Loading…
Loading…
Tender ID
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
23 Apr 2026, 6:00 pmClosed
Executive Engineer Panchayat (R&B) Division, Junagadh
Construction of Bhindora to Vadasada Road (NP) Km.0/00 - 4/800 Ta.Manavadar Dist.; Junagadh. (Under MMGSY-Normal-New Road Construction-2020-21) (11th Attempt)
295581
29/2025-26 Sr.No.3
Open
Civil Works - Roads
Works
Junagadh
8 documents required · 7 mandatory · 1 optional
₹3,600
DD in favour of Executive Engineer, Panchayat R&B Division - Junagadh
₹3.0 L
9 Apr 2026
9 Apr 2026
9 Apr 2026
23 Apr 2026
13 Apr 2026
Name of work :- Construction of Bhindora to Vadasada Road (NP) Km.0/00 - 4/800 Ta.Manavadar
Dist.; Junagadh. (Under MMGSY-Normal-New Road Construction-2020-21)
Memorandum showing items of works to be carried out
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
1 1.15 Hect Clearing and grubbing of road land 32361.25 Rupees One
incl.uprooting rank vegetation, grass, Thirty Two Hect.
bushes, shurbs, saplings and trees Thousand
girth upto 300mm removal of stumps Three
of trees cut earlier and disposal of Hundred
unserviceable materials © By Sixty One
mechanical means in area of Light And Paise
jungle. Twenty Five
2 15544.00 Cum Earthwork for embankment including 160.24 Rupees One One
breaking clods, dressing with all lead Hundred Cum
and lift (Excluding watering and Sixty And
consolidation) (A) From borrow area Paise Twenty
with all lead and lift.Executed with Four Only
machineries.(Selected soil to be used
for earthwork shall be from
BORROW AREA only having CBR
not less than 6.00%)
3 536.00 Cum Box cutting the road surface to 69.46 Rupees Sixty One
proper slope and camber for making Nine And Cum
a base for road work including Paise Forty
removing the excavated stuff and Six Only
depositing on the road side slopes as
directed upto all lead.
4 1202.00 Cum Earthwork in cutting in all sorts of 85.16 Rupees One
soil and soft Murrum including Eighty Five Cum
conveying and spreading the suff And Paise
embankment as and where directed Sixteen Only
within 200 meters from the end of the
cutting with all required lead and lift.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
5 4095.00 Cum Granular Sub-base with Black trap 704.90 Rupees Seven One
crushed stone well Graded Material Hundred Four Cum
(Table.400.1) by Mix in place And Paise
Method. Construction of Granular Ninety Only
Sub-base by Providing Black Trap
cruhsed stone well greded material,
spreading in uniform layers with
motor graded on prepared surfce,
mixing by mix in place method with
rotavator at OMC, and compacting
with Vibratory roller to achieve the
desired density, complete as per
Technical Specification Clause-401.
For Grading-1 Materials.
6 1552.00 Cum WBM Grading-1 1008.87 Rupees One One
Providing, laying, spreading and Thousand Cum
compacting stone agg. Of 90mm to Eight And
45mm size to water bound macadam Paise Eighty
specification including spreading in Seven Only
uniform thickness, hand packing,
rolling with smooth wheel roller 80-
100 KN in stage to proper grade and
camber, applying and brooming,
stone screening/binding material to
fill-up the intersties of coarse agg.,
watering and compacting to the
required density grading-1 as per
Technical Specification Clasue.405
By menual means.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
7 2768.00 Cum WBM Grading-2 840.64 Rupees Eight One
Providing, laying, spreading and Hundred Cum
compacting stone agg. Of 63mm to Forty And
45mm size to water bound macadam Paise Sixty
specification including spreading in Four Only
uniform thickness, hand packing,
rolling with smooth wheel roller 80-
100 KN in stage to proper grade and
camber, applying and brooming,
stone screening/binding material to
fill-up the intersties of coarse agg.,
watering and compacting to the
required density grading-2 as per
Technical Specification Clasue.405
By menual means.
8 18087.00 Cum Rolling and Watering of earthwork in 18.67 Rupees One
layers with vibratory roller including Eighteen And Cum
filling in depression which occur Paise Sixty
during the process as directed. Seven Only
9 1082.00 MT Providing and laying bitumenous 2291.23 Rupees Two One
grout 37.50mm thick using Bitumen Thousand MT
Grade VG-30 for tack coat at the rate Two Hundred
of 4.00kg/10sqm on W.B.M. and Ninety One
using BT chips for required gradation And Paise
with the asphalt of grade (VG-30) at Twenty Three
the rate of 1.99% i.e 19.90kg/MT by Only
weight of mix including heating and
mixing in drum mix plant
transporting the mix and spreading
the same by paver finisher and
consolidation as per MOST
specification including cost of all
materials fuel, labours, tools and
plants etc. using contractor's own
drum mix plant etc. complete.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
10 758.00 MT Providing, laying and rolling of 3103.70 Rupees Three One
25mm thick using Bitumin grade of Thousand MT
VG-30 open graded premix One Hundred
bituminous carpet with B.T Three And
aggregates as specified and using Paise Seventy
bitumen for tack coat at the rate of Only
2.50kg/10sqm on B.T.Surface (As
per IRC-16) and using bitumen for
mixing with aggregate at the rate of
3.36% i.e 33.60kg/MT. of total mix
including heating and mixing in drum
mix plant, spreading the same with
paver finisher and consolidation with
vibratory roller including necessary
firewood, oil, lubricants, labour
charges etc. using equipment tools
etc. completed in accordance with the
requirement of specification.
11 394.00 MT Providing and laying seal coat using 3510.01 Rupees Three One
Bitumin grade VG-30 with B.T. Thousand MT
aggregate as specified using Five Hundred
aggregate at the rate of Ten And
0.18cum/10sqm. And bitumen for Paise One
mixing with aggregate at the rate of Only
4.5% i.e 45.00kg/MT of total mix
including heating and mixing in drum
mix plant and spreading the same by
paver finisher and consolidation with
vibratory roller including necessary
using contractor's own drum mix
plant, machineries and equipment,
tools etc. complete in accordanace
with the requirement of specification.
12 93.00 Cum Excavation for foundation upto 1.5m 161.19 Rupees One One
depth including sorting out and Hundred Cum
stacking of useful materials and Sixty One
disposing of the excavated stuff upto And Paise
all lead. Dense or hard soil. Nineteen
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
13 73.00 Cum Excavation for foundation upto 1.5m 274.66 Rupees Two One
depth including sorting out and Hundred Cum
stacking of useful materials and Seventy Four
disposing of the excavated stuff upto And Paise
all lead. Hard Murrum Sixty Six
14 440.00 Cum Excavation of foundation in Sand 324.51 Rupees Three One
graval caly soft soil and murrum etc. Hundred Cum
including shoring, struting Twenty Four
dewatering as necessary and And Paise
disposing of the excavated stuff as Fifty One
directed. Depth upto 3.00mt. Only
15 689.00 Cum Excavation of foundation in hard 388.14 Rupees Three One
murrum and boulders and very stiff Hundred Cum
or sticky clays and other similar Eighty Eight
strata including shorting out and And Paise
struting and dewatering as necessary Fourteen
and disposing of the excavated stuff Only
16 330.90 Cum Excavation in large boulders and soft 454.95 Rupees Four One
rock by wedging including shoring, Hundred Cum
strutting and dewatering as necessary Fifty Four
and disposing of the excavated stuff And Paise
as directed, Ninety Five
17 199.10 Cum Filling in plinth with sand under 339.70 Rupees Three One
floors including watering ramming, Hundred Cum
consolidating and dressing complete. Thirty Nine
18 130.00 Cum Providing and laying rubble for apron 734.93 Rupees Seven One
(Each stone weighting not less than Hundred Cum
40kg) including and packing and Thirty Four
filling in the interstices with quarry And Paise
spall. Ninety Three
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
19 81.60 Cum Providing and filling in foundation 2673.17 Rupees Two One
with ordinary cement concrete M-15 Thousand Six Cum
mix and providing vertical pin Hundred
headers incl. Formwork, vibrating, Seventy
ramming and curing complete. Three And
20 496.30 Cum Providing and casting in situ ordinary 2823.75 Rupees Two One
cement concrete M-150 mix and Thousand Cum
providing necessary pin headers Eight
including shuttering, scafilding, Hundred
laying vibrating, curing and finishing Twenty Three
complete Without V-Grooves For all And Paise
Hieght. Seventy Five
21 375.00 Cum Providing and filling in foundation 2216.44 Rupees Two One
with ordinary cement concrete M- Thousand Cum
10/M-100 mix and providing Two Hundred
necessary vertical pin headers incl. Sixteen And
Formwork, vibrating, ramming and Paise Forty
curing complete. Four Only
22 508.00 Cum Providing and cast in situ Controlled 5011.43 Rupees Five One
cement concrete M-30 (1: 1 :2)for Thousand Cum
average 15cm thick wearing coat Eleven And
/C.C. pavement laid as directed in Paise Forty
approved fixed side form work of Three Only
steel channel including vibrating by
screed needle vibrator and finishing
by plate vibrator and finished in
continuous operation including
providing of contruction joint at
every 4.0mtr. and expansion joint at
interval of 40mtr. applying
debonding strips, bitumen primer
bitumenous sealant 12mm dia jute
rope and curring etc. complete.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
23 392.10 Cum Providing and cast in situ controlled 3280.48 Rupees Three One
Cement Concrete M-200 Mix and Thousand Cum
providing necessary pin headers Two Hundred
including shuttering scafolding, Eighty And
laying, vibrating, curring and Paise Forty
finishing complete without V- Eight Only
grooves (A) all heights.
24 158.90 Cum Providing and casting in situ 4173.06 Rupees Four One
Controlled Cement Concrete M-200 Thousand Cum
for R.C.C. Raft and cut-off walls One Hundred
including neccesary shuttering Seventy
laying, vibrating ramming of curing Three And
complete. Paise Six
25 49.70 Cum Providing and casting in situ 3714.93 Rupees Three One
Contolled Cement concrete M 20 Thousand Cum
mix for R.C.C. works in pier cap, Seven
abutment cap, and dirt wall including Hundred
controlled cement concrete M 25 bed Fourteen And
block or pedestals for required size Paise Ninety
below bearings as per detailed Three Only
drawings, centering, shuttering,
scaffolding wherever necessary
laying, vibrating, curing and finishing
26 221.60 Cum Providing and casting in situ 4289.72 Rupees Four One
Controlled cement concrete M 25 for Thousand Cum
R.C.C. Solid slab including Two Hundred
centering, scaffolding, curing and Eighty Nine
finishing complete. And Paise
27 119.80 Cum Providing and casting in situ 3905.82 Rupees Three One
Contolled cement concrete- M-200 Thousand Cum
for average 75/150/200mm thick Nine
wearing coat laid as directed Hundred Five
incuding. tamping, vibrating, And Paise
finishing, curring and filling in joints Eighty Two
with bitumen complete. Only
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
28 14.20 Cum Providing and casting in situ 3777.50 Rupees Three One
Contolled cement concrete- M-200 Thousand Cum
mix for Approach slab including Seven
formwork, curing and finishing Hundred
complete. Seventy
29 12.60 Cum Providing and casting in situ 3589.79 Rupees Three One
Controlled cement concrete- M-20 Thousand Cum
mix for kerbs/Kerb blocks including Five Hundred
formwork,curing and finishing Eighty Nine
complete. And Paise
30 79.00 Nos Providing and laying weep hole in 39.03 Rupees One
Abutment and returns by using A.C Thirty Nine No
pipe of 100mm. Incl. fixing in And Paise
proper grade and jointing the Three Only
complete as per detailed
31 70.20 Sqm Providing and laying filter media 786.89 Rupees Seven One
600mm. thick directed at the back of Hundred Sqm
abutments, returns and wing walls as Eighty Six
per detailed specifications. And Paise
32 42.00 Nos Providing and fixing in position Mild 256.64 Rupees Two One
steel dowel bars in pier cap or Hundred No
abutment caps for anchorage in fixed Fifty Six And
end as per detailed drawings Paise Sixty
including cutting bending and Four Only
welding complete.
33 42.00 Nos Providing and fixing in position Mild 373.30 Rupees Three One
steel dowel bars in pier cap or Hundred No
abutment caps for anchorage in free Seventy
end as per detailed drawings Three And
including cutting bending and Paise Thirty
welding complete. Only
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
34 18.424 MT Providing and laying in Position FE - 71636.85 Rupees One
500/500D TMT bar reinforcement Seventy One MT
including cutting, bending, hooking Thousand Six
and tying complete as per detailed Hundred
drawings for the following (A) Piers Thirty Six
(B) Abutments (C) Returns (D) And Paise
Walls etc. Eighty Five
35 27.790 MT Providing and Fixing in position FE- 71084.33 Rupees One
500/500D TMT bar reinforcement Seventy One MT
including cutting, bending, hooking, Thousand
and tying complete as per detailed Eighty Four
drawaing (A)RCC kerb (B) RCC And Paise
Footpath (B) RCC Solid Slab/ App. Thirty Three
Slab / Wearing coat. Only
36 99.00 Rmt Construction of Precast R.C.C. 1502.57 Rupees One One
railing of M 30 grade in cast-in-situ Thousand Rmt.
with 20mm nominal size aggregate, Five Hundred
true to line and grade, toleranace of Two And
vertical railing post not to exceed 1 Paise Fifty
in 500, center-tocenter spacing Seven Only
between vertical posts not to exceed
2000 mm as per drawing and
technical specifications caluses
37 36.30 Sqm Providing 12mm. Thick Pre-moulded 772.04 Rupees Seven One
asphalt filler joints as per drawings Hundred Sqm
38 28.00 Nos Providing G.I. 100mm. Diameter 531.31 Rupees Five One
water spouts including necessary iron Hundred No
gratings as per drawings. Thirty One
39 4.00 Rmt Providing flood gauge marks on sub 99.26 Rupees One
structure as per design including Ninety Nine Rmt.
painting complete And Paise
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
40 166.00 Cum Filling available excavated earth 88.85 Rupees One
(excluding rock ) in trenches plinth Eighty Eight Cum
sides of foundation etc. in layers not And Paise
exceeding 20cm in depth Eighty Five
consolidating each deposited layer by Only
ramming and watering.
41 2.00 Nos Numbering the CD work with
Rupees Fifty One
approved paint including all Eight And No
materials for painting etc. complete. Paise Eighty
42 15.00 Rmt Supplying and fixing reinforced 3862.79 Rupees Three One
concrete heavy duty non presure Thousand Rmt.
pipes with collars for culverts Eight
carrying heavy traffic as per IS 458- Hundred
1991 specification including setting Sixty Two
and joinng the pipes in C.M. 1:2 And Paise
watering and laying (to level or Seventy Nine
slope) of I.S. Class NP-3 of Only
following internal diameter with all
lead and lift. (i) 900mm Dia.
43 205.00 Cum Dismantling the existing structure 259.62 Rupees Two One
including removing and stacking the Hundred Cum
dismantled materials as and where Fifty Nine
directed. Stone/Rubble masonary. And Paise
44 31.40 Cum Dismantling the existing structure 590.69 Rupees Five One
including removing and stacking the Hundred Cum
dismantled materials as and where Ninety And
directed. RCC Work. Paise Sixty
45 90.00 Rmt Providing temporary all weather and 607.41 Rupees Six One
fair weather diversion suitable for Hundred Rmt.
traffic during the construction period Seven And
of the bridge / Slab drain including Paise Forty
providing necessary drains and all One Only
safety measures including red lamps /
signals at night for traffic etc.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
46 19.00 Nos Providing and fixing Precast cement 321.63 Rupees Three One
concrete Hectometer as per IRC type Hundred No
design incl. painting, lettering etc. Twenty One
fixing in C.C. 1:5:10. And Paise
47 300.00 Nos Providing and fixing Precast cement 135.74 Rupees One One
concrete Guard stone as per I.R.C. Hundred No
type design including white washing Thirty Five
etc. complete. Fixing in C.C.1:5:10. And Paise
48 5.00 Nos Providing and fixing ordinary 594.94 Rupees Five One
Kilometer stone of pre-cast C.C. Hundred No
1:2:4 including necessary Ninety Four
reinforcement as per I.R.C. type And Paise
design in C..C. 1:4:8 including Ninety Four
painting lettering etc. complete. Only
49 216.00 Nos Providing and fixing Indicator stone 118.77 Rupees One One
of approve stone as per I.R.C. type Hundred No
design in C.C. 1:4:8 including white Eighteen And
washing etc. complete Fixing in Paise Seventy
Earth Seven Only
50 2.00 Nos Supplying and fixing Junction 5472.18 Rupees Five One
Boards of M.S. plates and angles as Thousand No
per I.R.C. design incl;. Fixing in Four Hundred
C.C. 1:4:8 with necessary excavation Seventy Two
painting, figuring, lettering on boards And Paise
etc. complete. Eighteen
51 2.00 Nos Providing and fixing Village name 3943.44 Rupees Three One
Boards as per standard I.R.C. type Thousand No
design of steel plate incl. painting, Nine
lettering etc. complete with fixing in Hundred
C.C. 1:4:8 block with necessary Forty Three
excavation etc. complete And Paise
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
52 20.00 Nos Providing and fixing Road sign of 3511.09 Rupees Three One
M.S. plate and angle iron incl. Thousand No
painting, lettering etc. complete. Five Hundred
fixing in C.C. 1:4:8 block with Eleven And
necessary excavation etc. complete as Paise Nine
per IRC type design (i) Reflective Only
53 2.00 Nos Providing and Fixing Flood guage 3220.89 Rupees Three One
post confirming to IRC 67-2001 Thousand No
using engineering grade retro Two Hundred
reflective sheeting including lettering Twenty And
and border as directed. For New Paise Eighty
structure. Nine Only
54 2.00 Nos Cautionary Warning Sign : Providing 4040.88 Rupees Four One
and fixing sign boards made out of Thousand No
2mm Aluminium sheet size Forty And
90x90x90 cms. Equilateral treangle Paise Eighty
as per the design of IRC-67-1977 pre Eight Only
treated with phospheting process and
acid etching coated with one coat of
apoxy primer and two coats of best
quality epoxy paint reflectorised with
retro reflective sheeting as per latest
MOST specification 3.1 Mt. long
stand post and frame fabricated from
suitable size iron angle of
required painted with best quality
epoxy coating in black and white
bends the details of symbole for each
board shall be as per the instruction
of Engineer in charge the fixing at
site shall be in 1:2:4 CC block of size
45x45x60cms. for each leg including
excavation curring etc. complete
under the supervision of engineer in
charge (A) Engineering Grade.
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
55 2.00 Nos Citizen's information Board. 8411.28 Rupees Eight One
Providing and fixing of typical Thousand No
MMGSY information board as per Four Hundred
instruction. Two MS sheets of 3 mm Eleven And
thick, of 900 mm x 750mm size fixed Paise Twenty
at top & bottom duly rivetted with Eight Only
MS angles of 25 x 25 x 5 mm thick
M.S angle shall be welded by two
vertical M.S angle of 5 mm thick to
75 mm x 75 mm of 12 SWG square
tubes posts duly embedded in cement
concrete M-15 grade blocks of
600mm x 600mm x 750mm, below
ground level. The letters & figure of
any shade reflectorised with High
Intensity Prismatic Grade Retro
Reflective Sheeting of Type-4 as per
ASTM D-4956 and latest MORD
specifications; All sections of framed
posts and steel tube will be painted
with primer and two coats of epoxy
paints as per drawing Clause
and Annexure 1700.1 (10.16). (A)
Class-B High intensity Grade Retro
Reflective sheeting.
56 67.20 Rmt Provinding Crash Barrier including 2101.81 Rupees Two One
ISMB 150 section 2.5 meter C/C 1:5 Thousand Rmt.
meter in length and W shape GI 3 One Hundred
mm plate in single rows including One And
providing 1:5:10 PCC and 1:2:4 UCC Paise Eighty
for RCC work steel reinforcement One Only
etc. as per detailing drawing
providing and fixing with nuts &
bolts welding as required and one
coat of redoxide and two coat of
approved oil paint etc. complite.
Rupees Two Crore Ninety Five Lakh(s) Fourteen Thousand Four Hundred Ninety
Seven And Paise Ninety Seven Only
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent ( Should
be written in figures and words ) of the estimated rate mentioned above. Amount of My \ Our tender works
Item Quanties Item of work Estimated Rates Unit Total amount
Item Quanties Item of work Estimated Rates Unit Total amount
No. Estimated but In Figure In Words. according to
may be more or Rs. Ps. estimated
less. quantieis.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Belowe Rs…………..….…… Add……..……..% Above Rs….….…….
In words………………….……………… In words………………….………………
Signature of Contractor. Executive Engineer
Panchayat R&B Division
Deputy Executive Engineer
Panchayat R&B Sub Division
NOTE: Amount Rs.65486.06 Of Dismentalled materials shall be recovered from 1st R.A. bill of Contractor at once.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GR ALL.pdf
1. Schedule-B_Bhindora MMNNP-20-21.pdf
2. Form B-1 BHindora MMNNP-20-21.pdf
3. Speci BHindora MMNNP-20-21.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .