Senior Manager,Engineering
RO amaravati
Providing New Gate pillars along with New Gate New name Board at CFS Vizag AP
2026_CWC_290029_1
CWC/RO-Engg. /AMRVT/NIQ-07/2026-27/
Open Tender
Civil Works
Works
25 days
CFS Vizag
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Central Warehousing Corporation
₹5,300
7 Sept 2026
7 Sept 2026
15 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge
Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used .600 mm dia piles
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (a) TMT bars of grade Fe-500 D or more.
Centering and shuttering -Columns, piers,pillars, abutments, posts & struts
Reinforced cement concrete work in walls ( any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc. up to floor five level excluding cost of centring , shuttering , finishing and reinforcement .a) 1 : 1.5 : 3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size ) derived from natural sources.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a)In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m including getting out the excavated soil adn disposal of surplus excavated soil as directed within a lead of 50 m a)All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Total Amount (in Rs.)
Items of works
All Items of Civil works based on DSR 2023
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
NIQ07VIZAGGATE.xls
Other Document • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .