| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 CrAdmitted-Finance | ₹12.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹12.6 CrAdmitted-Finance | ₹12.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹13.9 CrAdmitted-Finance JAIPUR RAJASTHAN 302019 INDIA UDYAM RJ 17 0101683 | JAIPUR | RAJASTHAN | 302019 | ₹13.9 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Suncity Urja Private Limited L3 | IDEAS ELECTRICALS AND ENGINEERS PRIVATE LIMITED L1 | M/s BNC Power Projects Ltd. Pune L2 |
|---|---|---|---|---|---|---|
| 1.00Part-A Supply | ||||||
| 2.00 | 50 MVA, 220/33 KV, Three Phase Transformer including first filling of oil, along with Fibre Optic Temperature Measurement System complete with all associated accessories complete. Base of trnasformer should be suitable for existing Foundation. | 1 | No. | 13,51,55,000 ₹13.7 Cr | 11,88,44,651 ₹12.1 Cr | 12,08,00,000 ₹12.3 Cr |
| 3.00 | Nitrogen Injection Fire Prevention & Extinguishing System for Transformer & Reactor | 1 | No. | 26,00,000 ₹26.3 L | 26,38,616 ₹26.9 L | 26,75,000 ₹27.3 L |
| 4.00 | 4X2.5 Sqmm Control Cable | 1 | Km | 1,97,000 ₹2.0 L | 2,69,567 ₹2.7 L | 2,65,000 ₹2.7 L |
| 5.00 | 2X2.5 Sqmm Control Cable | 1 | Km | 1,38,200 ₹1.4 L | 1,61,741 ₹1.6 L | 1,65,000 ₹1.7 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹27.2 L
Closing Date
10 Dec 2025, 3:30 pmClosed
SUPERINTENDING ENGINEER CANDP-1
SUPERINTENDING ENGINEER CANDP-1
Augmentation of Transformer capacity from 25 MVA at 220/33 kV to 50 MVA 220/33 kV at 220 kV SUBSTATON SIDCUL Haridwar
2025_PTCU1_86596_1
PTCUL/CandP-I/SS-08/2025-26
Open Tender
Electrical Works
450 days
SIDCUL Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹29,500
Yes
MD PTCUL
₹27.2 L
Yes
Dehradun
8 Jan 2026
26 Aug 2025
11 Dec 2025
26 Aug 2025
10 Dec 2025
17 Sept 2025
9 Sept 2025
Amount
Part-A Supply
50 MVA, 220/33 KV, Three Phase Transformer including first filling of oil, along with Fibre Optic Temperature Measurement System complete with all associated accessories complete. Base of trnasformer should be suitable for existing Foundation.
Nitrogen Injection Fire Prevention & Extinguishing System for Transformer & Reactor
4X2.5 Sqmm Control Cable
2X2.5 Sqmm Control Cable
Description of Work / Item(s)
Amount
Part-B Civil Works
Earth work excavation by mechanical means ( Hydraulic excavator) / manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, including all leads & lifts.
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering. All work up to plinth level 1:2:4 ( 1 Cement, 2 Coarse sand, 4 graded stone aggregate 40 mm nominal size.)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 ( 1 Cement, 4 Coarse sand, 8 graded stone aggregate 40 mm nominal size.)
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering and shuttering, finishing. All work up to plinth level 1:1.5:3 ( 1 Cement, 1.5 Coarse sand, 3 graded stone aggregate 20 mm nominal size.).
First class brick work in 1:4 cement and sand mortar including cost of material, labour and T&P required for proper completion of work.
Plaster in 1:4 ratio with cement and sand including cost of material, labour and T&P required for proper completion of work.
M.S Steel Bar (Including Supply)
Construction of trench (0.65x0.50 mtr.)/(1.10x1.0 mtr)/(0.40X0.40 mtr) with trench cover complete including excavation work, C.C. work in 1:4:8 ratio & C.C. work in 1:2:4 ratio, first class brick work, plaster and fixing of (40x40 mm size) angle on top side of trench & Making frame of trench cover of required size by 40x40 mm size angle & Construction of trench cover by Cement concrete in 1:2:4 ratio.complete work including cost of all material, labour and T&P etc.
Safe and proper opening of all the termination connection and inter-connection from all Panels, Marshalling Box etc by ensuring proper safety of ferrules, terminals, lugs, cable identification number tagging as per executed drawing including cost of all labour and T&P required for the proper completion of work.
Work of dragging 25MVA Transformer from site to safe and suitable loading place with the help of hydraulic jacks, sleepers, ceillings and required T&P with all the safety proof arrangements within cost of all material, labour and T&P required for the proper completion of work.
Work of pipe earthing including G.I. pipe electrode, salt, charcoal, sodium bi-carbonate as per standard & all fabricaion work, connecting with main earth mat with the help 75X12mm G.I. earth strip, making pit complete with C.I. frame & Cover including all cost of labour, material & T&P for proper completion of work.
Description of Work / Item(s)
Amount
Part-C Erection, Testing & Commissioning
50 MVA 220/33 KV Three Phase Transformer with RTCC Panel and all associated accessories complete including centrifuging of transformer oil upto desired IR, BDV value and other parameters.
Nitrogen Injection Fire Prevention & Extingushing System for Transformer.
4X2.5 Sqmm Control Cable
2X2.5 Sqmm Control Cable
30 KV Surge arrester / Lightening Arrester(provided by the department)
Shifting of Oil Tank from 220 KV S/S Ramnagar Roorkee or 220 KV S/S Rishikesh to site (220 KV S/S SIDCUL, Haridwar) near 50 MVA Transformer for centrifuging the transformer oil.
Cable termination work of 50 MVA T/F including glanding, ferruling, dressing of all cables & tagging with cable tag including cost of all material (excluding cost of control cable).
Prepration of cable schedule complete in spiral binding in triplicate.
Testing (complete On Load & Off Load Tests) & commissioining of 50 MVA Transformer at 220 KV Substation, SIDCUL, Haridwar complete in all respect.
Testing of transformer oil of 220/33 KV 50 MVA Transformer from CPRI/NABL test lab at 220 KV S/S SIDCUL, Haridwar
Supervision of testing & commissioning of 50 MVA, 220/33 KV, Three Phase Transformer including first filling of oil, along with Fibre Optic Temperature Measurement System complete with all associated accessories complete.
Description of Work / Item(s)
Amount
Total Part-A (Supply ) from BoQ1 sheet WITHOUT GST
Total Part-B (Civil Work ) from BoQ2 WITHOUT GST
Total Part-C ( Erection, Testing & Commissioning) from BoQ3 WITHOUT GST
Add GST* Amount on (Total of Part-A + Total of Part-B + Total part C) above
M/s BNC Power Projects Ltd. Pune (BID ID -408977)
Suncity Urja Private Limited (BID ID -408914)
M/s BNC Power Projects Ltd. Pune (BID ID -408977)
Suncity Urja Private Limited (BID ID -408914)
M/s BNC Power Projects Ltd. Pune (BID ID -408977)
Suncity Urja Private Limited (BID ID -408914)
M/s BNC Power Projects Ltd. Pune (BID ID -408977)
Suncity Urja Private Limited (BID ID -408914)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BD.pdf
Tender Documents • 1.47 MB
TS.pdf
Other Document • 6.17 MB
AVL.pdf
Other Document • 0.16 MB
SOW.pdf
Other Document • 0.03 MB
PQRN.xls
Other Document • 0.14 MB
ATF.pdf
Tender Documents • 0.45 MB
VRF.pdf
Other Document • 3.31 MB
BOQ_102773.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid