| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38.7 CrAccepted-AOC 534 ASHIRVAD MAL GODAM ROAD SULTANPUR 228001 | SULTANPUR | SULTANPUR | UTTAR PRADESH | 228001 | ₹38.7 Cr Quoted ₹39.0 Cr | 1 | Accepted-AOC Work in progress |
| 2 | 2₹40.3 Cr+₹1.3 Cr (3.21%)Rejected-Finance | ₹40.3 Cr+₹1.3 Cr (3.21%) | 2 | Rejected-Finance Higher Rate |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Non-Responsive |
| Sl No | Description | Qty | Unit | ANGELIC INFRACON PRIVATE LIMITED L1 | Globalzone Sanitory Infrastructure Pvt. Ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | TYPE-4 Residence (Civil Work) :
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1 . 5 m in width as well as 1 0 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.2.6.1 | 5,480.76 | Cum. | 127 ₹6,96,055.91 Lowest | 127 ₹6,96,055.91 Lowest |
| 2.00 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.2.25A | 2,115 | Cum. | 503 ₹10,63,845 Lowest | 503 ₹10,63,845 Lowest |
| 3.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.2.27 | 219.5 | Cum. | 1,527 ₹3,35,176.5 Lowest | 1,527 ₹3,35,176.5 Lowest |
| 4.00 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration 2.35.3.1 | 1,410.26 | Sqm | 222 ₹3,13,077.72 Lowest | 222 ₹3,13,077.72 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)4.1.8 | 324.81 | Cum. | 4,899 ₹15,91,224.44 Lowest | 4,899 ₹15,91,224.44 Lowest |
| 6.00 | Applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per square metre on Plinth Beam after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.4.13 | 192.83 | Sqm | 105 ₹20,247.15 Lowest | 105 ₹20,247.15 Lowest |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete5.9.1 | 81.64 | Sqm | 282 ₹23,023.33 Lowest | 282 ₹23,023.33 Lowest |
| 8.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers5.9.5 | 2,746.08 | Sqm | 529 ₹14,52,676.32 Lowest | 529 ₹14,52,676.32 Lowest |
| 9.00 | Columns, Pillars, Piers, Abutments, Posts and Struts 5.9.6 | 58.23 | Sqm | 691 ₹40,236.93 Lowest | 691 ₹40,236.93 Lowest |
| 10.00 | Thermo-Mechanically Treated bars work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. 5.22.6 | 2,538.68 | Qtl. | 7,756 ₹1,96,90,002.08 Lowest | 7,756 ₹1,96,90,002.08 Lowest |
Tender Value
₹40.3 Cr
EMD Value
₹50.3 L
Closing Date
12 Jun 2026, 12:30 pmClosed
SE PMGSY Circle PWD Varanasi
SE PMGSY Circle PWD Varanasi
Construction work of Tyep-4 Residentional Building in Distt Bhadohi
2026_CEPMP_1156910_1
618/35Building-PMGSY Dt 16.05.2026
Open Tender
Civil Works - Buildings
Item Wise
Bhadohi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
Yes
₹50.3 L
Yes
Varanasi
16 Sept 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | TYPE-4 Residence (Civil Work) :
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1 . 5 m in width as well as 1 0 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.2.6.1 | 5,480.76 | Cum. | 1 | ₹5,480.76 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.2.25A | 2,115 | Cum. | 1 | ₹2,115 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.2.27 | 219.5 | Cum. | 1 | ₹219.5 |
| 4 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration 2.35.3.1 | 1,410.26 | Sqm | 1 | ₹1,410.26 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)4.1.8 | 324.81 | Cum. | 1 | ₹324.81 |
| 6 | Applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per square metre on Plinth Beam after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.4.13 | 192.83 | Sqm | 1 | ₹192.83 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete5.9.1 | 81.64 | Sqm | 1 | ₹81.64 |
| 8 | Lintels, beams, plinth beams, girders, bressumers and cantilevers5.9.5 | 2,746.08 | Sqm | 1 | ₹2,746.08 |
| 9 | Columns, Pillars, Piers, Abutments, Posts and Struts 5.9.6 | 58.23 | Sqm | 1 | ₹58.23 |
| 10 | Thermo-Mechanically Treated bars work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage. 5.22.6 | 2,538.68 | Qtl. | 1 | ₹2,538.68 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.82 MB
CBDT4.pdf
Tender Documents • 3.51 MB
BOQ_2167797.xls
BOQ • 0.52 MB
REVNIT.pdf
PDF • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .