Tender Value
₹10.1 L
EMD Value
₹10,700
Closing Date
15 Jun 2026, 3:00 pm
Executive Engineer- XV
Tirupati
Providing semi permanent pre-fabricated roof summer pendals for Padalamandapam and Sri LNS Temple at Alipiri, Tirupati for the year 2026-27
940013
3/EE-XV/TTD/Tpt/2026-27
OPEN - NCB
Annual maintenance works
TIRUPATHI
6 documents required · 6 mandatory
₹357
₹10,700
29 May 2026
29 May 2026
29 May 2026
Hire charges for erection and removal of flat / sloped roof M.S pipes pendals using 40mm MS pipes using special type gripper MS clamps (Nandu clamps) for fixing horizontal bracings and at 2.40m to 2.70m level and jointing pins for horizontal bracings etc. The height of the roof should be between 9' to 12'. The entire roof shall be made of one layer of nylon net with opening of size 100 x 100 mm .The nylon net must be tied alround for stiffness and for tying at the ends. The entre roof is to be covered with PVC coated lacquered finish fabric of approved GSM (300 to 400) over the nylon net for providing shelter. Necessary tying arrangements to be made to the PVC fabric with nylon rope or any other suitable material to keep the same in position. (The rate is Excluding GST). The rate is including earth work excavation in all soils (except rock requiring blasting) to a depth of 0.40m to 0.60m the vertical posts are to be fixed strongly with out any shaking and including labour charges for all the operations such as loading, unloading, erection, watch, ward and conveyance etc., complete.* The relevant conditions of the foot note mentioned at the end of these items/chapter applies.**For a period of 04 Months from date of erection.
Hire charges for erection and removal of flat/sloped roof M.S pipes pendals using 40mm MS pipes for verticals . horizontals and roof supports etc., fixing with, special type gripper MS clamps ( Nandu clamps) , extra horizontal bracings should be provided from at 2.40 m to roof level and jointing with special type gripper MS clamps ( Nandu clamps)for horizontal bracings and column roofing including earth work excavation in all soils (Except rock requiring blasting) to a depth of 0.40m to 0.60m. The vertical posts are to be fixed strongly with out any shaking. The roof shall be covered with G.I sheet/Aluminium sheet/Galvalume sheet and firmly fixed to the purlins etc., complete as directed during execution .The rate including conveyance and hire charges of all materials such as MS pips, Clamps, G.I sheet/Aluminium sheet/Galvalume sheet etc. and labour charges for fixing and removal etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
-do- For Forty Five (45) days
-do- For Thirty days (30 days)
- do - for three (3) days
Hire charges for providing White ceiling cloth for decorating the pendals and Mandapam with necessary frame work with decorative frills (jallars) around and border and decorative frills (jallars) at the centre with red or green colour or any other attractive colour wherever necessary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and preferably new or neatly washed and should be in good condition through out the Festival or Ustavam period and should be removed after the same is over and should be repaired or replaced as and when torn out by any means including due to rain with out any extra cost .The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days .(The rate for pendals will be paid as per area of pendals measured on covering plan area) Note: If, there is any deviation in the usage of good quality of cloth effecting the pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer in charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - for one (1) day
- do - for three (3) days
- do - For ten (10) days
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., and the colour carpets should be cleaned every day and to keep neat appearance as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - for one (1) day
- do - for three (3) days
- do - For ten (10) days
Hire charges for erection and removal of MS pipes Pendals with MS pipes 40 mm dia for veridical, horizontals bracings and roofing. The pendals are firmly fixed with bracings and with necessary frame work/rope etc., and the roof covered with thick white ceiling cloth along with all round frills (jallars) including anchoring to the ropes to the ground with suitable anchoring and necessary watch and ward against theft and fire accidents and incidental charges etc. complete as directed during execution. The rate quoted is including conveyance of all materials (Transportation charges) and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.(The rate for pendals will be paid as per area of pendals measured on covering plan area). Note:- If, there is any deviation in the usage of good quality of cloth effecting pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer-in-Charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
- do - for one (1) day
- do - for three (3) days
- do - For ten (10) days
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc., including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution .
- do - for one (1) day
- do - For ten (10) days
Hire charges for providing Pagodas for One(1) day of 15ft x 15ft size with clear height of 10' at the ends and 14' height at centre. The pagodas shall be provided with adequate MS trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The entire roof shall be covered suitably with Fabric firmly fixed to the purlins etc., The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for erection and removal of temporary Dias for Ten(10) days at a height of 60 cms to 120 cms (2' 0" to 4' 0") from the floor/Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made with out undulation. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for erection and removal of temporary Platform for Three(3) days at a height of 15 cms to 30 cms (6" to 12") from the floor/Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made without undulation and without shaking. The rate quoted is including conveyance of all materials, hire charges and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies
Hire charges for supply of steel dining tables of size 1’6” x 6’0” including loading and unloading. *The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc.,complete *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for supply, spreading and removing of PVC chairs including loading and unloading. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for providing Three Seater VIP Sofas as decided by the department, including conveyance, loading and unloading etc. complete. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc.,complete. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for providing of Banquet chairs for VIPs including loading, unloading, transportation etc., complete. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete . *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ NIT 3.xls
TENDER_DOCUMENT • 0.04 MB
Conditions Nit 3.doc
TENDER_DOCUMENT • 0.52 MB
Download all tender documents and submit your bid