| 1 | L1₹64.6 LAccepted-AOC AMARPUR GOMATI TRIPURA | AMARPUR | GOMATI | TRIPURA | L1 | Accepted-AOC L1 | |
| 2 | L2₹69.4 L+₹4.8 L (7.35%)Rejected-AOC DHALESWAR JAIL ASHRAM ROAD AGARTALA TRIPURA W | DHALAI | TRIPURA | 799204 | L2 | Rejected-AOC L2 | |
| 3 | L3₹73.9 L+₹9.3 L (14.4%)Rejected-AOC JOGENDRA NAGAR AGARTALA WEST TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | L3 | Rejected-AOC L3 |
Tender Value
₹59.6 L
EMD Value
₹1.2 L
Closing Date
7 Dec 2022, 3:00 pmClosed
Dy General Manager ED Belonia
Dy General Manager ED Belonia South Tripura
Border flood lighting
2022_POWER_34559_1
DNIT/DGM/ED-BLN/2022-23/09 Date 04.11.2022
Open Tender
Electrical Works
Turn-key
365 days
Dy General Manager ED Belonia
6 documents required · 6 mandatory
₹4,000
₹1.2 L
9 Jan 2023
30 Nov 2022
7 Dec 2022
30 Nov 2022
7 Dec 2022
30 Nov 2022
30 Nov 2022 - 6 Dec 2022
Amount
11 Meter steel tubular pole
9 meter long PCC Pole
Stay set complete with 16 mm dia 1.8 meter stay rod anchor.
Stay insulator(HT)
Galvenised stay wire
MS Channel (75X40X40X6 mm)
MS Channel (100X50X50X6 mm)
MS Angle (65X65X6 mm)
11KV Polimeric Pin Insulator
11 KV Polimeric Disc Insulator
11 KV Disc fittings (6/1/2.59 mm to 6/1/3.35 mm)
ACSR weasel (6/1/2.59 mm) conductor
8 SWG GI wire
11KV GO switch unit 3-ph
11KV DO fuse unit 3-ph
9 KV, 5 KA LA
120 Sqmm PVC cable
70 Sqmm PVC cable
100 Amp Cutout
100 KVA Distribution Transformer
Wooden Plunk (L-9, Breath-1.5, Thickness-1.5")
Supply of Jointing kit 3X120 Sqmm outdoor type
Supply of Jointing kit 3X120 Sqmm Indoor type
Supply of 120 Sqmm 11KV XLPE Power cable
RCC Transformer base by cement concrete base as per standard TSECL schedule for two nos. which not yet done Hrishyamukh BOP and Matai BOP.
Carriage of 11 Mtr long Steel tubular pole from sub-divisional store yard to the work site.
Carriage of 9 Mtr long PCC pole from sub-divisional store yard to the work site.
Carriage of 100 KVA Distribution Transformer from sub-divisional store yard to the work site.
Carriage of Materials such as cable, ACSR, GI wire, Cross arm, stay set insulators etc by Mechanical Transport from the Hrishyamukh electrical Sub-Division site to working site vis-à-vis.
Erection of 11 Mtr long ST pole
Erection of 9 Mtr long PCC pole
Erection of Stay set complete with 16 mm dia 1.8 meter stay rod anchor.
Erection of 11/0.43 KV 100 KVA Distribution Transformer.
Erection of 11KV GO switch (3-Ph)
Erection of 11KV DO Fuse (3-Ph)
Erection of 9KV, 5KA Lighning Arrestor.
Supply & erection of 2.5 mtr long 40 mm dia GI pipe (Make-TATA/JINDAL) and supply of 60 Kg salt & 55 Kg Charcoal.
Erection of 11KV Polymeric Pin Insulator
Erection of 11KV Disc Insulator
Laying and stringing of ACSR Weasel (6/1/2.59 mm)
Erection & fitting fixing of pad connector with the help of MS clamp and Nuts & bolts
Providing & Executing cement concreate works 1:2:3(1Cement:river sand:4 Jhama bricks aggregrate for grouting of S.T pole ( 0.275 Cum/Pole x 72 pole =19.8 cum.
Laying and stringing of 10/8 SWG GI Wire
Providing of 3-Ph service connection with PVC cable
Erection of protective of protective Guarding |cross lacing for 415/240 volt line by GI Wire
Erection of MS Angle 1 to 2.5 Mtr Long of 65x65x6 mm
Erection of MS Channel Cross Arm 1.3 to 2.8 Mtr Long 75x40x40x6 mm
Erection of MS Channel Cross Arm 0.3 to 1.2 Mtr Long 75x40x40x6 mm
Erection of V Cross Arm 65X65X6mm MS Angel /75x40x40x6 mm
Erection of MS Channel Cross Arm 2.8 Mtr Long 100x50x50x6 mm
Maintaining adequate cleareance from overhead live conductors by tumming of tree branches for way leaves.
Straightening of 11 Mtr Steel tubular pole old BFL line from Dharmanagar to Nalua BOP
Fabrication of cross arm by Channel/Angle as per specification.
Dismantling of ACSR 6/1/2.59 mm dia Weasel already exist.(18 Km for existing old BFL line from Dharmanagar to Nalua) due to non energisation since comissioning.
Erection of ACSR 6/1/2.59 mm dia Weasel conductor (18 Km for existing old BFL line from Dharmanagar to Nalua)
Dismantling of 11KV Pin Insulator already exist in old BFL line Dharmanagar to Nalua due to non energisation since comissioning.
Erection of 11KV Pin Insulator
Dismantling of 11KV Disc Insulator already existing in old BFL line Dharmanagar to Nalua due to non energisation since comissioning.
Erection of 11KV Disc Insulator.
Dismantling of 11KV Stay set complete already exist in old BFL line Dharmanagar to Nalua due to non energisation since comissioning.
Erection of 11KV Stay set complete.
ADHIR DEBNATH
SUDHANGSHU BHATTACHARJEE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .