Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29.4 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹29.5 L+₹14,652.27 (0.50%)Rejected-AOC | 2 | Rejected-AOC Reject | |
| 3 | 3₹30.5 L+₹1.1 L (3.85%)Rejected-AOC | 3 | Rejected-AOC Reject |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
6 Jun 2024, 3:00 pmClosed
Chief Engineer
FIT Limited, Thaikkattukara, Aluva, Kerala 683101
Demolition of old ladies hostel at Kerala Kalamandalam
2024_FITL_673777_1
FIT/CP-01/2024-25
Open Tender
Civil Works - Buildings
Item Rate
90 days
Kerala Kalamandalam
Please refer Tender documents.
15 documents required · 15 mandatory
₹5,000
₹50,000
1 Aug 2024
29 May 2024
7 Jun 2024
29 May 2024
6 Jun 2024
30 May 2024
29 May 2024 - 3 Jun 2024
Amount
Demoltion and dismantling
15.31 : Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
15.28.1 : Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet
15.28.2 : Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos Sheet
15.14.1 : Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above
15.14.2 : Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters
15.41 : Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead.
15.12.1 : Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below
15.12.2 : Of area beyond 3 sq. metres
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.23.1 : Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm
14.72 : Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
od15601/2024_2025 : Stacking of serviceable materials within all lead after initial lead of 50m up to 1 km (by mechanical means). rubble
od15602/2024_2025 : Stacking of serviceable materials within all lead after initial lead of 50m up to 1 km (by mechanical means). doors and windows
od15109/2024_2025 : Stacking of serviceable materials within all lead after initial lead of 50m up to 1 km (by mechanical means). G.I. Sheet and accessories
od15110/2024_2025 : Disposal of unserviceable materials within all lead after initial lead of 50m up to 1 km (by mechanical means). waste material
15.17.2 : Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats
15.18 : Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,boltd, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
od15636/2024_2025 : Desludging of existing septic tank and disposal of the same at contractors risk outside the campus boundary including all labour and hire charges etc.
AAYKAYCONSTRUCTIONS
TPSAINUDHEEN
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .