| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC being the lowest |
| 2 | L2₹7.9 L+₹3,402 (0.43%)Rejected-Finance VILL PO SITALKUCHI DIST COOCHBEHAR PIN 736158 STATE WEST BENGAL | COOCHBEHAR | COOCHBEHAR | WEST BENGAL | 736158 | ₹7.9 L+₹3,402 (0.43%) | L2 | Rejected-Finance not lowest |
| 3 | L3₹7.9 L+₹4,112 (0.52%)Rejected-Finance | ₹7.9 L+₹4,112 (0.52%) | L3 | Rejected-Finance not lowest |
| 4 | L4₹8.5 L+₹57,292 (7.26%)Rejected-Finance | ₹8.5 L+₹57,292 (7.26%) | L4 | Rejected-Finance not lowest |
Tender Value
₹7.9 L
EMD Value
₹15,860
Closing Date
27 Feb 2024, 6:00 pmClosed
CWE NO 2 VISAKHAPATNAM
CWE NO 2 VISAKHAPATNAM, RAILWAY STATION ROAD, VISAKHAPATNAM - 530004
CONSULTANCY FOR PROVISION OF TOPOGRAPHICAL SURVEY AND SOIL INVESTIGATION FOR PROVISION OF SITE SURVEY FOR SINGLE LIVING ACCOMMODATION AND TRAINING INFRASTRUCTURE AT INS CHILKA
2024_MES_642109_1
82649
Limited
Consultancy Services
Item Rate
60 days
GARRISON ENGINEER CHILKA
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER CHILKA
₹15,860
Yes
13 Mar 2024
13 Feb 2024
29 Feb 2024
13 Feb 2024
27 Feb 2024
20 Feb 2024
13 Feb 2024 - 20 Feb 2024
Amount
Detailed Topographical Survey:
Detailed topographical survey at grid internal of 3m C/c which includes allocation of boundary, locating all the existing structures/services etc getting information about under ground cables sewer lines, fire control sytem etc from various sources and compilation of available data at site complete all as specified and directed. Note:- Area of the site is approx 2.5 Hectare (HA) i.e. 25000 SQM.
Detailed Soil Investigation:
Mobilization of equipment to site for detailed soil investigation and shifting them location to location of boreholes and for in-situ tests.
Boring holes 150 mm dia in any type of soil including weathered rock, SDR and soft rock, but excluding hard rock/fractured rock upto a depth until hard rock/fractured rock strata encountered including following activities:- (a) Conduct of SPT at every 1.5 m interval or change of strata whichever occurs earlier. (b) Collection of undisturbed soil samples (UDS) at every 1.5m interval or change fof strata whichever occurs earlier (a minimum gap of 500mm shall be ensured between SPT and collection of UDS).
Note: (i) Drilling in hard rock/fractured rock shall be measured and paid under item No 3 (i.e. 3.01 & 3.02) here-in-after. (ii) In case of meeting boulders, the boring beyond boulder depth shall be measured under this item. (iii) In case of non-feasibility of collection of undisturbed soil sample, disturbed soil sample shall be collected, duly recording the reasons.
Drilling holes in hard rock / fracturcd rock using hydraulic drilling machine within the borehole for cutting cores in rock and collection of cores of requisite size and length as per relevant IS standards. Drilling shall continue till minimum 6.5 m into hard rock strata or 10 m depth whichever is more.
Conduct of following laboratory tests on rock samples / cores collected from boreholes as per relevant Indian Standards [see IS 2720 (all parts) and IS 1498, IS 9143, IS 13030, IS 9221, IS 8764, IS 9179, IS 10050, IS 10082, IS 10782, IS 12608, IS 13047, IS 3025) a) Visual classification b) Density c) Specific gravity d) Hardness; e) Degree of weathering; f) Uniaxial compression test (both saturated and unsaturated) g) Point load strength index; h) RQD (Rock Quality Designation)
Note for item No 3.01 & 3.02:- (i) ltem to be operated only in case of encountering rock in borehole with the written permission of GE. (ii) This is compulsory item for the cases where pile foundation is anticipated.
Conduct of following laboratory tests as per relevant Indian Standards (see IS 2720 (all parts), IS 1498 and IS 3025) on soil samples collected: (a) Test on disturbed / undisturbed soil samples: i. Visual and engineering classification; ii. Sieve analysis and hydrometer analysis; iii. Atterberg limits (liquid limit, plastic limit and shrinkage limit); iv. Specific gravity v. Free swell index (b) Tests on undisturbed soil samples: i. Bulk density and moisture content; ii. Unconfined compression test (on re-moulded undisturbed sample); iii. Swelling pressure (On undisturbed and re-moulded sample) iv. Determination of C & Ø values using Direct shear (drained / undrained) (on re-moulded or undisturbed sample) or Triaxial compression tests (on undisturbed or re-moulded sample) or Vane shear test.
Chemical analysis of ground water sample collected at bottom of one borehole.
Chemical analysis of soil samples one each from each strata in respect of one borehole. If different strata(s) encountered in any other borehole additional soils samples to be analysed.
Conduct of Plate Load Test to determine "subgrade modulus" in accordance with IS 9214 at subgrade level for road with rigid wearing course.
Conduct of california bearing ratio (CBR) Test in accordance with IS 2720 (Part 16) on soil sample collected at subgrade level for road with flexible bearing course.
PRANTIK ASSOCIATES
C B ENTERPRISE
BISWAS ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .