Tender ID
Tender Value
₹29.9 L
EMD Value
₹29,900
Closing Date
6 Mar 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
Providing and laying Stroam water Drainage line And upgradation & Maintensnce work And Existing Catchpit Repairing And New Catchpit Construction at swastik cross road , stadium cross road ,Nehru nagar ,bhudarpura gam,jiva ji na chapra ,rajiv nagar & and other different places in Navrangpura ward in West Zone (ARC)
279317
8/25-26 (T.N.22)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Yes
Municipal Commissioner, Ahmedabad
₹29,900
Yes
21 Feb 2026
21 Feb 2026
21 Feb 2026
6 Mar 2026
21 Feb 2026
Excavation for pipe line trenches for water
supply, sewerage lne, manhole etc. all with
shoring and struting if required as per required
gradient and line including safety provisions
1 using site rails and stacking excavated stuff
including up to all required lead cleaning the
site etc. complete for all lifts and strata as
specified.(GWSSB SOR 2022-23 Item No.1
Page No.32)
A 250.00 Upto 1.50 mt depth Cmt
B 100.00 1.5 mt to 3 mt depth Cmt
C 50.00 3.00 mt to 4.50 mt depth 103.00 Cmt
D 25.00 4.50 mt to 6.00 mt depth Cmt
Extra rate over item of excavation of earth for
excavation of asphalt pavement/RCC of
thickness up to 0.20 meter including
2 demolishing the asphalt carpet,metal,soiling
/cutting reinforcement etc.comp. with stacking
the material as directed. (based on previously
approved rate by CE sir SOR 2015-16
A 25.00 up to 0.20 meter thickness (By Manual) Smt
Up to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc
complete.
0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc
complete.
Refilling the pipeline trencheds incl. ramming,
watering, consolodating desposal of surplus
3 stuff as directed within a radius of 3 km.
(GWSSB SOR 2022-23 Item No.14 Page
A 75.00 Refilling as directed 22.00 Cmt
B 25.00 including all lead Cmt
Conveyance charge of earth,lime,murrum,
building rubbish,manual garbage,sludge
4 200.00 ,excavated rock,fly ash, aggregate of any kind 125.33 Cmt
etc. comp. up to 5Km. lead (Based on Building
SOR 2015-16, P-589 - Item code- 3.2.1)
Providing and supplying ISI Standard RCC
pipes (of sulphate resisting Cement )in
standard lengths of following class and
diameter suitable for rubber ring joints (socket
and spigot) including all taxes,insurance,
5 transportation,treight charges,octroi,inspection
charges, loading,unloading, conveyance to
departmental stores, stacking etc. complete
(GWSSB SOR 2022-23 10.1.D Page No.15)
Class NP3 Test pressure 0.7 Kg/Sq.Cm
A 400.00 300 mm dia 755.00 Rmt
B 400.00 450 mm dia 1361.00 Rmt
C 350.00 600 mm dia 1946.00 Rmt
Lowering, laying and jointing R.C.C. pipes in
C.M.1:1 1/2 of following diameters in proper
position , grade and alignment at all level as
directed by Engineer-in- charge including
6 conveyance from stone to site of work, labour
giving hydraulic testing as per ISI code.
(GWSSB SOR 2022-23 11.2 Page No.39)
A 400.00 300 mm dia
B 400.00 450 mm dia
C 350.00 600 mm dia
Constructing Slab type M.H. Chamber of the
following size including excavation, refilling,
brick bats cement concrete (1:5:10) of
thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick
cement plaster inside & outside (Only for shaft)
in CM 1:3, finishing with cement slurry, P/F
mm dia M.S.Steel HDPE coated steps 35 cm
c/c at 35 cm staggered in masonary CM 1:5,
RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
including Cantering & reinforcement (double
jalli at 15 C.M. c/c bothway 12 mm dia.) but
excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter
(Inside Clear, M.H. length should be parallel to
the flow, for pipe dia <= 800 mm) (Based on
Drainage SOR 2009-10)
1.00 to 2.00 meter depth, (Slab at Ground
level)
2.00 to 3.00 meter depth, (Slab at below
B 5.00 mt. From G.L.) No
3.00 to 4.00 meter depth, (Slab at below
C 3.00 mt. From G.L.) No
5.00 to 6.00 meter depth, (Slab at below
D 2.00 mt. From G.L.) No
7.00 to 8.00 meter depth, (Slab at below
E 2..00 mt. From G.L.) No
Constructing Bombay Pattern Type Catch Pit of
size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick
brick maso. wall in the prop. of CM (1:6) with
40 mm thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement plaster inside
the catch pit in the proportion of CM (1:3) with
out jali etc. comp. as directed. (As per R.A.
Based on Building SOR 2015-16)
CatchPit Jali Fixing P/F FRC catch pit jali with
frame 600mm x 600mm clear opening etc.
comp. As directed by engineer in charge.
(Based on Central Store Rate)
Making connection to the ex. M.H.in running
sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any
10 convenient time. All damaged work shall be
well repaired as per instructions.
etc..complete. (Based on Drainage SOR 2009-
a 5.00 a. 150 mm to 300 mm dia. 1339.28 No
b 2.00 b. 400 mm to 600 mm dia. 2232.14 No
Cutting the pipes of following dia coming in the
new M.H.in running sewer including cutting
bars, including removing debris /silt from the
M.H. and carting at a suitable distance
11 etc..complete as directed. No payment for M.H.
work will be made until pipe is not cut
completely in all respect. (Based on Drainage
150 mm to 300 mm dia.
400 mm to 600 mm dia.
Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work
and repairing by brick masonry in C.M. 1:5
and plaster in C.M. 1:3 and fixing C.I. steps
12 and existing MH sheet cover, removing the
debris from MH and carting the same as
directed. (Based on Drainage SOR 2009-10)
a 5.00 (A) up to 0.15 mt. (@ Two Coarse) No
b 5.00 (B) up to 0.35mt. (@ Four Coarse) 1160.71 No
c 5.00 (C) up to 0.65 mt. (@ Seven Coarse) 1794.64 No
d 5.00 (D) up to 0.90 mt. (@ Ten Coarse ) 2160.71 No
RCC Precast M.H.Frame & Cover Manufacture
, supply & Delivery at store or at side of work
Precast RCC M200 Frame & Cover Suitable to
13 drainage M.H. and as per type design &
Drawing including cost of reinforcement M.S.
Angles or Flat , cutting mold work etc.(GWSSB
SOR 2022-23 10.4 Page No.16)
a. Heavy Duty
1 15.00 Frame Suitable for 50 Cm opening of MH 1255.00 No.
2 15.00 Cover Suitable for 50Cm Opening Of MH No
b. Light Duty
Frame Suitable for 50 Cm opening of MH
2 15.00 Cover Suitable for 50Cm Opening Of MH No
Brickwork using common burnt clay building
bricks having crushing strength notless than
35kg./Sq.Cm. in foundation and plinth in
14 100.00 Cement Mortar 1:5 (1-Cement:5-finesand) 2576.16 Cmt
(B) Conventional (Item Code: 06001BA, Item
No. 6.12 Building works, Ahmedabad City
Providing and laying cement concrete
work 1:2:4 (1- Cement:2-Coarsesand:4-
graded stone aggregates 20mm nominal
size) and curing complete excluding cost
15 15.00 of formwork and rein for cement for reinforced 3236.16 Cmt
concrete work in (A)Foundations,footings,Base
or columns and Mass concrete (upto 10 ton)
(Based on Building SOR 20015-16)
Providing Dead Cantering using good quality
Country Wood Planks, wall Plate of required
thickness and size including placing the
nece. supports of reqd. size, nailing, fixing
16 20.00 with mortar, levelling. All specification for 312.50 smt
dead centring as per standard engg. practice
etc. comp. as directed.
Providing 15mm thick cement plaster in single
coat on Rough (Similar)side of single or half
brick walls for interior plastering upto floor two
level and finished even and smooth in (i)
17 35.00 Cement mortar 1:3 (1- cement:3-sand) 132.47 smt
finishing with a floating coat of neat cement
(I.No.17.6 + 17.69 R & B SOR 2021-22)
Providing & Supplying Hitachi Machine -200
capacity on rental basis in case of emergency
situation and break down type work & also
19 10.00 during unavoidable condition as per instruction 2410.71 hr
of engg.incharge , rate includes all nece.
shifting,fuel and operating
Providing & Supplying JCB Machine on rental
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of engg.incharge,
rate includes all nece. shifting, fuel and
operating charges and stacking of useful &
21 20.00 non-useful materials separately up to store. 535.71 Hour
(No payment should be allowed for non
working condition of machinery and for pipe
line excavation and laying work) (Based on
Previously approved rate by CE sir )
Supplying electric breaker machine for RCC
slab or asphalt demolishing work on site by
using operator, fuel, power supply etc.complete
as directed. (no payment should be allowed for
22 20.00 non working condition of machinery and for 1071.42 Shift
pipe line excavation and M.H. work. Allowed
only for break down work) (Based on
Previously approved rate by CE sir )
Providing and installation of barricading with retro-
reflective paint/ film/ tapes (Minimum 3.0Mt. height) as
specified in the drawing & specifications for the construction
of road work, along with necessary diversion arrangement for
existing traffic movement in an unobstructed condition, all
relevant markings, sign boards and illumination as per
relevant MORT&H specification. Precoated galvanised iron
profile sheets shall be of approved make and shade having
0.50 mm (+0.05 %) total coated thickness with zinc coating
120 grams per sqm as per IS: 277, in 550 mpa steel
grade, 5-7 microns epoxy primer on both side of the sheet
and polyester top coat 15-18 microns. Rate to be inclusive of
all materials, fabrication works, paint works for information
(retro reflective paint), foundation works, transportation,
loading, unloading, installation, dismantling and inclusive of
all taxes and including the same design for providing
openable gates. No extra rental will be given to the contractor
in case of any delays from his part for construction or due to
any valid time limit extensions. Each barricading sheet is to
be numbered with a unique number. The barricading
provided shall be retained in position at site continuously i/c
shifting of barricading from one location to another location
as many times as required during the execution of the entire
work till its completion. Rate include its maintenance for
damages, painting, all incidentals, labour materials,
equipments and works required to execute the job. The
barricading shall not be removed without prior approval of
Engineerin- Charge. (Note :- One time payment shall be
made for providing barricading from start of work till
completion of work i/c shifting. The barricading provided
shall remain to be the property of the contractor on
completion of the work). Blinkers are to be installed on the
barricading and rate for blinkers will be payable as per
relevant item.
Barricading is to be cleaned by means of
Supplying Pneumatic Breaker Machine for
RCC Slab or Asphalt Demolishing Work on site
by using Operator, fuel, power Supply etc.
Complete as Directed. (No payment should be
24 10.00 allowed for non working condition of machinery 535.71 Hr
and for pipe line excavation and M.H. work.
Allowed only for break down work) (Based on
Previously approved rate by C E sir )
Hiring of tractor with trolley considering 8 Hrs.
25 25.00 as working day hours incl.Driver (Item no. 7, 2104.09 Day
Part-2 E, Misc., GWSSB SOR 2022-23)
Total Amount
Total Amount
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
West Zone, Zonal Office", 2nd Floor, A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013.
Municipal Commissioner invites Percentage Rate sealed tenders from interested
MEMORANDUM OF WORKS IN BRIEF
Maintensnce work And Existing Catchpit Repairing And New Catchpit
Construction at swastik cross road , stadium cross road ,Nehru nagar
,bhudarpura gam,jiva ji na chapra ,rajiv nagar & and other different
places in Navrangpura ward in West Zone (ARC)
2 Time Limit 12 Months
3 Tender Validity Period 120 Days from the date of opening of the tender
4 Eligibility Criteria Register “E-1” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
5 Estimated Cost put to Rs.
6 Earnest Money Deposit Rs.29,900 (D.D. / Pay Order / Local Micr Check/B.G. in favour of Municipal
Commissioner, Ahmedabad /) To be submitted as below. Demand Draft or Bank
Guarantee shall be from Nationalized Bank / Sheduled Bank and valid for 120 days. (As
per Latest AMC finance dept.circular).
7 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank Guarantee/
Demand Draft / Local MICR Cheque. & attched ANNEXURE - 1 finance
dept.circular No- 14 Dt.4/6/13
8 Tender fees Rs.1500/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to Assistant
Manager (west zone),Ahmedabad Municipal Corporation, West Zone,
Zonal Office", Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad.
date. 07-03-2026 & 12:00 pm
10 Tenders issue date Tenders from the AMC website www.amc.nprocure.com &
www.nprocure.com shall be down loaded from AS PER TENDER NOTICE
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.. The
Tenders. tenders received after latest schedule date and time will not be entertained
under any circumstances. date. 07-03-2026 &12:00 pm
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum (only
Techanical Bid) to Assistant Manager / Dy.C.E.(W/Z) office, 2nd Floor,
Dr. Ramanbhai Patel Bhavan,Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013 date. 07-03-2026 &15:00
13 Mode of sending the Document shall be physically submitted in sealed envelope By
Tender Documents and RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (One
evalution of tender Original & One Duplicate) duly sign & seal by contractor
Tenders received without EMD shall be considered as Non-Responsive and
shall be rejected outright.
14 Terms, Condition, & All general condition of contract of Form B1 condition of contract shall
Specification be applicable..
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at his own expense
any defect which may develop or may be noticed before the period mentioned
hereunder from the certified date of completion, The within 15 days of receipt of
the notice. In the case of failure on the part of the contractor, the Engineer-in-
charge may rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate the whole or
any part of the amount of security deposit towards the expenses, if any, Incurred
by him in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore (amount put
tender), the period shall be 6 months from the certified date of completion or one
monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include one
(d) For building works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September may be
treated as the last date.
16 Time permitted to start Whenever a work is allotted by Engineering staff, whether minor or major
parts of work of part thereof of any amount, the contractor shall be bound to start the
works within 48 hours of intimation of work. Communication done
telephonically via SMS, Via Whatsapp and through letter / E-mail shall be
considered legal and binding for the same. Failure of comply to start the
works in 48 hours of intimation as above by contractor the contractor shall
be levied penalty of (1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2) Rs.2500 per day (for tenders amounting above 10 Lakhs and
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
Lakhs). Three times failures by contractor shall make contractor
responsible to be black listed unless and otherwise justified properly in
writing / binding within 15 days of last notice of penalty.
17 Compensation for Delay 10% of Remaining work (As per Circular)
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of Tender
And The Same As to be Attached Along With The Tender Document.
19 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
20 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Contractor.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject
any or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer
(West Zone)
AMC Finance dept. circular No – 41, Dt.08/02/2022
ANNEXURE –
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to
March- 31, 2022. The validity cut-off date in the GR is with respect to the date of issue of
Bank Guarantee irrespective of the date of termination of Bank Guarantee. Guarantees issued
or Authorized by Ahmedabad Branch Only.
(1) Commercial Banks:
(1) RBL Bank
(2) Axis Bank
(3) ICICI Bank.
(4) HDFC Bank
(5) Kotak Mahindra Bank
(6) IndudInd bank
(7) DCB Bank
(8) Tamilnadu Mercantile Bank
(9) Ujjivan Small Finance bank
(10) A U Small Finance Bank
(11) Fedaral Bank Bank
(12) Equitas Small Finance bank
(13) Bandhan Bank
(14) Standard Chartered Bank
(2) Co-Operative & Rural Banks of Gujarat
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
(West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (hereinafter called “the
Employer”) invites sealed Tender document from reputed and qualified bidders for the
construction of Works detailed in the Table below:-
No value of works Money Period
. (Rs.) Deposit
1 Providing and laying Stroam Rs. 29,89,317.75 Rs.29,900/- 12 Months
water Drainage line And
upgradation & Maintensnce
work And Existing Catchpit
Repairing And New Catchpit
Construction at swastik cross
road , stadium cross road ,Nehru
nagar ,bhudarpura gam,jiva ji na
chapra ,rajiv nagar & and other
different places in Navrangpura
ward in West Zone (ARC)
2. Interested bidders shall download the tender documents from AMC’s website
www. amcnprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be Rs. 1500.00 in the form of
Demand Draft / Pay Order from any Nationalised Bank in favour of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non
refundable.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for
the Works in the above Table payable at Ahmedabad and drawn in favour of
MUNICIPAL COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest
Money Deposit will have to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) West Zone, 2nd
Floor,Dr. Ramanbhai Patel Bhavan, Usmanpura, Ahmedabad Municipal
Corporation, W.Z. Office, Ahmedabad-380013.
6. The Bids will be opened at the office of Addl.City Engineer (W/Z) , Ahmedabad
Municipal Corporation, 2nd Floor, Dr. Ramanbhai Patel Bhavan, Usmanpura,
Ahmedabad Municipal Corporation, W.Z. Office, Ahmedabad-380013. in the presence
of bidders or their representatives who choose to attend. In the event of the specified
date of bid submission/opening being declared a holiday for the Employer, the bids
shall be received /opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document,
tender fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two
separate envelope (marked as “original” and other marked as “Duplicate”) in schedule time by
RPAD/ Speed Post/ Hand Delivery in duplicate. The Bid envelopes shall be marked as
Tender Document
Tender fee
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be
initialed by the bidder.
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids
received for the package (except those received late) containing the sealed Tender volume
and other enclosures then announce the names of bidders in the presence of bidders or
their representatives who choose to attend on the date and time mentioned in the NIT In
the event of specified date of bid opening being declared as a holiday for the Employer,
the Tender will be opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD,
the amount and validity of EMD furnished with each bid, is valid registration and such
other details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in
the Invitation for Bid and has not been furnished in the form, the bid shall be rejected by
the Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume
accompanied with valid EMD will be taken up for further evaluation. In case, the Bank
does not confirm the EMD, the bid shall be rejected as non-responsive and no further
evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been
properly signed, meets the eligibility and qualification criteria, has the required available
bid capacity, is accompanied by the requisite certificates, undertaking and other relevant
information specified in the bid documents and is substantially responsive to the
requirement of the bidding documents and provides any clarification for ascertaining the
correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer
and will not subsequently be made responsive by correction or modification or withdrawal
of the nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are
determined to be substantially responsive in accordance with Clause 2 and qualified for
award of Contract in accordance with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule
date and time. In the event of specified date of bid opening being declared bidders who
qualify the criteria then bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest
Evaluated Bid Price, provided that such bidder has been determined to be (i) eligible in
accordance with the provisions of Clause 3(General Terms and Condition); and (ii)
qualified in accordance with the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer
will notify the successful bidder by cable/fax and confirmed by registered letter that his
bid has been accepted. This letter shall name the sum which the Employer will pay the
Contractor in consideration of the execution, completion and maintenance of the Works by
the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after
receiving letter of Indent. Time limit of work will commence from the date of issue of
work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details
furnished by him in his bid. Such request by the Employer and the response by bidder shall
be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to
his bid from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids
and recommendations for the award of a contract shall not be disclosed to bidders or any
other persons not officially concerned with such process until the award to the successful
bidder has been announced. Any effort by a bidder to influence the Employer's processing
of bids or award decisions may result in the rejection of his bid.
10. Site Visit
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and
obtain for itself on its own responsibility all information that may be necessary for
preparing the bid and entering into a contract for construction of the Works. The costs of
visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer
to enter its premises and lands for the purpose of such inspection, but only upon the
express condition that the bidder, its personnel and agents, will release and indemnify the
Employer and its personnel and agents from and against all liability in respect thereof and
will be responsible for death or personal injury, loss of or damage to property and any
other loss, damage, costs and expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to
as "the Works") detailed in the table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet
the following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class
and or equivalent. If contractor is not registered with AMC in the relevant class, on
award of contract he shall be required to register himself with AMC within 3 month's
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer,
as the Employer shall reasonably request.Subject to Submition of Succsesful Submition as per
Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid
may be required to provide evidence of the origin of materials, equipment, and services to the
satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined,
grown, produced or manufactured; similarly for equipments and from where the services are
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
bidder; and
General information
All individual firms must complete the information in this form. Nationality information shall
be provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Affidavit.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for
any of the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which
the reasons are attributable to the non-performance of the contractor, consistent history of
litigation awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures
and words) only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by
the Employer.
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a
partner in a joint venture. A bidder who submits or participates in more than one bid for a
contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents.
Failures to comply with the requirements of bid documents will be at the bidder's own risk.
Pursuant to Clause 16, bids which are not substantially responsive to the requirements of the
bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the
bidder and the Employer shall be written in the English language. Supporting documents and
printed literature furnished by the bidder may be in another language provided they are
accompanied by an accurate translation of the relevant passages in the English language, in
which case, for purposes of interpretation of the bid, the English translation shall prevail.
9. Bid Prices
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole
works as described in bidding documents, based on the percentage rate amount in the Bill
of Quantities submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in
figures and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid
for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the
Employer may request the bidders to extend the period of validity for a specified
additional period. The request and the responses thereto shall be made in writing or by
fax. A bidder may refuse the request without forfeiting his bidder agreeing to the request
will not be required or permitted to modify his bid but will be required to extend the
validity of his Bid Security for the period of the extension, and in compliance with
Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or
persons duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder,
in which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time
and date specified in the NIT.
13. Late Bids
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been
accepted, the Employer will direct him to submit the Performance Security and attend the
Employer's office on a date determined by the Employer for signing the Form of Agreement.
to do high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of
original and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing for
the contract in question. The Employer will declare the firm ineligible, either indefinitely
or for a stated period of time, to be awarded a contract by AHMEDABAD MUNICIPAL
CORPORATION if it at any time determines that the firm has engaged in corrupt or
fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those close
to them, or induce others to do so, by misusing the position in which they are placed,
and it includes the offering, giving, receiving, or soliciting of anything of value to
influence the action of any such official in the procurement process or in contract
execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the Borrower,
and includes collusive practice among bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and
contract without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be
liable for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume.
If the Tender volume is submitted without valid documents and without proof of eligibility
criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any
respect or are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety
Laws.(the existing laws as well as framed from time to time). Any penalties laid due to
violation of such laws shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users
of the road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber
cones, traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site.
Necessary florescent marking on traffic signs to be provided so that it should be visible at
night. During night working hours safety in charge personnel shall be provided with
florescent jackets. This shall be Provided at no extra cost by the bidder under attaché
with specified in the tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply
connection or new connection on behalf of AMC. It includes filling the necessary
application to power Supply Company, follow up and getting the supply, filling the
necessary test reports to the power supply company. All official fees including security
deposits and other expenses shall be of initially paid by the contractor. AMC may support
to get the temporary connection and may at its diseretien get the same converted to
permanent connection at the same of AMC if desired do,and contractor shall as no
extra cost support the same. In this case AMC my be as the remaining cost subject to
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the
contract upon any agreement for a commission, percentage, brokerage or contingent
fee. Breach of this warranty shall give the Municipal Commissioner the right to cancel
the contract or to take any other measure as the Municipal Commissioner may deem fit.
The warranty does not apply to commissions payable by the contractor to establish
commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of
this contract or to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out
of or under this Contract against the contractor the same may be deducted by the
Municipal Corporation from any sum then due or which at any time thereafter may
become due to the contractor under this contract and failing that under any other contract
with the Municipal Corporation or from any sum due to the contractor with the Municipal
Corporation (which may be available with Municipal Corporation), or from his retention
money, or he shall pay the claim on demand. The Municipal Corporation reserves the
right to carry out post payment audit and technical examination of the final bill including
all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over
payment when detected not withstanding the fact that the amount of the final bill may be
included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in
respect of any work done by the Contractor or alleged to have been done by him under
the contract, it shall be recovered by the Municipal Corporation from the contractor by
way of all the means prescribed above or if any under payment is discovered by the
Municipal Corporation, any amount due to the contractor under this contract or under
payment may be adjusted against any amount then due or which may at any time
thereafter become due before payment is made to the contractor from him to the
Municipal Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have
become liable and which is chargeable to the contractor, the owner shall have the right to
retain out of any payment then due or thereafter to become due an amount sufficient to
completely indemnify the owner against such lien or claim or if such lien or claim be
valid the owner may be or become due and payable to the contractor. If any lien or
claims remaining, unsettled after all payments are made, the contractor shall refund or
pay to the owner all money that the latter may be compelled to pay in discharging such
lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall
form the part of the contract documents. The full consideration shall be given to such
addendum or corrigendum before submission of tender duly filled in by the contractor.
Therefore, the contractors shall have to kindly refer the tender for such addendum or
corrigendum published by AMC through its website www.amc.nprocure.com &
www.nprocure.com 48 hours prior to the deadline of submission of the tender. Tenderers
shall verify the number of addendum issued and enclose the same with the tender documents
failing which the tenders shall be liable for rejection and no any complaint in respect to this
shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and
the Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid
shall be valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned
as promptly as Early as possible as but not later than 28 days after the expiration of the period
of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed the
agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the
successful bidder shall deliver to the Employer, a Initial Security Deposit Shall be
submitted as per C.E. Circular.in the form of a Bank Guarantee/ DD/Locle MICR
cheque for an amount equivalent to 5% (five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At
present a policy is framed by Audit department of AMC to charge 4% interest for the balance
period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank
guarantee as per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate
for the same.
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time
limit. & As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT
(exculding GST) etc. on material procurement or any other component for the works from
any source shall be borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender
amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent
registration with any other state Govt. or institutions. Copy of registration should be attached
with tender document. Tenderer who was not registred in AMC must be get registred in panel
of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the correction slips made up to 15-08-1999 may be referred. (only
English version) Clause No. -2 liquidated damages for delay shall be overrule by A.M.C.’s
M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be
taken to mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the
absence of specific mention for a particulars point / aspect, the same in the relevant Indian
Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in
its specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or
AMC's Consultant shall not absolve the contractor from the responsibility of replacing
defective materials brought on site or materials used in the work found defective at a later
date. The contractor shall have no claim to any payment or compensation whatsoever on
account of any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall
be removed from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as
well as for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the site
of the work. All excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and concordance
of adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from time
16. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and machinery
on the work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to
the quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding
on the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received
of sanctioned tender and resolution.Within 10 days contractor has to submit SD and after
reciveing SD Work order shall be issue to contractor and the time limit shall be start from the
date of issue of the written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution .Within 15 days contractor has to submit SD and after
reciveing SD work order shall be issue to contractor and the time limit shall be start from the
date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order /
demand draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor
shall have to sign contract paper with AMC. The contractor shall be fined 4% of interest per
year for delay in submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by M.C. Or His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour
shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water for
drinking, washing, sanitation and cleaning down. The contractor will be responsible for all the
costs where applicable of connection, meter installation, water consumed, water required for
testing purposes, disconnection and the laying, maintenances and ultimate removal of any
distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use of
diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their
initial/eligibility criteria mentioned above along with the bid. They shall have also to submit
the income tax clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives
issued by Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work
changes & thereby total amount of work increases/ decreases.
changes & thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding
on the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease the
scope of work. No any claim to that effect shall be entertained. The Municipal Commissioner
also reserves the right to reject any or all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other
special reason (like site is not available and due to unavoidable circumstances arise), after
evaluation of situation the actual date of starting of work will be consider after approval of
Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the
scope of work.
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the
work done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
` <tu mbgbgtost ctslt FhuFh ctfe ftble hfblt 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
11 y: awfJKe
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt sh vwhtk &gj u t ftb btxult Au ylu <ubtk bswhe, vtjF,
ÃjtLx, suFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh sKtg <tu
ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu sh fh<t J^thtle ftuR
awfJKe ykkdult <ublt ftuR stJt Sgtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR
Ôgrf<yu(vAe<u ctkk^ftb rJCtdltu fboathe ntug fu l ntug)<ublu ytvuje btne<elu yt^thu vtA¤&e ftuR stJt
hsw fhJt nfsth hnuNu lnekk. <ublw xuLzh ChJt <&t <ubtkk swst swst CtJ ylu sh ChJt btxu sYhe yuJe <btb
btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu
sJtcsthebtkk&e Axfe NfNu lnekk. msh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk
ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgrw l. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t Bgrw l.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt shuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx +
yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgst bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt
cejbtkk&e fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e sM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk sNtoJuj ftb mkkck^e sM<tJusbtkk sNtoJj
u rJd<btkk rJmkdk <<tlt rfMmtbtk leau sNtoJj
u ¢btlwmth
sM<tJusbtkk sNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fs
1) z[turk Rd
2) xuLzh Vtubolwk CtJvºtf
3) MvuNeVefuNl
z[tuRkkdbtk fs, ytfth, ytkkfzt fsta Ftuxt ntug <tu btvujtkk fs, ytfthlu ylwmhJwk.
1) z[turk Rd
2) xuLzh Vtubole ylwmwra-ce
3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkckk^e Wvhefûttyu rJmkkd<<t ykdl u e ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbtk ytJju rlKog ykkr<b
dKJtbkkt ytJNu.
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atsuo
Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwkk mtawkk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
1c :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule
mkvwKo sJtcsthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb shBgtl bswhtu fu sl<tlt ftuR
btKmlt òlbtj lu lwfNtl &tg <ule sJtcsthe ftuLx[tfxhle hnuNu.vtujem Vhegts &tg <tu <ule sJtcsthe vK
ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtcsthe vK vtujem Vhegtsbt ftuLx[tfxhle hnuNu.CuFz Dme l vzu
<u btxu mjtb<elt vdjt (suJt fu stuhzwkkkkkk ctk^e bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh
bsqhlu Ftztbtkkkkkkkkkkkkk W<thNu <tu ftuLx[[tfxh s vtujem Vhegtsbt sJtcsth hnuNu ylu Bgwrl.ftuvtuho N
u lltu ftuRvK MxtV
ytlt btxu sJtcsth hnuNu lrn.ytxjwk mbSlu s xuLzh ChJwk . Bswhtultu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt sNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t
sYh sKtg <tu xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc bxehegÕm fu ceò
xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR
sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u
ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rsl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcsthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch
yufx/vtujemlt ftgstlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u
ytvJtle hnuNu.
21: ftuRvK ftgstfeg jexeduNl ybstJts Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcsthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkkkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle
ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe
fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
25: atjw ftb shBgtl «tuxufNlle mkvwKo sJtcsthe ftuLx[[tfxhle hnuNu. subtkk vevzt,stuhzt, Cgmwaf ctuzo,ÃjtMxef
vxe,rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwkk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcsthe
ftuLx[tfxhle hnuNu.
2c: M&¤ Wvh atjw ftbdehe shBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt
rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcsthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt shhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu vtu{d{um J^thJtlt ltukk^ fhuj ntug <tu <ulwkk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt
sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu
28: shuf ytRxblt MvuNeVefuNl ybstJts Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl
Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog ytFhe
hnuNu. Jtuxhekd fhJtbtk lrn ytJu fu shhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu
sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt
30: su ftbtubtk atubtmtlt mbgdt¤tlu cts ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e
30 mÃxuBch Mþ^eltu dKJtbtk ytJNu. yt mbg shBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u
mbgdt¤tu cts fhe ftble mbgbgtost dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk
31: ftuLx[tfxhu «J<obtl ybstJts Bgw. ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu muÕm xuût
lu jd<t vwhtJt vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwkkk/ybu yt&e yufhth fhwkk Awkk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk bukk/ybu M&¤le bwjtft< je^e Au
ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e
2) nwkkk/ybu yt&e yufhth fhwkk Awkk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
sM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk /Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (vrùb Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of
work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall
be as per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for
inspection by Municipal Staff. Watering of all the items shall be as per instructions otherwise
no payment shall be made to contractors. Mixing of concrete shall be done by concrete mixer
machine. Arrangements of binding vibrator for R.C.C. works if required shall have to be
made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident.
The contractor shall arrange for barricading at night and arrangement of Pagi at night to direct
the traffic. He shall be responsible for any damage to public. If any incident happen, during
the execution of work. In case of dispute for unseen or overlooked items the decision of the
Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish
during the work and at the time of completion of work and hand over the site with final
finishing of the work as directed. All the rejected materials shall be removed from site within
24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor
shall have to prepare through of bigger size and mix the mortar in the required proportion. In
on case he shall be allowed to mix the mortar either on floor or any finished surfaces. The
contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on
latest SOR or if item is not available in SOR than based on current market rates. In case of
extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of
the propose work the contractor shall carry out the same at his quoted rates without charges
any extra and the contractor will have to carry out the works and he will be paid at the rate
quoted by him. No claim for extra rate for subsequent changes in site and design is
entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors
shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor
will be fully responsible for compliance of the various provisions under contract Act.
and the Rules framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of
the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the
offer on his own during the period. If any tenderer withdraw or makes any modifications or
addition in the terms and conditions of his tender not acceptable to the Municipal Corporation
the Municipal Corporation shall without prejudice to any right or remedy be at liberty to
forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition
delay of start shall be recovered separately from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in
form of demand draft
iv) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R&
B Dept. - Govt. of Gujarat booklets of Building Works & and Road Works
Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
& STAMP (West Zone)
Mobile No.:-
TECHNICAL SPECIFICATIONS
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
TECHNICAL SPECIFICATIONS ITEMS REQUIRED DURING EXECUTION OF DRAINAGE LINE
Item No. Excavation for foundation up to 1.5 tm. depth in all type of hard and soft soil including
1 sorting out stacking of useful material & disposing of excavated stuff up to 50 tm. lead
loose or soft soil, girding, lighting, fencing the trenches', and pits. (depth measured from
GL). Etc.comp.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary, concrete
and asphalt road paving work etc. Root of trees met with during excavation shall be stacked at lead of 4’
away from the trenches as per instruction so that it may not damage the sides of excavated trenches. The
sides of trenches shall be vertical and bottom shall be uniformly leveled. The excavated earth shall be
stacked at any place or places shown within 50 mtr. as directed. After completion of the work the site
shall be well dressed and cleared of all rubbish so that it may give decent appearance. Contractor shall
arrange for all materials required for lining out and shall care to preserve the level pegs given. He shall
have to arrange for shorting at his own cost if the soil is found to be loose and sandy. He shall have to
arrange for sorting out brickbats or any serviceable materials found during excavation and shall have to
stock. Nothing extra shall be paid for this. He shall have to cart the excavated soil to site shown within
mtr. If so ordered by officer in charge of this work. No old brickbats recovered from excavation shall be
allowed to be used by the contractor in the work. The depth of foundation will be as per drawing.
Contractor should arrange for safely measures so that there is no danger of falling any men or animal in
the excavated portion, otherwise he will be held responsible for the compensation to be paid as the case
may be. He should also arrange for red lamp at night times. The contractor should not damage any of the
municipal property, water lines, electric cables etc. at the time of excavation. Water lines, electric cables
etc. coming in the way will be shifted by corporation but he should see that no damage is done for gross
negligence on his part, otherwise such damages will be recovered from him. Excavated stuff will be
stacked at the site shown or will be carted by the contractor immediately as per the other item of this
tender. Instructions of C.E. or his representative will be strictly followed. Measurement shall be given on
Cmt. basis.
Excavation for foundation up to (a) Up to 0 to 2.0 Mt (b) from 2.0 to 3.0 mt depth (c) from 3.0 to
5.0 mt depth (d) above 5.0 mt depth including sorting out and stacking of useful materials and disposal of
the excavated stuff up to 50 mt. lead.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary, concrete
and asphalt road paving work etc. Root of trees met with during excavation shall be stacked at lead of 4’
away from the trenches as per instruction so that it may not damage the sides of excavated trenches. The
sides of trenches shall be vertical and bottom shall be uniformly leveled. The excavated earth shall be
stacked at any place or places shown within 50 mtr. as directed. After completion of the work the site
shall be well dressed and cleared of all rubbish so that it may give decent appearance. Contractor shall
arrange for all materials required for lining out and shall care to preserve the level pegs given. He shall
have to arrange for shorting at his own cost if the soil is found to be loose and sandy. He shall have to
arrange for sorting out brickbats or any serviceable materials found during excavation and shall have to
stock. Nothing extra shall be paid for this. He shall have to cart the excavated soil to site shown within
mtr. If so ordered by officer in charge of this work. No old brickbats recovered from excavation shall be
allowed to be used by the contractor in the work. The depth of foundation will be as per drawing.
Contractor should arrange for safely measures so that there is no danger of falling any men or animal in
the excavated portion, otherwise he will be held responsible for the compensation to be paid as the case
may be. He should also arrange for red lamp at night times. The contractor should not damage any of the
municipal property, water lines, electric cables etc. at the time of excavation. Water lines, electric cables
etc. coming in the way will be shifted by corporation but he should see that no damage is done for gross
negligence on his part, otherwise such damages will be recovered from him. Excavated stuff will be
stacked at the site shown or will be carted by the contractor immediately as per the other item of this
tender. Instructions of C.E. or his representative will be strictly followed.
Measurement shall be given on Cmt. basis.
Item No.2 (a) Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC
of thickness
upto 0.20 meter including demolishing the asphalt carpet,metal,soiling/cutting
Reinforcement etc. comp. with stacking the material as directed.(app.rate)
(b) 0.20 meter to 0.30 meter (By Breaker Machine including cost of operator, fuel, &
transportaion etc complete.
(c) 0.30 meter & above (By Breaker Machine including cost of operator, fuel, &
transportaion etc complete.
Extra rate for excavation of asphalt pavement of any thickness including demolishing the
asphalt carpet, metal, soiling etc. complete with stacking the materials as directed. The
road surface of asphalt shall carefully be opened to full width as directed by the Engineer
in charge Asphalt, popada's spouls, metals etc shall be separately deposited in such
places as may be determined by the Engineer-in-charge. In case above materials not
being so deposited or being mixed up with the excavated materials will not be allowed for
refilling. The cost of materials shall be charged from the contractor. The decision of the
C.E. shall be final and binding to the contractor.
The rate per sq. mt. in this item shall be paid extra addition to the rate for excavation Mode of
measurement: The rate shall be for a unit of Smt Basis.
Item No. Refilling the pipeline trencheds incl. ramming, watering, consolodating desposal
3 of surplus stuff as directed within a radius of 3 km.
The rate per Cu.mt. in this item shall be paid Refilling the pipeline trencheds
: The rate shall be for a unit of Cmt Basis.
Item No. Conveyance charge of earth ,lime,murrum, building rubbish, manual garbage,sludge
4 ,excavated rock ,fly ash, aggregate of any kind etc. comp. Up to 5.0 Km. lead
All the surplus earth etc. shall be carried away immediately from the site of work to a place within
5 km. distance or as directed and ordered by the Engineer, so as not to cause any inconvenience to the
public traffic finding which in view of public safety and traffic convenience. The Corporation shall carry
out the work by any other agency at the contractor’s risk and cost. if the instructions are not complied
within 7 days from the date of order to cart the surplus materials and clear the site, the said work shall be
carried out by the Municipal Corporation at the risk and cost of the contractor and no claim or dispute
shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same
shall be carried out by the contractor without asking any extra rate. The contractor shall have to cart the
surplus earth after the trenches we will watered and refilled with the sand. The rate of carting including
carting of brick bats, metal, rubble vegetable and garbage, if necessary to clear the road surface.
Mode of measurement:-
The rate shall be for a unit of Cmt basis
5-6 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling, transporting
pipes to work site, unloading lowering in trnch such as cementsand, hemp bitumen as
directed, incl. watering the trenches spreading and cartingaway of surplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement joints
in C.M.1:1 proportion in proper position , grade and alignment at all level as directed by
Engineer-in- charge including conveyance from stone to site of work, Jointing material
A)…………do…….(b)10 cm dia line
B)………do ............. (c)15 cm dia line, 20cm line
C)……………do….(c)23 cm dia line
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved quality make
and shall be brought on site after approval. (The pipes shall be laid in grade as per instruction.)Contractor
shall have to procure bills for standard pipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarn dipped in
hot asphalt and caulking tools. The hydraulic pressure test shall be given to the contractor for testing pipes
and jointing. No trenches shall be filled without the approval of the engineer in charge.
The rate of the pipe work are including of excavation and refilling. The excavation etc. shall be
done as follows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on the plan and
section. In all sorts of soil including old masonary, asphalt roads and wet excavation.
The sewer excavation shall be commenced at the down stream end of the sewer and be
continued up to the gradient as directed. The trench shall not open more than 60 mts. in advance of the
completed sewer only when directed by the engineer in charge looking to the progress of the work in
obtaining the formation of the bottom of the trenches the usual methods of using sign rails and boning
roads shall be adopted during the whole of the process. The centre line of uniform height shall be carried
clearly on each rail. The depth of the excavation and invert of the sewer shall be checked by means of
boning road of approved length and also by straight edge. The bed of the trench shall be well rammed
before starting laying of sewer lines and cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering of
shorting work looking to the nature of the soil near big or important structure, the sides of the trenches
shall be closely and securely timbered, if any settlement of the buildings in anticipated the timbering shall
be left in the ground. The various materials excavated shall be separately stacked so that in refilling that
may be relayed on the same order as before and least possible damage shall be done carpet on the public
roads and private properties. Surface covering consisting of asphalt carpet shall be kept on side and
preserved for reinstatement. The excavated earth shall not be heaped near the trenches so as to caused
unnecessary obstruction along the trenches during inspection trenches etc. shall be tunneled under only as
necessary. The side of the trenches shall be nearly vertical and plumb and red light shall be placed at each
end at intervals and instructions and further protected by rope fence. Necessary caution boards shall also
be created and as directed by the engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not be placed
nearer than three meters from the outer edge of the excavated trenches. The utmost shall have to be taken
in refilling the trenches so that no damage may be done no sewer, no lump shall be allowed to be put
around the sewer. The ramming of the filling shall be done and well watered.
The surplus earth shall be removed directed within 30 meters lead. The measurements of the
work shall be exact length and width of the trenches as specified or as per City Engineer instruction and
depth shall be measured vertical as per section up to invert or the pipeline. The City Engineer reserves the
right of extra excavation on either side if considers necessary for the safety of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directed before any
concrete is in dia. In case the excavation is done deeper than required no filling shall be allowed to bring
the formation to proper level but contractor shall have to lay cement or lime concrete of filing or other
acceptable materials as directed by the City Engineer at contractor own cost so as to come to proper
formation. In case bad formations are met with the work shall have to be done as per instruction of City
Engineer. Necessary arrangements for watering trenches must be provided by contractor and without
proper watering trenches will not be allowed to be filed to further Contractor shall have to make
arrangement for access to invert of the sewer and for inspection of the work as ordered by the engineer. If
it is required to shift or after the alignment section of diameter of the pipe the contractor shall carry out
the altered work at the rates quoted by him for the original work for items and contractor shall not claim
any expenses due to the changes made.
In no case work shall be done at night or no Sundays & other holidays and during the recess time
except in and other holiday the case of bad grounds such as running sand where the work must be executed
vigorous day night without interruption when so ordered by the engineer. All existing water pipe storm
drains sewer line railway track, electric cables etc. which do not in the opinion of engineer required to be
changed in location shall be supported and protected from injury by the contractor. The contractor shall be
liable to pay all damages to water-pipe, drains electric and telephone cable and to private property during
the execution of this contract and the same will be recovered from the running bills or the deposit of work
change location of any existing sewers drains etc. not otherwise from in these specification the contractor
shall do the work of making such change and the work shall be paid for as extra work. All places utility
etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side stops done without prior approval of the engineer
in charge.
The excavation of trenches shall be done foot wider on each side of the pipe than the inside
diameter of the sewer in case of depth excavation exceeding 3 meters above invert, one feet wider
excavated on either side for the upper depth above 3 meters shall be allowed and paid for. Wherever
natural soil demands winder excavation the mentioned above the same shall be given after approval of
City Engineer. The rate for excavation for easy jointing and caulking nothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the lines
are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering for layers of 0.50 mtrs. Further refilling shall be done thereafter and
process should be repeated till trenches are completely refilled. Temping and ramming with rammers
shall have to be done at all place of
important work where ordered by Engineer in charge. After order to refill the trench is give the
trenches shall have to be refilled within 4 days with complete watering. If the contractor fails to do
watering satisfactory corporation shall get it done at the risk and cost of the contractor with or without
giving any notice and the expenses incurred in doing so recovered from the contractor either in cost or
from his payment through bills.
The rate shall be per meter basis.
The rate per Cmt. in this item shall be paid extra addition to the rate for excavation
Item No. Providing and supplying ISI Standard RCC pipes (of sulphate resisting Cement )in
7 standard lengths of following class and diameter suitable for rubber ring joints (socket
and spigot) including all taxes,insurance, transportation,treight charges,octroi,inspection
charges, loading,unloading, conveyance to departmental stores, stacking etc. complete
Class NP3 Test pressure 0.7 Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in proper
position , grade and alignment at all level as directed by Engineer-in- charge including
conveyance from stone to site of work, labour giving hydraulic testing as per ISI code.
(a) 300 mm internal diameter B) 450 Mm Internal Diameter (C)500 Mm Internal
Diameter, (D)600 Mm Internal Diameter (E)900 Mm Internal Diameter (F) 1000 Mm Internal
Diameter (G)1200 Mm Internal Diameter
The RCC pipes shall be procured as per ISS for B Class type specifications using best materials, first class
workmanship as per IS 458/1971 of NP2 / NP3 class as per specified in the tender item. The proportion of
concrete shall be one part of cement to 2 parts sand and 4 parts of black trap agg. mix. of suitable size to
as to produce uniform concrete through out thickness of the pipes.
Reinforcement in form of bars straight and class wise shall be provided as per IS458 class specifications.
RCC spun pipe collars for the pipes shall be made in the same manner. The internal dia meter of the collar
shall be sufficiently large to allow a perfect joint around the outside of the pipes with cement mortar and
other plastic materials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially prepared formation
or on concrete bed and for the purpose to extra rate shall be given making extra excavation for bed and in
the sides of the trenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in the length. For
each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned and moistured and the
collar shall be kept in position by means of wedges. Semidry cement mortar of prop. 1:1 shall be forced
into joints and chaucked completely by means of special cutting tools until the whole space is full. The
mortar shall be sprayed around the collar joints so as to completely encase the joint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and if he has any
doubt as to their soundness be may required the contractors to cut open and clear away the cement of any
found, they shall be required to open more than one joints in 18mt (60’) of pipe, though if defect be found
the Engineer direct them to open as many joints as he may deem necessary, the joints made one day will
not as a rule, be inspected until the following day and the cement may has sufficient time to set well
before being covered up.
Trenches shall not be filled until alignment and levels are examined by the Engineer or his subordinates
and the permission for refilling is granted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using best materials first
class workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line of NP3 class.
The proportion of concrete shall be one part of cement to 2 parts of sand and 2parts of black trap agg. Mix
of suitable size so as to producing firm concrete thought thickness of the pipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/ class specifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of the collar
shall be sufficiently large to allow a perfect joint around the outside of the pipes with cement mortar and
other plastic materials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on specially prepared
formation and for the purpose no extra rate shall be given for claming such hollows in bends and in the
sides of the trenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in the length for
each joint diped is not asphalt after the joint has been properly cleaned & moisture and collar kept in
position by means of wedges, semi-dry cement mortar prop. 1 ;1 shall be faced into it and caulked
completely by means of specials caulking tools until the whole space in full. The
mortar shall be sprayed off in the form of filler around the pipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly to gradient.
M/S shall be in RMT.
Trenches shall not be filled in until the line has been tested and alignment and levels are examined by the
Engineer or his subordinates and the permission for refilling is granted.
Contractor shall be held responsible for any damage or defect to the pipe line in satisfactory working of
the same for 12months after it is put into commission, contractor must satisfy IS 458/1971 and
IS783/1959 with reference to RCC pipe.
Item No.8 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt
including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of
CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick
cement plaster inside the catch pit in the proportion of CM (1:3) with out jali etc. comp.
as directed. (As per R.A. Based on Building SOR 2015-16)
(a) Excavation : This be done as specification in Item No.
(b) Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and
mixed properly on wooden or specially propared platform until every part of the brockbats is
sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface.
The surface must be kept damp during and after consolidation & in laying consecutive layer the lower
coars should be well watered & mode lough be for the next is placed.
(c) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in water
is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm
If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall
be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship like
manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The face
work should be neatly finished. The work shall be keptwaterd for work at least after date of completion.
(d) C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to
the channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber
shall be as per the respective item of work. The manhole/inspection chamber shall be constructed as per
the detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).
The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channels shall also be similarly
constructed with respect to the benching out at their junction with the main channel as appropriate fall
suitable rounded off in the direction of flow in the main channel shall be given. The channel at the
bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers over
mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed. All
castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall have
a raised chequered design on the top surface to provide an adequered nonslip grip. Cover shall be capable
of easy opening and closing and it shall be fitted in the frame in workmanship like manner. The cover shall
be gas tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous composition. The
coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item shall be
executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item Making connection to the ex. M.H.in running sewer incl. Dewatering and other
No.10 required machinery etc. of following dia pipes at any convenient time. All
damaged work shall be well repaired as per instructions. etc..complete.
(Based on Drainage SOR 2009-10):
Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany impurities
and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing
and mixed properly on wooden or specially propared platform until every part of the
brockbats is sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface.
The surface must be kept damp during and after consolidation & in laying consecutive layer the lower
coars should be well watered & mode lough be for the next is placed.
(c) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in water
is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm
If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall
be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship like
manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The face
work should be neatly finished. The work shall be keptwaterd for work at least after date of completion.
(d) C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the channel.
(e) Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to
the channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber
shall be as per the respective item of work. The manhole/inspection chamber shall be constructed as per
the detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3). The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channels shall also be similarly
constructed with respect to the benching out at their junction with the main channel as appropriate fall
suitable rounded off in the direction of flow in the main channel shall be given. The channel at the
bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers over
mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and
frames shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.
They shall be neatly dressed and carefully trimmed. All castings shall be free from voids whether due to
shrinkage, gas inclusion or other causes. Covers shall have a raised chequered design on the top surface to
provide an adequered nonslip grip. Cover shall be capable of easy opening and closing and it shall be
fitted in the frame in workmanship like manner. The cover shall be gas tight and water tight. The size of
covers specified shall be considered as the clear internal dimensions of the frame. Covers and frames shall
be coated with a black bituminous composition. The coating shall be smooth and tenaceous. The frame of
manhole/inspection chamber cover shall be firmly embeded to correct alignment and level in cement
concrete on the top of the masonry. The item shall be executed as per the detailed drawing and as directed
by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item 1) Cutting the pipes of following dia coming in the new M.H.in
No.11 running sewer including cutting bars, including removing debris
/silt from the M.H. and carting at a suitable distance etc..complete
as directed. No payment for M.H. work will be made until pipe is
not cut completely in all respect. (Based on Drainage SOR 2009-
3) (a)Excavation : This be done as specification in Item No.
(b) Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and
mixed properly on wooden or specially propared platform until every part of the brockbats is
sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface.
The surface must be kept damp during and after consolidation & in laying consecutive layer the lower
coars should be well watered & mode lough be for the next is placed.
(c) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in water
is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm
If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall
be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship like
manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The face
work should be neatly finished. The work shall be keptwaterd for work at least after date of completion.
(d) C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the channel.
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to
the channel of manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber
shall be as per the respective item of work. The manhole/inspection chamber shall be constructed as per
the detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall be
constructed of such thickness as shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3). The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channels shall also be similarly
constructed with respect to the benching out at their junction with the main channel as appropriate fall
suitable rounded off in the direction of flow in the main channel shall be given. The channel at the
bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers over
mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed. All
castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall have
a raised chequered design on the top surface to provide an adequered nonslip grip. Cover shall be capable
of easy opening and closing and it shall be fitted in the frame in workmanship like manner. The cover shall
be gas tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous composition. The
coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item shall be
executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item 1) Repairing damaged M.H. and rasing M.H. up to road level incl. removing
No.12 damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster
in C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing
the debris from MH and carting the same as directed
(a) Excavation : This be done as specification in Item No.
(b) Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall
comply with specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany
impurities and size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and
mixed properly on wooden or specially propared platform until every part of the brockbats is
sufficently coated with mortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface.
The surface must be kept damp during and after consolidation & in laying consecutive layer the lower
coars should be well watered & mode lough be for the next is placed.
(c) Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in
P.W.D. hand book No.2 The brick shall be wellburnt and free from any defects shall be got approved by
the Enginur in charge be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement
mortar for the brick work shall be one parts of cement to six part of sand every brick well soaked in water
is required to be ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm
If after removal of centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall
be racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan
working to the proper dimension & as directing by the officer in charge from the time to time bricks
should be throughly in water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement
mortar shall be prepared in special iron pans and mixed in quantites as required using measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case may be all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonary should be constructed in proper workmanship like
manner with joints plunb etc. to conform with general specification No.45 P.W.D hand book. The face
work should be neatly finished. The work shall be keptwaterd for work at least after date of completion.
(d) C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm.
well graded as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate
includes all necessary materuals mixing laying and remain and watering the exposed faces tobe finished
with neat cement as per instruction the channel shall be half round and as per drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of the channel.
(e) Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in
uniform thickness with surfaces truely in plumb. The work in general shall comply with general specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water
drains, Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble.
The maximum distance between inspection chambers shall be about 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall be
fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the respective item
of work. The manhole/inspection chamber shall be constructed as per the detailed drawings and as
directed by Engineer. The bed concrete and the brick masonry shall be constructed of such thickness as
shown on drawing. The brick masonry shall be constructed in
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3). The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channels shall also be similarly
constructed with respect to the benching out at their junction with the main channel as appropriate fall
suitable rounded off in the direction of flow in the main channel shall be given. The channel at the
bottom of manhole / inspection chamber shall be plastered with
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambers over
mtr in depth and shall be of cast iron conforming to IS:5455. These rungs shall be fixed staggered in two
vertical runs, 300 mm apart horizontally and 300 mm c/c vertically. The top rung shall be 450 mm below
the manhole/ inspection chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and shall conform
to the requirements given in IS:1726. The covers and frames shall be cleanly cast and they shall be free
from air and sand holes and from clod shuts. They shall be neatly dressed and carefully trimmed. All
castings shall be free from voids whether due to shrinkage, gas inclusion or other causes. Covers shall have
a raised chequered design on the top surface to provide an adequered nonslip grip. Cover shall be capable
of easy opening and closing and it shall be fitted in the frame in workmanship like manner. The cover shall
be gas tight and water tight. The size of covers specified shall be considered as the clear internal
dimensions of the frame. Covers and frames shall be coated with a black bituminous composition. The
coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item shall be
executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed
by engineer in charge or Additional City Engineer (south zone)
Mode of measurement:
The rate shall be for a unit of one number basis.
Item No. RCC Precast M.H.Frame & Cover Manufacture , supply & Delivery at store or at side of
13 work Precast RCC M200 Frame & Cover Suitable to drainage M.H. and as per type design
& Drawing including cost of reinforcement M.S. Angles or Flat , cutting mold work etc
Mode of measurement:
The rate shall be for a unit of Nos Basis
Item No. Brickwork using common burnt clay building bricks having crushing strength notless
14 than 35kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5 (1-Cement:5-
finesand) (B) Conventional (Item Code: 06001BA, Item No. 6.12 Building works
Rate includes connection in the sewer line at any convenient time when the load on the drainage line in
less. All damaged work shall be well repaired as per instruction of officer in charge. Proposed R.C. C.
line should be connected with the existing M.H. as directed. Holes made in the well of existing M.H.
should be finished smooth and in circular shape as directed. Rate also includes making new channel or
repairing existing damaged channel if instructed. Rate is inclusive of watering etc. as directed.
Mode of measurement:
The rate shall be for a unit of Nos Basis
Item No. Providing and laying cement concrete work 1:2:4 (1- Cement:2-Coarsesand:4-
15 graded stone aggregates 20mm nominal size) and curing complete excluding
cost of formwork and rein for cement for reinforced concrete work in
(A)Foundations,footings,Base or columns and Mass concrete ng in the new M.H. in running
sewer of any dia pipes at any convenient time when M.H. is found empty all damage work shall be well
repair instruetions etc. comp.
material shall be cut as pes requirement to Cutting the pipe in existing manhole reinforcement bars shall
also have to be cut in existing manhole as per requirement and making good the same. the dis mental
materials shall be carried ti places at all lead as directed by engineer in charge If directed the work shall
have to be done at night the measurement shall be as per nos
Mode of measurement:
he rate shall be for a unit of Nos Basis
Item No. Providing Dead Cantering using good quality Country Wood Planks, wall Plate of
16 required thickness and size including placing the nece. supports of reqd. size,
nailing, fixing with mortar, levelling. All specification for dead centring as per
standard engg. practice etc. comp. as directed.
Required level shall be achieved in brick work as specified including plaster, the thickness of joints shall
not exceed 10 mm (3/9”). In no case the frame shall be supported by chips or broken brick or asphalt mix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface of an
asphalt road/concrete pavement. The frame shall be bedded in cement mortar on the brick work with
splayed filler all around.
Water: Gully frames being on the edge of road shall be fixed to the correct road level at its upper end and
the slope should be such it must be about (12 mm) (1/2”) lower than water table.
A concrete pavement should be case around the frames and covers of man-holes, chambers etc.
in case of asphlatic road.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4) as specified and
directed. The pavement shall be at least 8 mm (3”) wider than the outer most edge of the circular frame no
pavement will be made of this pavement under the item of cement concrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’) in external
measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the longer dimension being
along the direction of the main.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4 C.C. No
payment will be made for the pavement should be at least 8 cm (3”) wider than the outer most edge of the
After removing the top portion of the manholes, the proper brick masonry layer with c.m. (1:4)
should be constructed for proper bondage with old masonry and 8 cms thick PCC work (1:2:4) should be
laid on the top of brick layer an up to the bottom of the seat. After fixing the seat the manhole should be
properly leveled with road level.
Filling with cement concrete the spaces around the manholes, chambers, etc. shall be clean
within 48 hours of concreting day.
M/S shall be given on No basis.
Item No. 1) Providing 15mm thick cement plaster
17 in single coat on Rough (Similar)side
of single or half brick walls for interior
plastering upto floor two level and
finished even and smooth in (i)
Cement mortar 1:3 (1- cement:3-
sand) finishing with a floating coat
of neat cement slurr
Mode of measurement:-
The rate shall be for a unit of one number basis
Item No. Supplying electric breaker machine for RCC slab or asphalt demolishing work on site
22 by using operator, fuel, power supply etc.complete as directed. (no payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H. work
Mode of measurement:-
The rate shall be for a unit of one number basis
Item No. Providing and installation of barricading with retro- reflective paint/ film/ tapes (Minimum 3.0Mt. height) as specified
23 in the drawing & specifications for the construction of road work, along with necessary diversion arrangement for
existing traffic movement in an unobstructed condition, all relevant markings, sign boards and illumination as per
relevant MORT&H specification. Precoated galvanised iron profile sheets shall be of approved make and shade having
0.50 mm (+0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 550 mpa steel
grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Rate to be inclusive of
all materials, fabrication works, paint works for information (retro reflective paint), foundation works, transportation,
loading, unloading, installation, dismantling and inclusive of all taxes and including the same design for providing
openable gates. No extra rental will be given to the contractor in case of any delays from his part for construction or
due to any valid time limit extensions. Each barricading sheet is to be numbered with a unique number. The barricading
provided shall be retained in position at site continuously i/c shifting of barricading from one location to another
location as many times as required during the execution of the entire work till its completion. Rate include its
maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job.
The barricading shall not be removed without prior approval of Engineerin- Charge. (Note :- One time payment shall
be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided
shall remain to be the property of the contractor on completion of the work). Blinkers are to be installed on the
barricading and rate for blinkers will be payable as per relevant item.
Providing kachcha or pakka dummy in the following dia pipes and removing the same after the
connecting of the work as per instruction of engineer in charge. If kachcha or pakka dummy is not
removed by the contractor then the penalty shall be laid as per municipal rules or
Item No. Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
24 using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H. work
Measurements shall be given on hr. basis.
Item No. Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver
25 Raising of Existing manhole item includes,cutting of existing road surround by Manhole by diamond
cutter machine dismantling of road in confined area by breaker machine and carting of dismantal
material.item also included necessarey brick work to raise the manhole at road level in CM 1:3 item also
included fixing of Manhole frame at exact road level by using MaserEmaco S 488 trowable fibre
reinforced thixotropic repair mortal material Laying of concrete made form Master Emaco 5 346 flowable
micro concrete material in desired thickness and laying of hot bitumanous material in Upper layer and
compaction of hot bitumanious material by palte compactor machine .Rate also included necessary plaster
at inside of manhole in CM 1:3 in 20 MM thickness on raised brickwork.
Measurements shall be given on no. basis.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
Mobile No.:-
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and
Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is
employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child
labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court Judgement and
also will be prosecuted by concerned authority. Because of the breach of any provision of child labour prohibition and
regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date
06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining
amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same
shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These
shall form a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be
necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly
filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published
by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same
with the tender documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be
entertained under any circumstances.
Clause : 5 Schedule Of Maintanance
Contractor Should have to manage following condition for maintanance as per Engineer instruction
Sr.no. Mode Of Complaint Required machinory / Labour Remarks
Either Whatsup or Email Required as per site Condition or
3 Engineer Instruction
Complaint Received by higher
Authority / Councilor/ by Public
If Contractor Not Follow Schedule Of Maintanance
1. Whenever a work is allotted by Engineering staff, whether minor or major of part thereof of any amount, the contractor
shall be bound to start the works within 48 hours of intimation of work. Communication done telephonically via SMS
,ViaWhatsapp and through letter /E-mail shall be considered legal and binding for the same.
2. Failure of comply to start the works in 48 hours of intimation as above by contractor the contractor shall be levied
penalty of (1) Rs.1000/-per day (for tenders amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders amounting
above 10 Lakhs and upto 30Lakhs), (3) Rs.5000 per day (for all tenders amounting above 30Lakhs).
3. Three times failures by contractor shall make contractor responsible to be blacklisted unless and otherwise justified
properly in writing/binding within 15days of last notice of penalty.
4. The Contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with the
prevailing AMC circulars issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
Mobile No:-
Mobile No.:-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 22.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .