| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹3.2 CrAccepted-Finance | ₹3.2 Cr | H1 | Accepted-Finance Accept |
| 2 | H2₹4.4 Cr+₹1.1 Cr (35.5%)Accepted-Finance | ₹4.4 Cr+₹1.1 Cr (35.5%) | H2 | Accepted-Finance Accept |
| 3 | H3₹4.9 Cr+₹1.7 Cr (52.6%)Accepted-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | ₹4.9 Cr+₹1.7 Cr (52.6%) | H3 | Accepted-Finance Accept |
| 4 | H4₹5.7 Cr+₹2.5 Cr (76.7%)Accepted-Finance 115 116 GANESH NAGAR HOSHANGABAD ROAD BHOPAL M P 462026 IN | BHOPAL | BHOPAL | MADHYA PRADESH | 462026 | ₹5.7 Cr+₹2.5 Cr (76.7%) | H4 | Accepted-Finance Accept |
| 5 | H5₹4.2 Cr+₹97.2 L (30.2%)Accepted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | ₹4.2 Cr+₹97.2 L (30.2%) | H5 | Accepted-Finance Accept |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
28 Apr 2025, 3:00 pmClosed
Ankush Mehta
NHIDCL HQ New Delhi
Consultancy Services of AE from Ch.0-2 MajorBridge of 680m (ii)Construction/Upg of Existing Road to 2L PS from Ranipool to Pakyong from Km 2-16.167 (Balance Work) of NH-717-A Construction of 48m Chuba Khola Bridge fromKm 75.300 - 75.800 on NH-10
2025_NHIDC_855055_1
NHIDCL/HQ/Sikkim/AE/ Ranipool-Pakyong/2025
Open Tender
Consultancy
Item Rate
1980 days
Sikkim
tender document
5 documents required · 5 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ New Delhi
28 Jul 2025
29 Mar 2025
29 Apr 2025
29 Mar 2025
28 Apr 2025
21 Apr 2025
29 Mar 2025 - 11 Apr 2025
11 Apr 2025
Amount
Professional Staff
Team Leader Cum Senior Highway Engineer 1 No.
Resident cum Highway Engineer 1 No.
Bridge/Structural Engineer 1 No.
Road Safety Expert 1 No.
Sub-Professional Staff
Survey Engineer, 1 Nos.
Quantity Surveyor, 1 Nos.
Lab Technician , 1 No.
Assistant Bridge Engineer, 1 Nos.
Assistant Highway Engineer, 1 Nos.
Support Staff (inclusive of per diem allowance)
Office Manager cum Accountant (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (1 nos.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office/HQ. The quoted amount against remuneration should include Hotel Charges, travel costs etc. complete
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of Minimum 200 sqm area shall be rented . The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete.
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
Time period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Time Period
Reports and Document Printing
Monthly reports
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (16.67 kms x 8 times)
Pavement strength measurement using FWD (16.67 kms x 4 times)
Bridge inspection using Mobile Bridge Inspection Unit (16.67 kms x 8 times)
Road signs inspection using Retro Reflectometer (16.67 kms x 8 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Almondz Global Infra Consultant Limited (BID ID -3207790)
PIONEER INRA CONSULTANTS PVT. LTD. (BID ID -3207598)
SUGAM TECHNOCRATS PRIVATE LIMITED (BID ID -3206952)
Geo Designs and Reserch Pvt. Ltd. (BID ID -3207484)
Manglam Infra & Engineering Limited (BID ID -3207689)
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .