Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 LAccepted-AOC | ₹7.8 L | 1 | Accepted-AOC accepted |
| 2 | 2₹7.8 L+₹7,366 (0.95%)Rejected-Finance KERALA KL | ₹7.8 L+₹7,366 (0.95%) | 2 | Rejected-Finance high |
| 3 | 3₹8.2 L+₹42,757 (5.51%)Rejected-Finance | ₹8.2 L+₹42,757 (5.51%) | 3 | Rejected-Finance high |
| Sl No | Description | Qty | Unit | Gopakumar K V L2 | pathmanabhan L3 | SAFEER MON VP L1 |
|---|---|---|---|---|---|---|
| 0.00ROAD CONCRETE | ||||||
| 1.00 | Quarry Waste | 107.38 | cum | 1,180 ₹1,26,708.4 | 1,180 ₹1,26,708.4 | 1,150 ₹1,23,487 Lowest |
| 3.00 | Stone Aggregate(single size):20 mm nominal size | 71.94 | cum | 2,245.95 ₹1,61,573.64 | 2,245.95 ₹1,61,573.64 | 2,245 ₹1,61,505.3 Lowest |
| 4.00 | Stone Aggregate(single size): 10 mm nominal size | 23.62 | cum | 2,245.95 ₹53,049.34 | 2,245.95 ₹53,049.34 | 2,245 ₹53,026.9 Lowest |
| 5.00 | Coarse sand (zone | 47.78 | cum | 2,273.25 ₹1,08,615.89 | 2,273.25 ₹1,08,615.89 | 2,273 ₹1,08,603.94 Lowest |
| 6.00 | Portland Cement | 34.36 | tonne | 9,000 ₹3,09,240 | 10,030 ₹3,44,630.8 | 8,900 ₹3,05,804 Lowest |
| 7.00 | Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper | 7.52 | Day | 1,568 ₹11,791.36 | 1,568 ₹11,791.36 | 1,500 ₹11,280 Lowest |
| 8.00 | Hire charges of Vibrator (Needle type 40 mm) | 7.52 | Day | 876 ₹6,587.52 | 876 ₹6,587.52 | 870 ₹6,542.4 Lowest |
| 9.00 | centering and shuttering | 69.9 | sqm | 90.71 ₹6,340.63 | 90.71 ₹6,340.63 | 90 ₹6,291 Lowest |
Tender Value
₹8.2 L
EMD Value
₹20,484
Closing Date
4 Mar 2026, 1:00 pmClosed
Anil Kumar A
Secretary , Vazhikkadavu Grama Panchayat, Vazhikkadavu(PO) ,Mpalappuram PIN 679333
MGNREGS MATERIAL SUPPLY VAZHIKKADAVU GP WARD 1 VARIOUS WORKS 1st
2026_DP_840202_6
1/2026/MGNREGS//VKD
Open Tender
Civil Works - Roads
Item Rate
150 days
Vazhikkadavu Grama Panchayat
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,810
Yes
₹20,484
Yes
9 Sept 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | ROAD CONCRETE | - | - | - | - |
| 1 | Quarry Waste | 107.38 | cum | 1,180 | ₹1,26,708.4 |
| 3 | Stone Aggregate(single size):20 mm nominal size | 71.94 | cum | 2,245.95 | ₹1,61,573.64 |
| 4 | Stone Aggregate(single size): 10 mm nominal size | 23.62 | cum | 2,245.95 | ₹53,049.34 |
| 5 | Coarse sand (zone | 47.78 | cum | 2,273.25 | ₹1,08,615.89 |
| 6 | Portland Cement | 34.36 | tonne | 10,030 | ₹3,44,630.8 |
| 7 | Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper | 7.52 | Day | 1,568 | ₹11,791.36 |
| 8 | Hire charges of Vibrator (Needle type 40 mm) | 7.52 | Day | 876 | ₹6,587.52 |
| 9 | centering and shuttering | 69.9 | sqm | 90.71 | ₹6,340.63 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1416241.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.23 MB
Tendernotice_3.pdf
PDF • 0.25 MB
pa.pdf
Tender Documents • 0.23 MB
BOQ_1416241.xls
BOQ • 0.41 MB
fot.pdf
Tender Documents • 0.28 MB
affi.pdf
Tender Documents • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .