Tender Value
₹18.2 L
EMD Value
₹18,200
Closing Date
25 Jun 2026, 6:00 pm
Executive Engineer Public Health Work Division, Rajkot
Construction of New compound wall above Existing at sanosara, kuvadva and rafala HW dist Rajkot
313047
04/2026-27
Open
Water Supply/ Sanitation Works
Rajkot
6 documents required · 6 mandatory
₹900
Executive Engineer,Public Health Works Division Rajkot
₹18,200
10 Jun 2026
10 Jun 2026
10 Jun 2026
25 Jun 2026
10 Jun 2026
GUJARAT WATER SUPPLY & SEWERAGE BOARD
Taluka : Rajkot District : Rajkot
Name of work : Construction of New compound wall above Existing at sanosara, kuvadva and rafala HW.
SCHEDULE - ' A '
Schedule showing the materials to be supplied to the contractor for the work and the rate at which they are to be charged
Sr. No. Particulars Approximate Rate / Unit Place of delivery Remark
1 Contractor shall have to buy and bring ordinary portland cement as per IS 8112-1989 & IS 12269-1987 or its latest revision with ISI mark from open market and produce the bill of purchase along with necessary test certificate at the time of claiming running account bills. The cement shall be tested in the Departmental laboratory at the cost of the contractor whenever instructed by Engineer-in-charge. No extra cost should be claimed by the contractor for the same.
2 All materials except shown in Schedule-A and required for the work shall be provided by the contractor.
3 The contractor shall arrange lifting and carting of materials from departmental store to site of work which includes loading, unloading and proper stacking of materials.
4 The contractor has to provide safe store before taking delivery of materials.
5 The materials not shown in Schedule-A will be issued at issue rate or market rate which is on higher side if the same is available with the departmental and if found in the interest of the work.
6 Any material remaining un-used at the time of completion of work or termination of contract shall be returned to departmental store in perfectly good condition at contractor's cost. When materials are supplied free of cost for use in work and surplus and unaccounted balance thereof are not returned to the department, recovery in respect of such balances will be effected at double the applicable issue rate of the material or the market rate whichever is higher.
DEPUTY EXECUTIVE ENGINEER
SIGNATURE OF CONTRACTOR PHS.SUB DN. NO.-1
GUJARAT WATER SUPPLY & SEWERAGE BOARD
TAL :RAJKOT DIST : RAJKOT
Name of work : Construction of New compound wall above Existing at sanosara, kuvadva and rafala HW.
Qty. Unit Particular Rate Per Amount
190.75 Cum Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand)(A) Modular 4699.69 Cum 896465.87
35.90 Cum Providing and laying controlled cement concrete M.200 and curing complete Including the cost of formwork and excluding The cost reinforcement for reinforced concrete work in (A) Copping upto floor two level. 6086.00 Cum 218487.40
3565.00 Cum Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level 76.52 Kg 272793.80
1735.00 Cum Providing 15mm thick cement plaster in single coat onRough (Similar)side of single or half brick walls forinterior plastering upto floor two level and finished even and smooth in (ii) Cement mortar 1:4 (1-cement :4-sand) 167.20 Sqm 290092.00
1735 Sqm Distempeing (Two coats) with oil bound distemper of approved brand and manufacture and of required shade on wall surfaces to give an even shade, over and including a priming coat with distemper primer of approved brand and manufacture after thoroughly brushing the surface free from mortar dropping and other foreign matter and also including preparing the surface even and sand papered smooth. 79.53 Sqm 137984.55
Total Rs. 1815823.62
I/We am/are willing to carry out the work at______% above/below___________percentage (should be written in figure & words) above/below the estimated rates mentioned above/below amount of my/our tender worked out as under :-
Estimated Amount put to tender Estimated Amount put to tender.
Rs. Add. % Rs. Deduct %
Above Rs. Below Rs.
Total Rs. Total Rs.
(In words Rupees (In words Rupees
EXECUTIVE ENGINEER
Signature of Contractor P. H. W. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 VOL IA Technical Bid Sanoasra Compound Wall.pdf
02 VOL 1 B GCC Sanoasra Compound Wall.pdf
03 Preamble to Price Bid (Volume-III) Sanoasra Compound Wall.pdf
04 Schedule A B Compound Wall.xlsx
XLSX
05 Technical Specification Compound Wall.pdf
all GR without M and R.pdf