Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC accept |
| 2 | L2₹4.1 L+₹4,236.44 (1.04%)Rejected-AOC | ₹4.1 L+₹4,236.44 (1.04%) | L2 | Rejected-AOC accept |
| 3 | L3₹4.3 L+₹25,180.88 (6.21%)Rejected-AOC KAVIKKUNNEL H KUNNACKAL P O MUVATTUPUZHA | MUVATTUPUZHA | KERALA | ₹4.3 L+₹25,180.88 (6.21%) | L3 | Rejected-AOC accept |
| 4 | L4₹4.7 L+₹66,166.81 (16.3%)Rejected-AOC KERALA KL | KANNUR | KERALA | 670001 | ₹4.7 L+₹66,166.81 (16.3%) | L4 | Rejected-AOC accept |
Tender Value
₹5.3 L
EMD Value
₹13,400
Closing Date
16 Sept 2019, 10:00 amClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER,PVIP SUB DIVISION NO2
Silt removal
2019_Irrig_300024_1
32/ET/AEE2/PVIP/2019-20/S
Open Tender
Civil Works - Canal
Item Rate
120 days
Rayamangalam
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,200
Yes
online
₹13,400
Yes
3 Jan 2020
7 Sept 2019
19 Sept 2019
7 Sept 2019
16 Sept 2019
7 Sept 2019
Amount
scheme 1, Ch:0m to 1000m
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.28.1 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
scheme 2, ch.1000m to 2000 m
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.28.1 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
scheme 3, Ch:2000 m to 3500 m
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.28.1 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
od38928/2019_2020/P2 : Extra for every additional lift in excavation-aii kind of soil -Quantity for remaving silt from 1 m2 is 1*1*0.15 (av.thickness)=0.15m3
scheme 4, Ch:3500 m to 5000 m
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
2.28.1 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
od38928/2019_2020/P2 : Extra for every additional lift in excavation-aii kind of soil -Quantity for remaving silt from 1 m2 is 1*1*0.15 (av.thickness)=0.15m3
shanto jose
George Kutty
REJEEV P K
Bidder Name
shanto jose
George Kutty
REJEEV P K
QUBE CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_410117.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .