Four times = 40000 Sqmt.
(b) 132KV S/s, Ranikhet - 3500 Sqmt x Four times = 14000 Sqmt. | 54,000 | Sqmt. | 9,45,000 ₹11.2 L | 9,47,700 ₹11.2 L |
| 2.00 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
(a) 132KV S/s, Almora - 5000 Sqmt x Four times = 20000 Sqmt.
(b) 132KV S/s, Ranikhet - 1000 Sqmt x Four times = 4000 Sqmt. | 24,000 | Sqmt. | 2,28,000 ₹2.7 L | 2,64,000 ₹3.1 L |
| 3.00 | Cleaning of cable trenches,Trench cover and drains after removing the trench cover and then cleaning of mud, stone brick etc and accumulate the material outside from Switchyard approx.50 mtr. far then putting the same trench cover on proper places.
(a) 132KV S/s, Almora - 672 Rmt x Four times = 2688 Rmt.
(b) 132KV S/s, Ranikhet - 300 Rmt x Four times = 1200 Rmt. | 3,888 | Rmt. | 2,89,656 ₹3.4 L | 3,11,040 ₹3.7 L |
Tender Value
Refer Docs
EMD Value
₹52,000
Closing Date
29 Dec 2025, 5:00 pmClosed
Chief Engineer
Office of CE(OandM), PTCUL, Haldwani
Cutting of wild bushes and grass nearby switchyard and boundary of substation campus and cleaning of cable trenches at 132KV S/s, Almora and 132KV S/s, Ranikhet under OandM Division, PTCUL, Almora
2025_PTC21_89308_1
CE/OandM/PTCUL/HLD/23/2025-26
Open Tender
Civil Works - Others
365 days
132KV S/s, Almora and 132KV S/s, Ranikhet
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
EE, OandM Division, PTCUL, Almora
₹52,000
Office of CE(OandM), PTCUL, Haldwani
21 Feb 2026
29 Nov 2025
30 Dec 2025
29 Nov 2025
29 Dec 2025
29 Nov 2025
15 Dec 2025
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (a) 132KV S/s, Almora - 10000 Sqmt x Four times = 40000 Sqmt. (b) 132KV S/s, Ranikhet - 3500 Sqmt x Four times = 14000 Sqmt.
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. (a) 132KV S/s, Almora - 5000 Sqmt x Four times = 20000 Sqmt. (b) 132KV S/s, Ranikhet - 1000 Sqmt x Four times = 4000 Sqmt.
Cleaning of cable trenches,Trench cover and drains after removing the trench cover and then cleaning of mud, stone brick etc and accumulate the material outside from Switchyard approx.50 mtr. far then putting the same trench cover on proper places. (a) 132KV S/s, Almora - 672 Rmt x Four times = 2688 Rmt. (b) 132KV S/s, Ranikhet - 300 Rmt x Four times = 1200 Rmt.
M/S BHATT ENTERPRISES (BID ID -412079)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
TenderDocument23.pdf
Tender Documents • 1.19 MB
PQRSheet23.xls
Other Document • 0.14 MB
BOQ_105929.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid